Method Statement For Suspended Ceiling Installation
Method Statement For Suspended Ceiling Installation
SCOPE
This method statement specifically addresses the ceramic tiling works in general for
Process of Installation
Additional supplement framing and supports must be supplied if the ceiling is
suspended below ducting, pipes, or other building elements that are not
appropriate for ceiling attachment.
Additional supplement framing and ports must be supplied if the ceiling is
suspended below ducting, pipes, or other building elements that are not
appropriate for ceiling attachment.
Hangers must be spaced no more than 1.2 inches apart and fastened to the
hanger inserts above.
Ror trailer will be through a ladder fastened to the truck or trailer’s side.
Controlling Health and Safety Risks
Before beginning any activity, ensure that the work permit and any
accompanying documentation, such as RAMS, are signed and approved.
Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
Ensure that staff has received manual handling training.
Use mechanical devices to avoid needless heavy manual handling of materials.
Prior to beginning any job on site, all staff must get a safety induction/training.
Job supervisors must have a pre-job STARRT/TBT meeting to inform workers
about job-specific dangers.