1200-44-PW-08
Inspection Scheme
UT wall thickness measurement required at areas of high turbulence or areas where water may collect,
such as bends, downstream of control valves, changes in flow direction, low points, drain connections,
dead-legs, etc. Radiography may be considered as an alternative for wall thickness measurement where
insulation removal is problematic.
1200-44-PW-08
All inspection and reporting is to be carried out in accordance with "C080-INEO-K-KF-0001-Rev 1.4 -
Inspection and Reporting Procedure".
Note 1: No previous inspection locations were noted on IH sheet, “IH Piping Rev 0. Siri and Satellites to
INEOS.xlsx”. As such new locations have been selected.
44-PW-09
56-DO-02
44-PW-08