Professional Documents
Culture Documents
Method Statement For Suspended Ceiling Installation
Method Statement For Suspended Ceiling Installation
Before entering the area of operation, all staff will go through the health and
safety introduction. Employees will only be provided access permissions when
they have completed their induction.
Ror trailer will be through a ladder fastened to the truck or trailer’s side.
Prior to beginning any job on site, all staff must get a safety induction/training.
Job supervisors must have a pre-job STARRT/TBT meeting to inform workers
about job-specific dangers.