1200-57-DC-02

Internal Damage Mechanism Threat


CO₂ Corrosion Credible
Preferential Weld Corrosion Credible

Inspection Scheme

UT wall thickness measurement required at areas of high turbulence or areas where water may collect,
such as bends, downstream of control valves, changes in flow direction, low points, drain connections,
dead-legs, etc.
1200-57-DC-02

CML No. Component Inspection Required


Type
ST1, ST2 Straight (>2”) UT Band Scan wall thickness inspection of the full circumference of
the pipe. Record the lowest measured thickness across the full
circumference of the pipe.
BE1, BE2 Bend (>2”) UT Band Scan wall thickness inspection of the full circumference of
the bend. Record the lowest measured thickness across the intrados,
extrados and both sides of the pipe.
WE1-WE4 Weld (>2”) A combination of compression and shear wave UT should be used to
identify areas of wall loss on the identified welds due to the threat
of preferential weld corrosion.

All inspection and reporting is to be carried out in accordance with "C080-INEO-K-KF-0001-Rev 1.4 -
Inspection and Reporting Procedure".

Note 1: 4 previous weld inspection locations were noted on IH sheet, “IH Piping Rev 0. Siri and Satellites
to INEOS.xlsx”. It was not possible to correlate these to locations on the isometrics based on the
information contained within the reports – as such alternative locations have been selected.
1 2 3 4 5 6 7 8 9 10 11 12

56 SP=6.0 barg
PSV
0500

2"-DO-56-0120-AC22-0
A NO INS A
56
LI H INS 5603 5601

0001 L 5601 TO HAZARDOUS


2"X1"
OPEN DRAIN
NOTE 6 2"-DO-56-0103-AC22-0
C080-KV-P-XC-5605-01

5701

TO CLOSED DRAIN
HEADER
6402 2"-DO-56-0110-AC22-4
56 C080-KV-P-XC-5703-01

64-GI-01
PT
FROM INERT 1"NEJS71T
0001B
GAS SYSTEM 1"BLJS71T 1"CHJS71T 64NE0011 56
PI 2"BLAC22R
64 5701
1"-GI-64-0111-JS71-0 FI
56BL0022 56GT0025
C080-KV-P-XC-6405-01 0509
0001A
5603
0.75" GTADOIR
B 64BL0009 64CH0010 B

6402
5603
56 56
PT PT

2"-DO-56-0193-AC21-0
2"CHAC22R
0001A 0001A 56CH0021

56 PDS-071
PI
0504

VA-02
56 0.75" GTADO1R
LI
56GT0020 5701
0001 56
PS01
5603 5601
4303
4303
56 56 0.75" GTAC00R VENT TO SAFE
LT LT

2"GTAC1OR
43-GT0070 LOCATION

56GT0019
0001 0001
4"X2" 2"X4" 4"-VA-43-0006-AS20-0
FROM CONTAMINATED WATER
C 2"BLACOOR
NOTE 12 C
LIFT PUMP CAISSON JS71

2"X1"
5701
AS20 43-BL0069
C080-KV-SC100-P-XC-3305-01 CLOSED DRAIN

56-DO-02
RS 6"BLAC1OR
N7 N8 N9 4303 57BL0020 HEADERS
NOTE 13 6"-DC-57-0020-AC21-0
N10
NOTE 10 2" NOTE 11 5603 C080-KV-P-XC-5703-01
N6 8" N5B
N5A N11 CSC

5601
5601 5701

5603
HAZARDOUS OPEN DRAIN 3" 3" 4303
57-DC-01 4303

4303
5603
FROM SEPARATION MODULE OVERFLOW
10"-DO-56-0004-AC21-0 AC21
N1 FROM RECLAIMED
C080-KV-P-XC-0041-01 AC22
RS OIL SUMP
4"GTAC1OR 6"-DO-56-0001-AC22-0
56GT0015 C080-KV-P-XC-5705-01
N4
CSO 4"GTAC10R
AC22

NOTE 9
6"BLAC1OR

NOTE 4
56GT0024

5601
5601 5603

5603
AC21 56BL0023
D D
HAZARDOUS OPEN FROM RECLAIMED
DRAIN HEADER OIL SUMP
12"-DO-56-0102-AC21-0 N2 56 3"-DC-57-0048-AC21-0
C080-KV-P-XC-5605-01 LE C080-KV-P-XC-5705-01
RS
0001

57-DC-02
5602 NOTE 6
OVERFLOW FROM DIESEL
STORAGE TANK 62-TB01 56
8"-DO-56-0119-AC21-0 N3
PT NOTE 2,7
C080-KV-P-XC-6200-01 0001B
56-PS01
4"GTAC1OR
56GT0017 NOTE 8 5603

5603
5602
56L0119
3M ABOVE LAT
56L0040
5602
2"-DO-56-0190-AC21-0 LAT
E E

RS
DRAIN FROM SOUTH/EAST
2.5M BELOW LAT
PEDESTAL CRANE, 73-MX02
3.5M BELOW LAT
5M BELOW LAT
5602

FROM NON-HAZARDOUS 10M BELOW LAT


DRAIN SUMP
2"-DO-56-0105-AC21-0
C080-KV-P-XC-5600-01 4"GTAC1OR
15M BELOW LAT
56GT0018

5602

FROM DRAIN GULLY


2"-DO-56-0217-AC21-0
C080-KV-P-XC-6200-01
F
56-DO-01 5603
F

5602 56-TX01
OVERFLOW FROM DIESEL NOTE 5
STORAGE TANK 62-TB02
8"-DO-56-0118-AC21-0
C080-KV-P-XC-6200-01

6"

5602

FROM NON-HAZARDOUS
OPEN DRAIN HEADER
8"-DO-56-0040-AC21-0
G C080-KV-P-XC-5603-01 G

NOTES :
1. SYSTEM FOR SAMPLE CONNECTION AT DRAIN CAISSON OUTLET. TAG NUMBER 56-TX01 TAG NUMBER 56-PS01
NOTE 1
2. PUMP ELEVATION TO BE 3M BELOW LAT. DRAIN CAISSON
SERVICE DRAIN CAISSON SERVICE
3. TOP ENTRY. PUMP
3.5C 20.12.2013 AS-BUILT GENERAL UPDATE FAJ KTS FLL
4. STILLING TUBE. MOTOR TAG NO. 56-DE01
3.5B 27.05.2011 AS-BUILT DUE TO GENERAL UPDATE, RAMBLL JNXH KTS KGR
5. VESSEL TRIM NO. FOR 56-TX01: DIM. ID x L mm 1524 x 74125 DENSITY AT P/T kg/m3 850
N7 8"-DO-56-0051-AC21-0 3.5A 27.07.2010 JNXH KTS KGR
N8 2"-DO-56-0052-AC21-0
DESIGN/OPER. PRESS. Barg 3.5/0.3 FLOW AT P/T m3/h 5 AS-BUILT DUE TO WO20423390, RAMBLL
SIRI
DESIGN/OPER. TEMP . ^C -7 & 50 / AMB DISCHARGE PRESSURE Barg 7.0 3.5 27.06.07 UPDATED DUE TO WO: 20405798 LNT CATRO KKOES
6. 56LT0001 IS MEASURING TOP OF OIL LEVEL. INTERFACE LEVEL IS GIVEN
MATERIAL CARBON STEEL DIFFERENTIAL PRESSURE Bar 6.6 3.4 20.12.04 ISSUED FOR CONSTRUCTION, WON 20405798 ATJ JKC ADN ADN
IN CALCULATION TOGETHER WITH THE PRESSURE TRANSMITTERS.
SHAFT POWER kW 6.8
H 7. PUMP TO BE STOPPED MANUALLY WHEN OIL/WATER INTERFACE IS 3.5 M BELOW LAT 3.3 04.11.04 ISSUED FOR DESIGN, WON 20405798 ATJ JKC ADN ADN Drawing title
INSULATION CODE, THICKN. MATR. NONE MATERIAL 316 SS
OIL LAYER THICKNESS IS THEN 1M.
8. 56PT0001B TO BE SUBMERGED TO 15 M BELOW LAT.
2.5A 31.01.05 RAMBLL, AS-BUILT DUE TO WO: 20383484 JNXH ATJ UTILITY P&I DIAGRAM
2.5 06.09.02 RE-AS-BUILT/WON: 20023022 EA FJP FJP FJP
9. INERT GAS TO BE PURGED AT 3M ABOVE LAT. VENDOR ENGINEERING SPECIALTIES INC. VENDOR ING. PER GJERDRUM DRAIN CAISSON
Scale Area System No. Tag No.
PURCHASE NO. EM320 PURCHASE NO. EM271 2.4A 20.11.02 NORTH DECK (DONG PROJ. 20176131) ATJ SUI ADN ADN
10. OIL RISER. Drawing
11. OIL RISER WITH SAMPLER. 2.4 20.08.02 ISSUED FOR CONSTRUCTION (DONG PROJ. 20176131 ) ATJ ADN ADN ADN
C080-KV-P-XC-5615-01
12. SAMPLING POINT FOR OXYGEN ANALYSIS. PUMP SHALL NOT BE IN USE WHEN OXYGEN CONTENT IS MORE THAN OR EQUAL TO 5%. N.T.S A00 56 Rev.
Made Chk’d Disc. Proj. Proj. Orig. Dwg. Sequ. Sheet
13. SPOOL PIECE TO BE INSTALLED WHEN PUMPING TO DRAIN CAISSON Rev. Issue date Reason for issue