You are on page 1of 3

Mechanical Drawing Review

Building Number F3
Floor Level
Unit Name Mostafa Mazen
Unit Number F3-6-2
Unit Gross Area

Plumbing Drawings Review


Serial Item Submittal Status
Date
Plumbing drawing approved with notes 22/12/2020 B

1- All materials shall comply with Arkan specs.

2- All tie in locations to be verified on site.

3- All pluming works should be according to


Egyptian codes and origins of Industry.

4- Site coordination is the contractor responsibility.

5- Clean-out shall be installed at each change in


direction for all drainage systems.

6- Floor level should be considered due to


drainage pipe slope.

7- Minimum size for PPR pipes 25 mm

By Sally Nessiem at 10:37 am, Dec 28, 2020

1|Page
Firefighting Design Review
Serial Item Submittal Status
Date
1 22/12/2020 B
Firefighting drawings approved with notes
1- ALL sprinklers to be quick response type with K-
Factor 5.6.

2- The firefighting inlet connection is Φ 50mm.

3- All areas should be covered with firefighting


system.

4- Pressure test certificate shall be provided before


ceiling closure.

5- All material shall comply with Arkan vendor list

6- Sprinklers Qty. shall be sufficient to main pipe


diameter for main pipe according to NFBA

7- Coverage area per sprinklers shouldn’t exceed


12m square

By Sally Nessiem at 10:37 am, Dec 28, 2020

2|Page
HVAC Drawing Review
Serial Item Submittal Status
Date
1 22/12/2020 C
HVAC drawings not approved drawings to be
resubmitted

1- The chilled water inlet connection is Φ 32 mm with 13.2


GPM.

2- capacities shall be reselected according to unit GPM.

Signatures