S/N Project Project status

Infrared based portable heavy water sniffer


1 system Fabrication

2 Heavy water loss monitoring system GA drawings preparation

3 Display unit Fabrication

4 Fuel display unit Design stage


Remarks
-----------

Need one day time to complete all documentation


things
1. Two or more times need to visit vendor place.
2. Two days required to complete all
documentation works.
Note :-
1. 3D model is ready. SME - Subject matter expert
2. Waiting for your permission to start drafting.
3. We have got the quote for Structural analysis
but PO was not released.
4. Waiting for SME/MS sir feedback on thermal
analysis inputs.