Method Statement For Suspended Ceiling Installation
Method Statement For Suspended Ceiling Installation
Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
Notifying the QC engineer and issuing the checklist (inspection request for
approval/checklist – Annex A, including all clearances as applicable in a timely manner
when work is ready for inspection.
2. SCOPE
This method statement specifically addresses the ceramic tiling works in general for
Process of Installation
Additional supplement framing and supports must be supplied if the ceiling is
suspended below ducting, pipes, or other building elements that are not
appropriate for ceiling attachment.
Additional supplement framing and ports must be supplied if the ceiling is
suspended below ducting, pipes, or other building elements that are not
appropriate for ceiling attachment.
Hangers must be spaced no more than 1.2 inches apart and fastened to the
hanger inserts above.
Ror trailer will be through a ladder fastened to the truck or trailer’s side.
Prior to beginning any job on site, all staff must get a safety induction/training.
Job supervisors must have a pre-job STARRT/TBT meeting to inform workers
about job-specific dangers.