You are on page 1of 1

Takeoff Sheet for Dike 2 (IPC 8) Takeoff Sheet for Dike 2 (IPC 8)

For the Contractor For the Consultant For the Contractor For the Consultant

___________ ___________

Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Elev=360.21

Elev=360.21
Offset =-1.5

Offset =1.5

Offset =-1.5

Offset =1.5
Offset =0.0

Offset =0.0
___________ ___________

Elev=355.36

Offset =11.2
Offset =-12.5

Elev=354.63

Offset =12.7
Elev=354.69

Offset =-12.9
Elev=354.51
STN = 4+020 , STN = 4+040 ,
Alignment Name = Dike 2 Alignment Name = Dike 2

FEDERAL DEMOCRATIC REPUBLIC ENSIRAD Civil Systems Engineering Plc. Afar Construction Corporation Tendaho PC-16 Irrigation Block
OF ETHIOPIA Tel: +251-116 -677684 Rehabilitation and Flood Protection Dike
Mobile: +251-930-000079 Maintenance Work
Gurd Shola Behinde Ethio Ceramics Bldg.