You are on page 1of 1

1 2 3 4 5 6 7 8

KEY PLAN:

A
LA-5 A

LEGEND:
PLAN
B B
LUP
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE
PAT
R OLL PROFILE
IN GV
EHIC
LE NATURAL GROUND
DESIGN LEVEL

ALL DIMENSIONS ARE IN METER


DETO
UR AH
EAD
500 m 90
DE ROAD DEVIDED
C C
SLO
W
SRA1 SINGLE DIRECTION ARROW

WORKS
AHEAD

SS1 SLOW WARMING SIGN


HEAVY
MACH
INE
WORK
ING

70
Entrance
Vehicle Gate
8m
MW1 MAN AT WORK WARMING SIGN
1,4m Gate
Pedestrian
SLO
W 10,50m

Access Road

60 SLS SPEED LIMIT SIGN 20 TO 70

Entrance
Entrance 8m

Vehicle Gate Gate


Pedestrian
1,4m

10,50m CTV CONSTRUCTION VEHICLE ONLY


50 Access Road

welfare facilities
TO M
1.00 m VERGE

1
0.50m HARDSTRIP

K
W VIS
1.00 m VERGE
0.50m HARDSTRIP

SLO

ER IB
3.65m LANE

LIGILIT
RN1 NARROW ROAD AHEAD SIGN

H Y

welfare facilities
T
GUARD HOUSE
SLO
W
30 LUP BAR
RIC

EXIT
D ADED SFL1 LIGHT SUN FLOWER D
30 20 LE
HIC

20
E

R L ITY
GV

T
IGH
GUARD HOUSE

WE IBIL
HM DETOUR AHEAD
LLIN

TO VIS
O
TR

M
PA

1K
TL Tower light
30 50 70 90 ROAD WORK ENDS
‫ةيقلن قامقي قيرطلا‬

ROAD WORK ENDS


RWE Road Work end

SD Single Direction

KlAS Keep left ARROW SIGN

FM Flag man

E
ENTRANCE AND EXIT VIEW WITH LA-5 PLOT
REV/01 ISSUED FOR APPROVAL 03/10/2023 ENG/ALAM E
ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
PAT
ROL FOR APPROVAL
LING
VEH
ICLE CLIENT: PROJECT MANAGEMENT CONSULTANT:

DETO
UR AH
F EAD

90
500 m F
BECHTEL ENGINEERING COMPANY
SLO
W DESIGN CONSULTANT: CONTRACTOR:

WORKS
AHEAD

HEAVY
MACH
INE
WORK
ING

70
Entrance 8m

Vehicle Gate
1,4m Gate
Pedestrian
SLO
W 10,50m

Access Road
DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

Entrance 8m
60 DRAWN ENG/ALAM 03/10/2023

Entrance
Vehicle Gate Gate
Pedestrian
1,4m

10,50m
CHECKED ENG/ALAM 03/10/2023 CHECKED
Access Road
1.00 m VERGE

APPROVED ENG/ALAM 03/10/2023 APPROVED


50
0.50m HARDSTRIP

1.00 m VERGE

welfare facilities
0.50m HARDSTRIP
3.65m LANE

TO M
1
K
W VIS
welfare facilities

SLO

ER IB
W

LIGILIT
G LUP BAR G

H Y
SCALE NTS SHEET SIZE A0

T
RIC
EXIT

ADED SLO
W
GUARD HOUSE

30 DISCIPLINE NAME:

IC LE CIVIL
EH 30 20
20

R L ITY

GV
T
IGH

GUARD HOUSE
WE IBIL

L LIN Traffic Management Plan


TO VIS

RO
M

T
PA
1K

LA-5-SHEET-1 OF 1
90 PROJECT NAME :
30 50 70 ROAD WORK ENDS
‫ةيقلن قامقي قيرطلا‬

Logistic Facilities in the Connector


(CH 00+000 to CH 75+000)
Work Order No .1100001344/015
INITIAL SITE PREPARATION
NEOM
KINGDOM SAUDI ARABIA
H REGION ASSET CODE CONTRACT CODE H

EXIT OF LA-5 ENTRANCE OF LA-5 ORG


18 606000
DRAWING NUMBER
DISCIPLINE C. DOCUMENT TYPE
1100001344

SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115102 01

1 2 3 4 5 6 7 8

You might also like