100% found this document useful (2 votes)
9K views1 page

C13 Torque

This document provides bolt torque specifications for main components of Caterpillar C13 engines, including: 1) Main bearing bolts which have torque steps of 150±7 Nm for some serial numbers and 50±5 Nm for others, with a final step of +60 degrees. 2) Connecting rod bolts which have a torque of 130±7 Nm with a final step of +60 degrees. 3) Cylinder head bolts which have multiple torque and tightening steps ranging from 55 Nm for minor bolts to 170±10 Nm for master bolts, with final steps of +120±5 degrees.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
9K views1 page

C13 Torque

This document provides bolt torque specifications for main components of Caterpillar C13 engines, including: 1) Main bearing bolts which have torque steps of 150±7 Nm for some serial numbers and 50±5 Nm for others, with a final step of +60 degrees. 2) Connecting rod bolts which have a torque of 130±7 Nm with a final step of +60 degrees. 3) Cylinder head bolts which have multiple torque and tightening steps ranging from 55 Nm for minor bolts to 170±10 Nm for master bolts, with final steps of +120±5 degrees.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
  • CAT C13 Engine Specifications: Provides technical details and specifications for the CAT C13 engine, including bolt torques and part identification.

CAT C13 engine specifications, manuals and bolt torques

Caterpillar C13 Essential Screw Torques

Caution: Bolt torques and other data may vary from serial number to serial number, refer to
manuals.
Main bearing bolts
S / N - JAM1-UP
S / N - KCA1359-UP
S / N - KCB6818-UP
Step 1 = 150 ± 7 Nm, 110 ± 5 lb.ft.
Step 2 = + 60º.
S / N - KCA1-1358
S / N - KCB1-6817
Step 1 = 50 ± 5 Nm, 110 ± 4 lb.ft.
Step 2 = + 60º.
Connecting rod bolts or connecting rod Step 1 = 130 \ ± 7 Nm, 95 \ ± 5 lb.ft
Step 2 = + 60º.

Cylinder head c13 and numbered bolts


Master cylinder head bolts
(Bolt 1 through bolt 26 in a numerical sequence)
Step 1 = 170 Nm, 125 lb.ft
Step 2 = repeat step 1
Step 3 = + 120 °.
Step 4 = loosen everything
Step 5 = 170 ± 10 Nm, 125 ± 7 lb.ft.
Step 6 = repeat step 5
Step 7 = + 120º ± 5º Step 8 = + 120º ± 5º Step 8 = + 120º ± 5º
Minor cylinder head bolts
(Bolt 27 through bolt 34 in a numerical sequence) Step 8 = 55 Nm, 41 lb.ft.

You might also like