You are on page 1of 1

JUBAIL 3B IWP RO PROJECT

Minute of meeting Ref.No.

Date
Subject
Prepared By

Attendees:

Copy:

Note, Crossed out names correspond to the people absent from the conference

Issue Description Resp Status

1. Basic design-Documents

2. Process Design-Water Line

3. Process Design-Wastewater treatment

4 Review of the Addendums

Status: O(Open) –IP (In Process) – C (Close) 1/1 Internal Code

You might also like