NEOM COMMENTS RESOLUTION SHEET (SUBMISSION TO EPM TO NEOM)

NEOM REGION: 10 - The Spine

Contract No. & Title: 1100001344 - Site Preparation Framework Agreement WO/SO/DWP No. & Title: 008 -Initial Site Preparation for EMS and EMR (L1) Coastal Region
REVIEWED DOCUMENT DATA CRS DATA

Transmittal / Workflow ASB-WTRAN-000653 (WF-091527) CRS Identification: 10-606000-1100001344-ASB-CIV-CRS-000147 Revision: 01

WO 008_Initial Site Preparation for EMS and EMR (L1) Coastal Region_ TRAFFIC MANAGEMENT PLAN (C-EMR-02), (C-EMR-03), (C-
Transmittal / Document Title
EMR-04), (C-EMS-11A), (C-EMS-1 & C-EMS-1A) Sheet 01 To 01
Status Code: Incorporate Comments - Proceed B

SHD
Document Type CRS Prepared by (EPM/Reviewer): Mustafa Mubarak

CRS Reviewed by (EPM/Reviewer): Mustafa Mubarak


Discipline(s) involved CIV
Anis Ahmad Ansari Sign Anis
CRS Recommended by (EPM/Reviewer):
04A Mobilization & Construction
Stage Date 28/Feb/23
Initial Site Preparation for EMS and EMR (L1) Coastal Region
Location

Document Originator Organization AWAD SAAD BINZAFRAH Sign


CRS Approved by (NEOM):
Transmittal received date by NEOM / EPM 26-02-2023 Date

Disclaimer : Permission to proceed shall not constitute acceptance or approval of design details, calculations, analyses, test methods or materials developed or selected by the Contractor and shall not relieve the Contractor from full compliance with Contractual obligations and NEOM
requirements
Status Codes: All codes must be as per NEOM Documents NEOM-NPR-PLN-101 (Design Management Plan) & NEOM-NEN-PRC-030 (Project Document Numbering and Revision Procedure)
A = Work may proceed , B = Incorporate Comments - Proceed , C = Revise & Resubmit - Do not Proceed , D= Rejected, E = Review not
required - Proceed
Document / Drawing No. / Relevant Comments Initial Responded Revised
No. Stage Document/DrawingTitle Rev. NEOM`s Reviewer/EPM Comments Originator Response
Section/ Page Discipline made by Status By Status
Required to follow the TCG (Temporary Traffic Management Guide) for shoulder taper
(Transition Area)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD-
04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 0 Construction MM B
108016
(C-EMR-02)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD- Required the minimum effective visibility 1 KM day and night as per TCG (Temporary
1 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B DONE ENG/ALAM
108017 Traffic Management Guide) , required to add the number of towers lights
(C-EMR-02)

Required to follow the TCG (Temporary Traffic Management Guide) for shoulder taper
(Transition Area)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD-
04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B DONE ENG/ALAM
108017
(C-EMR-03)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD- Required the minimum effective visibility 1 KM day and night as per TCG (Temporary
2 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B DONE ENG/ALAM
108018 Traffic Management Guide) , required to add the number of towers lights
(C-EMR-03)

Required to follow the TCG (Temporary Traffic Management Guide) for shoulder taper
(Transition Area)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD-
04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B DONE ENG/ALAM
108018
(C-EMR-04)

670700880.xlsx Page 1 of 6 NEOM CRS Template: 10-000000-0000100854-BEC-DCC-TMP-000001, Rev. 02, SPINE Version
Document / Drawing No. / Relevant Comments Initial Responded Revised
No. Stage Document/DrawingTitle Rev. NEOM`s Reviewer/EPM Comments Originator Response
Section/ Page Discipline made by Status By Status
WO 008_Initial Site Preparation for EMS and EMR (L1)
0-606000-1100001344-ASB-CIV-SHD- Required the minimum effective visibility 1 KM day and night as per TCG (Temporary
3 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B
108019 Traffic Management Guide) , required to add the number of towers lights
(C-EMR-04)

Required to follow the TCG (Temporary Traffic Management Guide) for shoulder taper
(Transition Area)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD-
04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B
108019
(C-EMS-11A)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD- Required the minimum effective visibility 1 KM day and night as per TCG (Temporary
4 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B
108020 Traffic Management Guide) , required to add the number of towers lights
(C-EMS-11A)

Required to follow the TCG (Temporary Traffic Management Guide) for shoulder taper
(Transition Area)

WO 008_Initial Site Preparation for EMS and EMR (L1)


0-606000-1100001344-ASB-CIV-SHD-
5 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B
108021
(C-EMS-1 & C-EMS-1A)

Required the minimum effective visibility 1 KM day and night as per TCG (Temporary
WO 008_Initial Site Preparation for EMS and EMR (L1) Traffic Management Guide) , required to add the number of towers lights
0-606000-1100001344-ASB-CIV-SHD-
6 04A Coastal Region_ TRAFFIC MANAGEMENT PLAN 1 Construction MM B
108022
(C-EMS-1 & C-EMS-1A)

7 Genral Note The TPM drawing is final stage , there is a stage before it. Construction MM B

10

11

670700880.xlsx Page 2 of 6 NEOM CRS Template: 10-000000-0000100854-BEC-DCC-TMP-000001, Rev. 02, SPINE Version
Status Code Over All Code
Green
A Work May Proceed
Yellow
B Incorporate Comments - Proceed
Orange
C Revise & Resubmit – Do not Proceed
Red
D Rejected
E Review not Required - Proceed
Doc. Revision
A

B
C
D
E
F
G
H
01
02
03
04
05
06
07
08