OPERATIONAL PERFORMANCE TEST / Standard

NOTE: 1 mm=0.03937 in
ZAXIS180W
Reference
PERFORMANCE TEST DESIGNATION Performance Remarks
Page
Standard
LUBRICANT CONSUMPTION Hour meter: 1000 hours or
48 or less T4-3-12
(Rated output) mL/h less
TRAVEL SPEED km/h(100 m) T4-4-1
Engine speed control mode
Fast Speed 27.5±2.0 selection switch: Pedal
Shift Lever: D
Engine speed control mode
Slow Speed 7.2±0.5 selection switch: Pedal
Shift Lever: L
Engine speed control mode
Creeper 3.3±0.3 selection switch: Creeper
Shift Lever: L
TRAVEL SPEED (for Germany) km/h(100 m) T4-4-1
Engine speed control mode
Fast Speed 20.0±2.0 selection switch: Pedal
Shift Lever: D
Engine speed control mode
Slow Speed 5.2±0.5 selection switch: Pedal
Shift Lever: L
Engine speed control mode
Creeper 2.6±0.3 selection switch: Creeper
Shift Lever: L
SERVICE BRAKE FUNCTION CHECK T4-4-2
m
Braking distance at travel speed of 27.5
10.6 or less
km/h
Braking distance at travel speed of 20
6.4 or less
km/h
PARKING BRAKE FUNCTION CHECK T4-4-3
mm/5 min
0

SWING SPEED sec/3 rev 14.0±1.0 Bucket empty T4-4-4


SWING FUNCTION DRIFT CHECK T4-4-5
860 or less Bucket empty
mm /90°
SWING MOTOR LEAKAGE mm/5 min 0 Bucket loaded T4-4-6
MAXIMUM SWINGABLE SLANT ANGLE 20.0 or possibly Bucket loaded T4-4-7
deg. more
SWING BEARING PLAY mm 0.2 to 1.25 Allowable limit: 2.0 to 3.05 T4-4-8

T4-2-2
OPERATIONAL PERFORMANCE TEST / Standard

NOTE: 1 mm=0.03937 in
ZAXIS180W
Reference
PERFORMANCE TEST DESIGNATION Performance Remarks
Page
Standard
HYDRAULIC CYLINDER CYCLE TIME 0.70 m3 (PCSA heaped) T4-4-10
sec bucket, bucket empty.
Mono boom with 2.70 m arm.
2 piece boom with 2.70 m
arm.
Boom Raise (Mono Boom) 3.5±0.3
Boom Raise (2 Piece Boom) 3.5±0.3
Boom Lower (Mono Boom) 2.8±0.3
Boom Lower (2 Piece Boom) 3.0±0.3
Arm Roll-In 3.5±0.3
Arm Roll-Out 3.0±0.3
Bucket Roll-In 2.8±0.3
Bucket Roll-Out 2.1±0.3
Positioning Raise 5.8±0.5
Positioning Lower 3.4±0.3
Stabilizer Raise 1.8±0.3
Stabilizer Lower 1.9±0.3
Blade Raise 1.9±0.5
Blade Lower 2.0±0.5
DIG FUNCTION DRIFT CHECK mm/5 min 0.70 m3 (PCSA heaped) T4-4-12
bucket, bucket empty.
Mono boom with 2.70 m arm.
2 piece boom with 2.70 m
arm.
Boom Cylinder
15 or less Bucket loaded
(Maximum Reach Position)
Arm Cylinder
20 or less Bucket loaded
(Maximum Reach Position)
Bucket Cylinder
20 or less Bucket loaded
(Maximum Reach Position)
Positioning Cylinder
(Maximum Reach Position) 10 or less Bucket loaded

Front Sink Amount (Bucket Bottom)


150 or less Bucket loaded
(Maximum Reach Position)
CONTROL LEVER OPERATING FORCE T4-4-14
N (kgf, lbf)
Right Hand Lever: Forward/Backward 16 (1.6, 3.6) or
less
Right Hand Lever: Right/Left 16 (1.6, 3.6) or
less
Left Hand Lever: Forward/Backward 16 (1.6, 3.6) or
less
Left Hand Lever: Right/Left 16 (1.6, 3.6) or
less
Steering 20 (2.0, 4.5) or
less

T4-2-3