Document 13-215510-1100001344-
Contractor Awad Saad BinZafrah
submittal no. ASB-CIV-ITP-000002_01
To PMC AECOM
Approval Comments
13-215510-110000134
4-ASB-CIV- ITP
1100001344/022- inspection 01
ITP-000002_01 Test Plan for Earthworks (Civil) Information Other
Approval Comments
Information Other
Approval Comments
Information Other
Signature
PMC’s comments
Received by Contractor
pdf
Pdf
Pdf
Pdf
Pdf
Pdf
PDF
FilePDF
PDF 6.01.NEOM
01-NEOM
01.NEOM
01.NEOM
01.NEOM
01.NEOM
01.NEOMBay
Bay
01.NEOM
01.NEOMBay
Bay
Bay
Bay
Bay
Bay
---Luxury
C. EQUIPMENT-Luxury
-Luxury
-Luxury
-Luxury
-Luxury
Luxury
Luxury
Luxury
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions No Weekly Report
01-630000-0000100185-ASB-HRM-CVS-000005
01-630000-0000100185-ASB-ENV-PLN-000003
MONITORING01-630000-0000100185-ASB-QMN-PLN-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-GEO-RPT-000001
01-630000-0000100185-ASB-HRM-CVS-000006
01-630000-0000100185-ASB-HRM-CVS-000007
01-630000-0000100185-ASB-CIV-ITP-000001
01-650000-0000100185-ASB-CPM-INS-000001
01-630000-0000100185-ASB-ENV-PLN-000003
01-630000-0000100185-ASB-QMN-PLN-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-ENV-PLN-000003
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-CIV-ITP-000002
01-630000-0000100185-ASB-CIV-MST-000007
Document 01
02
01
01
03
01
01
01
01
03
01
02
02
01
Revision Date PLAN
Inspection
IN
0000100185/04-DEMOLITION
MANAGEMENT AREA
Statement
0000100185/04-Time-Schedule
0000100185/04-Time-Schedule
0000100185/04-PROJECT
0000100185/04-Time-Schedule
0000100185/04-Method
0000100185/04-Company
0000100185/04-PROJECT
0000100185/04-Curriculum
0000100185/04-PROJECT
0000100185/04
0000100185/04-Inspection
Title Insurance
QUALITY
&QUALITY
B4
ENVIRONMENTAL
QUALITY
10Vitae
8Test
0000100185/04-Time-Schedule
01-630000-0000100185-ASB
Report
12-Dec-2020
No. 01 & Test
Plan
for
PLA
Plan
PLAN
PLAN
Document approval
Signature
1 DOCUMENT REVIEW
Confirm documents:
- Construction Drawing
- Method statement 1- Approved
- Permits Documents R/H R/H R/H
1.1
- Clean Sand, aggregates and Suitable Backfill NEOM Specs 312000, Part -1 2-NEOM Specs 312000
Material Sec 1.1, Part -2 Sec 2.2.
- Sampling, Testing & Review of Test
Reports
Conform to ASTM D 1557,
Existing /borrow fill stockpile material ASTM D 4318, ASTM D
review of test reports (Compaction curve, 2216, ASTM D 422, ASTM Method of Statement /
1.2 Liquid limit, Plastic limit, In-Situ Moisture NEOM Specs 312000, Part 3, D 2487 R/H R/H R/H Special Procedure Approval,
content, Particle size analysis, Soil Sec 3.11, 3.14,3.15,3.16 Stock Material
classification)
2 MATERIAL INSPECTION
Sampling and Soil Testing, Gradation, Soil NEOM Specs 312000 Part 2 Sec 2.1 Approved Material submittal, MIR, and H W W Check List MOB-CIV-CL-05
2.1 AASHTO T-189, ASTM D 2922
Classification, CBR, MDD. Lab Test Reports
AASHTO T-145
Clean Sand and Aggregate Base Course NEOM Specs 312 000 Part 3 Sec 3.20 Approved Material as per NEOM H W W Material Receiving Report
2.2
Receiving Inspection Specs 312000
4 INSTALLATION
1- Test report
NEOM Specs 31 20 00, Part Sec 3.16 WIR will be submitted to ETSD for FDT of
2- Compaction not less than 95%
Section 312000 Clause 3.18 A (1,2,3) each backfilled compacted layer in the
4.2 Fill Placement & Compaction Inspection Survey level check / FDT ASTM D H W W
(NEOM Specs) 3.19 A presence of 3rd party independent lab
1556(Sand Cone Method) or ASTM D
AASHTO T-189, ASTM D 2922 Check List MOB-CIV-CL-07
6938 (Nuclear Method)
4.3 Final Acceptance Inspection NEOM Specs 31 20 00, Sec 3.24 NEOM Specs 310000 & 312000 W W W Approved Survey Report / 3rd Party Reports / Drawing
Legend:
S: Responsible for carrying out random surveillance of
H: Contractor must not proceed without approval. R/H : Responsible for reviewing certification or reports & Approval W: Responsible for / and witnessing all inspection or test.
inspection or test/Random Check.
All Void under and behind sheeting shall be filled Neom Specs 31200,
as sheeting is withdrawn. Part 3 Sec 3.20
A2.
Sheeting shall be cut and left in place where Neom Specs 31200,
damage to the utilities may occur or failure of the Sec 3.4
A3
trench walls may cause damage or failure of
adjoining building or structures.
The Surface course shall be identical to the original Neom Specs 31000,
surface course. The patch shall be rolled in both Sec 3.16
A8
directions with a 5-ton roller so it is compacted to
96% of the Marsha density in accordance with
ASTM D1559
Make sure not to blow rock during clearing and Neom Specs
grabbing work 311000, Sec 3.4
A10
REMARKS:
Contractor PMC-ETSD
Each Sample shall represent not more than Neom Specs 312000
10,000m3 of fill material
A3
50-Kg samples, sealed in airtight containers of Neom Specs 312000
each proposed soil material from on site or borrow Sec 2.1
A4
source
Classification according to ASTM D 2487 of each Neom Specs -
on site or borrow soil material proposed for 312000 Sec 2.1
A5
backfill, fill embankment and subgrade layer
Laboratory Compaction curve according to Neom Specs-
AASHTO T -180 (Method D) Modified Proctor for 312000 Sec 2.1
A6
each on site or borrow soil material proposed for
backfill, fill, embankment and subgrade layer
REMARKS:
Soil material shall comply with the requirement of Neom Specs 312000
NEOM Specs -312000
A2.
B Material Storage
Stockpile borrow soil material and excavated Neom Specs 312000
satisfactory soil materials without intermixing, Sec 3.11
B1
place, grade, and Shape stockpile
B2 Stockpile Soil Materials aways from edge of Neom Specs 312000
Excavations. Sec 3.11
B3 Stockpile areas are to be used by the permission of Neom Specs 312000
the authorities. Sec 3.12 A2
B4 Do not stockpile unsatisfactory soil on site Neom Specs -
312000 Sec 3.12 A3
REMARKS:
Fill material shall be placed in lifts not exceeding Neom Specs 312000
100mm in loose depth for hand – operated Sec 3.16
A2.
compaction.
Compacted surface of fill and backfill shall be finish Neom Specs 312000
graded to the cross sections, lines grades and sec 3.16
A5
elevation as indicated on the drawing.
REMARKS:
Contractor PMC-ETSD