PRE-PRODUCTION MEETING REQUIREMENTS PPM R
SERIAL NO :
01. Gold Seal Sample (GSS) / Red Tag 4
Sample (RTS) 5
02. PO Sheets 6
03. Tech Pack 7
04. Fabric Approval & Test Report With
Composition Report 8
05. 4 Point Inspection Report With Shade 9
Band Report 10
06. Risk Assessment Report, Sample
Guideline From Sample Section
07. Trim Card Approval
08. Size Set Garments With Measurement
Report
Guideline From Sample Section
07. Trim Card Approval
08. Size Set Garments With Measurement
Report
09. Print Measurement (If Any)
PRE-PRODUCTION MEETING REQUIREMENTS
01. GOLD SEAL SAMPLE (GSS) / RED TAG
SAMPLE (RTS)
02. PO SHEETS
03. TECH PACK
PPM REQUIREMENTS CHECKLIST
SERIAL NO : DESCRIPTION STATUS
1 Gold Seal Sample (GSS) / Red Tag Sample (RTS)
2 PO SHEETS
3 TECH PACK
4 FABRIC APPROVAL & TEST REPORT WITH COMPOSITION REPORT
5 4 POINT INSPECTION REPORT WITH SHADE BAND REPORT
6 RISK ASSESSMENT REPORT
7 SAMPLLE GUIDELINE
8 TRIM CARD APPROVAL
9 SIZE SET GARMENTS WITH MEASUREMENT REPORT
10 PRINT MEASUREMENT (IF ANY)