You are on page 1of 3

1 2 3 4 5 6 7 8

KEY PLAN:

Vehicle Gate
Entrance

N
0+325

LA
-2
GA/
0+100

0+125

0+150

0+175

0+200

0+225

Access Road

0+250
0+253
0+075

TE
SL
OC
AT
8m
A A

10,50m

ONI
- G1
&G
2
0+

1,4m
05
0

Pedestrian
Gate
0+300

0+
02
5

B LEGEND:
PLAN
B B
0+275 LUP
LANE EDGE
0+000 ASPHALT EDGE

D
EDGE OF VERGE

D
PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

0+000.00

0+025.00

0+050.00

0+075.00

0+100.00

0+125.00

0+150.00

0+175.00

0+200.00

0+225.00

0+250.00
0+252.80
D D
29.25

28.65

29.65
27.82

28.64
28.38

28.34

30.64
27.56

30.57
28.01
27.51
29.25

29.52

30.33
28.58

29.24

29.79

30.06
28.70

28.97
28.81

30.61
E

0.61

0.87

2.05
0.00

0.43

0.63

2.23

0.69

0.03
0.88
1.07

REV/02 ISSUED FOR APPROVAL 27-05-2023 AGWA

REV/01 ISSUED FOR APPROVAL 29/01/2023 SYED E


ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
FOR APPROVAL

Profile for LA-02 ENTRY


CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00 BECHTEL ENGINEERING COMPANY
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

CONTRACTOR:
HARD STRIP

DESIGN CONSULTANT:
HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 27-05-2023

CHECKED M. AGWA 27-05-2023 CHECKED


APPROVED M. AGWA 27-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

1.5%
PIVOT POINT
PIVOT POINT
PIVOT POINT
PIVOT POINT
1.5% PIVOT POINT PIVOT POINT
1.5% PIVOT POINT CIVIL
1.5% 1.5%
1:1

PLAN / PROFILE / CROSS SECTION ( ENTRY)


4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

1:1
NGL NGL NGL
LA-02-SHEET-1 OF 3
Natural Ground NGL Natural Ground NGL NGL
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground
Natural Ground
PROJECT NAME :
RC 2 Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Logistic Facilities in the Connector
5.00CM THICK ASPHALT CONCRETE WEARING COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
30.00CM THICK AGGREGATE ROAD BASE COURSE
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE Work Order No .1100001344/015
30.00CM THICK AGGREGATE ROAD BASE COURSE TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN. CBR≥80% @ 100% COMPACTION WITH MDD INITIAL SITE PREPARATION
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED NEOM
25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H REGION ASSET CODE CONTRACT CODE H
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A" 18 606000 1100001344
DRAWING NUMBER

Typical CROSS SECTION


ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115032 02

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY PLAN:

0+525

N
25
0+0
A C A

Vehicle Gate
Entrance
0+500

LA
05

-2
/G
Access Road
0+

AT
ES
LO
CA
0+07

TIO
8m
0+255
0+250
10,50m
0+225
0+200
0+175
0+150
0+125
0+100

N-
G3
&
G4
5

1,4m
Pedestrian
Gate
0+475

LEGEND:
PLAN
B B

0+450 C LUP
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

0+254.82
0+000.00

0+025.00

0+050.00

0+075.00

0+100.00

0+125.00

0+150.00

0+175.00

0+200.00

0+225.00

0+250.00
27.45

30.93
28.80

30.09
27.89
27.98

30.50
28.37

29.81
29.15

31.03
28.10

30.42
29.59
28.28

28.86
27.98

30.00

30.84
28.57

31.03

31.03
31.03
29.17
E

0.61
0.83

0.79

0.85

0.53

0.09
0.00

0.76

0.80

0.00
0.68

0.74
REV/02 ISSUED FOR APPROVAL 27-05-2023 AGWA

REV/01 ISSUED FOR APPROVAL 29/01/2023 SYED E


ISSUE NO: DESCRIPTION DATE BY

Profile for LA-02 Exit


PURPOSE OF ISSUE:
FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00 BECHTEL ENGINEERING COMPANY
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

CONTRACTOR:
HARD STRIP

DESIGN CONSULTANT:
HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 27-05-2023

CHECKED M. AGWA 27-05-2023 CHECKED


APPROVED M. AGWA 27-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

1.5%
PIVOT POINT
PIVOT POINT
PIVOT POINT
PIVOT POINT
1.5% PIVOT POINT PIVOT POINT
1.5% PIVOT POINT CIVIL
1.5% 1.5%
1:1

PLAN / PROFILE / CROSS SECTION ( Exit)


4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

1:1
NGL NGL NGL
LA-02-SHEET-2 OF 3
Natural Ground NGL Natural Ground NGL NGL
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground
Natural Ground
PROJECT NAME :
RC 2 Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Logistic Facilities in the Connector
5.00CM THICK ASPHALT CONCRETE WEARING COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
30.00CM THICK AGGREGATE ROAD BASE COURSE
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE Work Order No .1100001344/015
30.00CM THICK AGGREGATE ROAD BASE COURSE TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN. CBR≥80% @ 100% COMPACTION WITH MDD INITIAL SITE PREPARATION
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED NEOM
25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H REGION ASSET CODE CONTRACT CODE H
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A" 18 606000 1100001344
DRAWING NUMBER

Typical CROSS SECTION


ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115032 02

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY PLAN:

0+525

N
25
0+0
A C A

Vehicle Gate
Entrance
0+500

LA
05

-2
/G
Access Road
0+

AT
ES
LO
CA
0+07

TIO
8m
0+255
0+250
10,50m
0+225
0+200
0+175
0+150
0+125
0+100

N-
G3
&
G4
5

1,4m
Pedestrian
Gate
0+475

LEGEND:
PLAN
B B

0+450 C LUP
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

0+254.82
0+000.00

0+025.00

0+050.00

0+075.00

0+100.00

0+125.00

0+150.00

0+175.00

0+200.00

0+225.00

0+250.00
27.45

30.93
28.80

30.09
27.89
27.98

30.50
28.37

29.81
29.15

31.03
28.10

30.42
29.59
28.28

28.86
27.98

30.00

30.84
28.57

31.03

31.03
31.03
29.17
E

0.61
0.83

0.79

0.85

0.53

0.09
0.00

0.76

0.80

0.00
0.68

0.74
REV/02 ISSUED FOR APPROVAL 27-05-2023 AGWA

REV/01 ISSUED FOR APPROVAL 29/01/2023 SYED E


ISSUE NO: DESCRIPTION DATE BY

Profile for LA-02 Exit


PURPOSE OF ISSUE:
FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00 BECHTEL ENGINEERING COMPANY
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

CONTRACTOR:
HARD STRIP

DESIGN CONSULTANT:
HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 27-05-2023

CHECKED M. AGWA 27-05-2023 CHECKED


APPROVED M. AGWA 27-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

1.5%
PIVOT POINT
PIVOT POINT
PIVOT POINT
PIVOT POINT
1.5% PIVOT POINT PIVOT POINT
1.5% PIVOT POINT CIVIL
1.5% 1.5%
1:1

PLAN / PROFILE / CROSS SECTION ( Exit)


4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

1:1
NGL NGL NGL
LA-02-SHEET-2 OF 3
Natural Ground NGL Natural Ground NGL NGL
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground
Natural Ground
PROJECT NAME :
RC 2 Natural Ground

10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE Logistic Facilities in the Connector
5.00CM THICK ASPHALT CONCRETE WEARING COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE
MC 1
MC 1
10.00CM THICK ASPHALT CONCRETE BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
30.00CM THICK AGGREGATE ROAD BASE COURSE
MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE Work Order No .1100001344/015
30.00CM THICK AGGREGATE ROAD BASE COURSE TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN. CBR≥80% @ 100% COMPACTION WITH MDD INITIAL SITE PREPARATION
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED NEOM
25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD.
H REGION ASSET CODE CONTRACT CODE H
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C"
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A" 18 606000 1100001344
DRAWING NUMBER

Typical CROSS SECTION


ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD 115032 02

1 2 3 4 5 6 7 8

You might also like