You are on page 1of 25

WEEKLY ACCOMPLISHMENT REPORT

FOR WEEK ENDING: Nov. 2 - 7, 2020


CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 2 - 7, 2020
CONTRACT PREVIOUS THIS PERIOD TO DATE
ITEM DESCRIPTION Unit Unit Bid Price
QTY COST QTY COST QTY COST QTY COST
I GENERAL REQUIREMENTS
Testing & Commissioning(Inc.Structure Testing) Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Testing and Commissioning
Structure Testing
Mobilization/Demobilization Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Temporary Facilities Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Temporary Utilities Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Workers' Accommodation Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Design Fee w/ sign & seal Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Documentation Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Safety Requirements Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Miscellaneous Field Expenses Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Permits Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Bonds & Insurances (Advance Payment Bond,
Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Performance Bond, Installation All Risk Insurance)
II CIVIL WORKS 0
Primary laifier Cover Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Treatment Facility Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Anaeration Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Disinfection Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Chemical area Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excavation for Piping Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Parking Lot #REF! 1 #REF! #REF! #REF! 0 #REF!

III MECHANICAL WORKS

Removal of Old Clarifier & Installation of New Scraper Lot #REF! 1 #REF! #REF! #REF! 0 #REF!

Circulation Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!


Return Sludge Distribution Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
NaCLO Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Coagulant Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Polyelectrolyte Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sand Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sewage Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Primary Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Return Sludge Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Concentrated Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
NaClO Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Coagiulant Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Polyelectrolyte Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Deodorizer Spray Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Oil Separaion Air Lift Pump Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Circulation Air Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Deodrizer Fan Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Coarse Screen Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Mechanical Fine Screen Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Oil Collector Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
V-6 Mixer Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Secondary Clarifier Scraper Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Dehydrator Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Conveyor Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Filter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Deodorizer Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
T-2 Tank Agitator Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Diffuser PCS #REF! 220 #REF! #REF! #REF! 0 #REF!

IV ELECTRICAL/INSTRUMENT WORKS
SCADA Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Blower Room Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
SLUDGE Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Chemical Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Deodorizer Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-01 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-4 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-10 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-11 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-12 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-13 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Z-21 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Grit Chamber Solenoid Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Oil Separation Solenoid Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excess Sludge Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sewage Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excess Sludge Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Aeration Tank Air Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Effluent Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Z-21 Spray Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
DO,pH,TSS,CL Lot #REF! 1 #REF! #REF! #REF! 0 #REF!

V PIPING WORKS
ABS size
25 m #REF! 190 #REF! #REF! #REF! 0 #REF!
40 m #REF! 90 #REF! #REF! #REF! 0 #REF!
50 m #REF! 18 #REF! #REF! #REF! 0 #REF!
80 m #REF! 130 #REF! #REF! #REF! 0 #REF!
Pipe 100 m #REF! 44 #REF! #REF! #REF! 0 #REF!
150 m #REF! 120 #REF! #REF! #REF! 0 #REF!
Pipe
ITEM DESCRIPTION Unit Unit Bid Price
QTY COST QTY COST QTY COST QTY COST
200 m #REF! 20 #REF! #REF! #REF! 0 #REF!
250 m #REF! 77 #REF! #REF! #REF! 0 #REF!
300 m #REF! 143 #REF! #REF! #REF! 0 #REF!
40 PCS #REF! 114 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Tee
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
300 15 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
250 15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Reducing Tee
100 40 PCS #REF! 22 #REF! #REF! #REF! 0 #REF!
80 40 PCS #REF! 14 #REF! #REF! #REF! 0 #REF!
200 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
150 100 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Reducer
150 80 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
40 25 PCS #REF! 230 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
25 PCS #REF! 160 #REF! #REF! #REF! 0 #REF!
elbow 50 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 7 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 17 #REF! #REF! #REF! 0 #REF!
50 PCS #REF! 9 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 21 #REF! #REF! #REF! 0 #REF!
150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Flange
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 12 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 16 #REF! #REF! #REF! 0 #REF!
100 PCS #REF! 16 #REF! #REF! #REF! 0 #REF!
Blind Flange
80 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
50 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Ball valve
250 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Check Valve
300 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
valve socket
25 PCS #REF! 240 #REF! #REF! #REF! 0 #REF!
SUS304 size
80 m #REF! 60 #REF! #REF! #REF! 0 #REF!
150 m #REF! 75 #REF! #REF! #REF! 0 #REF!
Pipe(m)
200 m #REF! 33 #REF! #REF! #REF! 0 #REF!
300 m #REF! 33 #REF! #REF! #REF! 0 #REF!
Tee 300 m #REF! 2 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 9 #REF! #REF! #REF! 0 #REF!
elbow
150 PCS #REF! 18 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
flange 150 PCS #REF! 44 #REF! #REF! #REF! 0 #REF!
200 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
Reducer 300 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Reducing Tee 300 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
Butterfly valve 150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!

GRAND TOTAL #REF! #REF! #REF!


Client: Manila Water Philippine Ventures
Project: CBP STP Rehabilitation
Ref. No.: RFQN 2020-0806
Date: Oct3'20
COST BREAKDOWN 3,373,782.40
ITEM DESCRIPTION Qty Unit Unit Cost AMOUNT VAT Total
I GENERAL REQUIREMENTS
Testing & Commissioning(Inc.Structure Testing) 1 Lot 2,581,000 2,581,000.00 309,720.00 2,890,720.00

Mobilization/Demobilization 4,120,480.00
Mobilization/Demobilization 1 Lot 841,000 841,000.00 100,920.00 941,920.00
Temporary Facilities 1 Lot 568,000 568,000.00 68,160.00 636,160.00
Temporary Utilities 1 Lot 378,000 378,000.00 45,360.00 423,360.00
Workers' Accommodation 1 Lot 1,892,000 1,892,000.00 227,040.00 2,119,040.00

Cleaning Sludge Drying Bed 0.351 20 1,445,782.46


Cleaning Sludge Digestor(Use Desinfection Tank) 0.088 5 361,445.61
Demolish Primary Clarifier Scraper 0.263 15 1,084,336.84
Demolish Secondary Clarifir Scraper 0.263 15 1,084,336.84
Project Close-out 0.035 2 144,578.25

Design Fee w/ sign & seal 1 Lot 3,012,306 3,012,305.71 361,476.69 3,373,782.40

Documentation 1 Lot 210,000 210,000.00 25,200.00 235,200.00


Safety Requirements 1 Lot 526,000 526,000.00 63,120.00 589,120.00
Miscellaneous Field Expenses 1 Lot 736,000 736,000.00 88,320.00 824,320.00
Permits 1 Lot 3,027,000 3,027,000.00 363,240.00 3,390,240.00
Bonds & Insurances (Advance Payment Bond,
1 Lot 1,107,000 1,107,000.00 132,840.00 1,239,840.00
Performance Bond, Installation All Risk Insurance)

Foreign 0.241 111 695,490.85


Philippine 0.13 60 375,941.00
Electrical 0.195 90 563,911.50
Control Panel 0.217 100 626,568.33
Scada 0.217 100 626,568.33

107,336,297.60
II CIVIL WORKS 27,216,000.00

III MECHANICAL WORKS 47,972,848.00

IV ELECTRICAL/INSTRUMENT WORKS 9,890,720.00

V PIPING WORKS 22,256,729.60

Total 110,714,285.71 13,285,714.29 124,000,000.00

DISCOUNT

GRAND TOTAL 124,000,000.00


PURPOSE #REF! Period Covered: Nov. 2 - 7, 2020
CONTRACT PREVIOUS THIS PERIOD TO DATE
ITEM DESCRIPTION Unit Unit Bid Price
QTY COST QTY COST QTY COST QTY COST
I GENERAL REQUIREMENTS
Testing & Commissioning(Inc.Structure Testing) 0
Test
Sequence Lot 112,000.00 1 112,000.00
Mechanical Run Lot 89,600.00 1 89,600.00
Commisioning Lot 2,073,120.00 1 2,073,120.00
Concrete Structure Investigation Lot 616,000.00 1 616,000.00
Mobilization/Demobilization 0
Mobilization
Cleaning Sludge drying bed Lot 120,000.00 1 120,000.00
Cleaning Sludge digester Lot 120,000.00 1 120,000.00
Demolish Primary Clarifier Lot 350,960.00 1 350,960.00
Demolish Secondary Clarifier Lot 350,960.00 1 350,960.00
Basic Design Lot 1,547,057.17 1 1,547,057.17
Detailed Design
Structural Lot 537,272.13 1 537,272.13
Electrical Lot 537,272.13 1 537,272.13
Mechanical Lot 250,726.99 1 250,726.99
Piping Lot 501,453.98 1 501,453.98
Temporary Facilities Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Temporary Utilities Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Workers' Accommodation Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Documentation Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Safety Requirements Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Miscellaneous Field Expenses Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Permits Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Bonds & Insurances (Advance Payment Bond,
Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Performance Bond, Installation All Risk Insurance)
II PROCUREMENT 0
Primary laifier Cover Lot - 1 0
Primary laifier Cover Lot - 1 0
II CIVIL WORKS 0
Primary laifier Cover Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Treatment Facility Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Anaeration Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Disinfection Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Chemical area Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excavation for Piping Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Parking Lot #REF! 1 #REF! #REF! #REF! 0 #REF!

III MECHANICAL WORKS

Removal of Old Clarifier & Installation of New Scraper Lot #REF! 1 #REF! #REF! #REF! 0 #REF!

Circulation Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!


Return Sludge Distribution Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
NaCLO Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Coagulant Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Polyelectrolyte Tank Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sand Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sewage Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Primary Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Return Sludge Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Concentrated Sludge Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
NaClO Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Coagiulant Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Polyelectrolyte Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Deodorizer Spray Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Oil Separaion Air Lift Pump Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Circulation Air Lift Pump Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Deodrizer Fan Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Coarse Screen Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Mechanical Fine Screen Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Oil Collector Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
V-6 Mixer Lot #REF! 2 #REF! #REF! #REF! 0 #REF!
Secondary Clarifier Scraper Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Dehydrator Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Conveyor Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Filter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Deodorizer Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
T-2 Tank Agitator Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Diffuser PCS #REF! 220 #REF! #REF! #REF! 0 #REF!

IV ELECTRICAL/INSTRUMENT WORKS
SCADA Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Blower Room Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
SLUDGE Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Chemical Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Deodorizer Control Panel Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-01 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-4 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-10 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-11 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-12 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
V-13 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Z-21 LS Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Grit Chamber Solenoid Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Oil Separation Solenoid Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excess Sludge Valve Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sewage Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Excess Sludge Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Aeration Tank Air Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Effluent Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Sludge Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
Z-21 Spray Flow Meter Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
DO,pH,TSS,CL Lot #REF! 1 #REF! #REF! #REF! 0 #REF!
ITEM DESCRIPTION Unit Unit Bid Price
QTY COST QTY COST QTY COST QTY COST

V PIPING WORKS
ABS size
25 m #REF! 190 #REF! #REF! #REF! 0 #REF!
40 m #REF! 90 #REF! #REF! #REF! 0 #REF!
50 m #REF! 18 #REF! #REF! #REF! 0 #REF!
80 m #REF! 130 #REF! #REF! #REF! 0 #REF!
Pipe 100 m #REF! 44 #REF! #REF! #REF! 0 #REF!
150 m #REF! 120 #REF! #REF! #REF! 0 #REF!
200 m #REF! 20 #REF! #REF! #REF! 0 #REF!
250 m #REF! 77 #REF! #REF! #REF! 0 #REF!
300 m #REF! 143 #REF! #REF! #REF! 0 #REF!
40 PCS #REF! 114 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Tee
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
300 15 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
250 15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Reducing Tee
100 40 PCS #REF! 22 #REF! #REF! #REF! 0 #REF!
80 40 PCS #REF! 14 #REF! #REF! #REF! 0 #REF!
200 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
150 100 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Reducer
150 80 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
40 25 PCS #REF! 230 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
25 PCS #REF! 160 #REF! #REF! #REF! 0 #REF!
elbow 50 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 7 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 17 #REF! #REF! #REF! 0 #REF!
50 PCS #REF! 9 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 21 #REF! #REF! #REF! 0 #REF!
150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
Flange
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 12 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 16 #REF! #REF! #REF! 0 #REF!
100 PCS #REF! 16 #REF! #REF! #REF! 0 #REF!
Blind Flange
80 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
50 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Ball valve
250 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
300 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
250 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Check Valve
300 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
15 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
valve socket
25 PCS #REF! 240 #REF! #REF! #REF! 0 #REF!
SUS304 size
80 m #REF! 60 #REF! #REF! #REF! 0 #REF!
150 m #REF! 75 #REF! #REF! #REF! 0 #REF!
Pipe(m)
200 m #REF! 33 #REF! #REF! #REF! 0 #REF!
300 m #REF! 33 #REF! #REF! #REF! 0 #REF!
Tee 300 m #REF! 2 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 9 #REF! #REF! #REF! 0 #REF!
elbow
150 PCS #REF! 18 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
flange 150 PCS #REF! 44 #REF! #REF! #REF! 0 #REF!
200 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
Reducer 300 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
Reducing Tee 300 150 PCS #REF! 3 #REF! #REF! #REF! 0 #REF!
80 PCS #REF! 6 #REF! #REF! #REF! 0 #REF!
Butterfly valve 150 PCS #REF! 5 #REF! #REF! #REF! 0 #REF!
200 PCS #REF! 2 #REF! #REF! #REF! 0 #REF!

GRAND TOTAL #REF! #REF! #REF!


WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Nov. 1 - 7, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 1 - 7, 2020

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 - 0.00% 104,000.00 0.08% 104,000.00 0.08% 123,896,000.00 99.92%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design - 0.00% 104,000.00 0.08% 104,000.00 0.08% 3,663,680.00 2.95%
2.1 Basic Design - 0.00% 104,000.00 0.08% 104,000.00 0.08% 1,623,680.00 1.31%
2.1.1 Process Lot 1,727,680.00 1 0.00 - 0.00% 0.00 104,000.00 0.08% 0.00 104,000.00 0.08% 1.00 1,623,680.00 1.31%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works - 0.00% - 0.00% - 0.00% 43,469,856.00 35.06%
6.1 Mobilization - 0.00% - 0.00% - 0.00% 2,110,360.00 1.70%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL - 0.00% 104,000.00 0.08% 104,000.00 0.08% 123,896,000.00 99.92%


WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Nov. 8 - 14, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 8 - 14, 2020

ACCOMPLISHMENT
ITEM BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 104,000.00 0.08% 145,000.00 0.12% 249,000.00 0.20% 123,751,000.00 99.80%
1 NTP 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 104,000.00 0.08% 145,000.00 0.12% 249,000.00 0.20% 3,518,680.00 2.84%
2.1 Basic Design 104,000.00 0.08% 145,000.00 0.12% 249,000.00 0.20% 1,478,680.00 1.19%
2.1.1 Process 0.00 104,000.00 0.08% 0.00 145,000.00 0.12% 0.00 249,000.00 0.20% 1.00 1,478,680.00 1.19%
2.1.2 Aprroval by ESTATE WATER 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works - 0.00% - 0.00% - 0.00% 43,469,856.00 35.06%
6.1 Mobilization - 0.00% - 0.00% - 0.00% 2,110,360.00 1.70%
6.1.1 Cleaning Sludge Drying Bed 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
6.1.4 Demolish Secondary Clarifir Scraper 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 104,000.00 0.08% 145,000.00 0.12% 249,000.00 0.20% 123,751,000.00 99.80%
WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Nov. 15 - 21, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 15 - 21, 2020

ACCOMPLISHMENT
ITEM BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 249,000.00 0.20% 145,000.00 0.12% 394,000.00 0.32% 123,606,000.00 99.68%
1 NTP 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 249,000.00 0.20% 145,000.00 0.12% 394,000.00 0.32% 3,373,680.00 2.72%
2.1 Basic Design 249,000.00 0.20% 145,000.00 0.12% 394,000.00 0.32% 1,333,680.00 1.08%
2.1.1 Process 0.00 249,000.00 0.20% 0.00 145,000.00 0.12% 0.00 394,000.00 0.32% 1.00 1,333,680.00 1.08%
2.1.2 Aprroval by ESTATE WATER 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works - 0.00% - 0.00% - 0.00% 43,469,856.00 35.06%
6.1 Mobilization - 0.00% - 0.00% - 0.00% 2,110,360.00 1.70%
6.1.1 Cleaning Sludge Drying Bed 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
6.1.4 Demolish Secondary Clarifir Scraper 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 249,000.00 0.20% 145,000.00 0.12% 394,000.00 0.32% 123,606,000.00 99.68%
WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Nov. 22 - 28, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 22 - 28, 2020

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 394,000.00 0.32% 322,000.00 0.26% 716,000.00 0.58% 123,284,000.00 99.42%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 394,000.00 0.32% 145,000.00 0.12% 539,000.00 0.43% 3,228,680.00 2.60%
2.1 Basic Design 394,000.00 0.32% 145,000.00 0.12% 539,000.00 0.43% 1,188,680.00 0.96%
2.1.1 Process Lot 1,727,680.00 1 0.00 394,000.00 0.32% 0.00 145,000.00 0.12% 0.00 539,000.00 0.43% 1.00 1,188,680.00 0.96%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works - 0.00% 177,000.00 0.14% 177,000.00 0.14% 43,292,856.00 34.91%
6.1 Mobilization - 0.00% 177,000.00 0.14% 177,000.00 0.14% 1,933,360.00 1.56%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 - 0.00% 0.00 42,000.00 0.03% 0.00 42,000.00 0.03% 1.00 208,180.00 0.17%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 135,000.00 0.11% 0.00 135,000.00 0.11% 1.00 670,000.00 0.54%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 394,000.00 0.32% 322,000.00 0.26% 716,000.00 0.58% 123,284,000.00 99.42%
WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Nov. 29 - Dec. 5, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Nov. 29 - Dec. 5, 2020

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 124,000,000.00 100.00% 716,000.00 0.58% 391,000.00 0.32% 1,107,000.00 0.89% 122,893,000.00 99.11%
1 NTP Lot - 1 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 3,767,680.00 3.04% 539,000.00 0.43% 145,000.00 0.12% 684,000.00 0.55% 3,083,680.00 2.49%
2.1 Basic Design 1,727,680.00 1.39% 539,000.00 0.43% 145,000.00 0.12% 684,000.00 0.55% 1,043,680.00 0.84%
2.1.1 Process Lot 1,727,680.00 1 1,727,680.00 1.39% 0.00 539,000.00 0.43% 0.00 145,000.00 0.12% 0.01 684,000.00 0.55% 0.99 1,043,680.00 0.84%
2.1.2 Aprroval by ESTATE WATER Lot - 1 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design 2,040,000.00 1.65% - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 600,000.00 0.48% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 600,000.00 0.48% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 280,000.00 0.23% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 560,000.00 0.45% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 616,000.00 0.50% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 3,390,240.00 2.73% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement 70,683,104.00 57.00% - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines 29,085,704.00 23.46% - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 23,272,204.00 18.77% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 601,500.00 0.49% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 1,612,000.00 1.30% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 3,600,000.00 2.90% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 41,597,400.00 33.55% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 43,469,856.00 35.06% 177,000.00 0.14% 246,000.00 0.20% 423,000.00 0.34% 43,046,856.00 34.72%
6.1 Mobilization 2,110,360.00 1.70% 177,000.00 0.14% 246,000.00 0.20% 423,000.00 0.34% 1,687,360.00 1.36%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 250,180.00 0.20% 0.00 42,000.00 0.03% 0.00 58,000.00 0.05% 0.00 100,000.00 0.08% 1.00 150,180.00 0.12%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 250,180.00 0.20% 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 805,000.00 0.65% 0.00 135,000.00 0.11% 0.00 188,000.00 0.15% 0.00 323,000.00 0.26% 1.00 482,000.00 0.39%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 805,000.00 0.65% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL 124,000,000.00 100.00% 716,000.00 0.58% 391,000.00 0.32% 1,107,000.00 0.89% 122,893,000.00 99.11%
WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Dec. 6 - 12, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Dec. 6 - 12, 2020

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
COST %WT QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 100.00% 1,107,000.00 0.89% 391,000.00 0.32% 1,498,000.00 1.21% 122,502,000.00 98.79%
1 NTP - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 3,767,680.00 3.04% 684,000.00 0.55% 145,000.00 0.12% 829,000.00 0.67% 2,938,680.00 2.37%
2.1 Basic Design 1,727,680.00 1.39% 684,000.00 0.55% 145,000.00 0.12% 829,000.00 0.67% 898,680.00 0.72%
2.1.1 Process 1,727,680.00 1.39% 0.01 684,000.00 0.55% 0.00 145,000.00 0.12% 0.01 829,000.00 0.67% 0.99 898,680.00 0.72%
2.1.2 Aprroval by ESTATE WATER - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design 2,040,000.00 1.65% - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural 600,000.00 0.48% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical 600,000.00 0.48% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical 280,000.00 0.23% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping 560,000.00 0.45% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER - 0.00% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation 616,000.00 0.50% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit 3,390,240.00 2.73% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement 70,683,104.00 57.00% - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines 29,085,704.00 23.46% - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials 23,272,204.00 18.77% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials 601,500.00 0.49% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel 1,612,000.00 1.30% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada 3,600,000.00 2.90% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign 41,597,400.00 33.55% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 43,469,856.00 35.06% 423,000.00 0.34% 246,000.00 0.20% 669,000.00 0.54% 42,800,856.00 34.52%
6.1 Mobilization 2,110,360.00 1.70% 423,000.00 0.34% 246,000.00 0.20% 669,000.00 0.54% 1,441,360.00 1.16%
6.1.1 Cleaning Sludge Drying Bed 250,180.00 0.20% 0.00 100,000.00 0.08% 0.00 58,000.00 0.05% 0.00 158,000.00 0.13% 1.00 92,180.00 0.07%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) 250,180.00 0.20% 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper 805,000.00 0.65% 0.00 323,000.00 0.26% 0.00 188,000.00 0.15% 0.00 511,000.00 0.41% 1.00 294,000.00 0.24%
6.1.4 Demolish Secondary Clarifir Scraper 805,000.00 0.65% 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 124,000,000.00 100.00% 1,107,000.00 0.89% 391,000.00 0.32% 1,498,000.00 1.21% 122,502,000.00 98.79%
WEEKLY ACCOMPLISHMENT REPORT
FOR WEEK ENDING: Dec. 13 - 19, 2020
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Dec. 13 - 19, 2020

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 1,498,000.00 1.21% 391,000.00 0.32% 1,889,000.00 1.52% 122,111,000.00 98.48%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 829,000.00 0.67% 145,000.00 0.12% 974,000.00 0.79% 2,793,680.00 2.25%
2.1 Basic Design 829,000.00 0.67% 145,000.00 0.12% 974,000.00 0.79% 753,680.00 0.61%
2.1.1 Process Lot 1,727,680.00 1 0.01 829,000.00 0.67% 0.00 145,000.00 0.12% 0.01 974,000.00 0.79% 0.99 753,680.00 0.61%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 669,000.00 0.54% 246,000.00 0.20% 915,000.00 0.74% 42,554,856.00 34.32%
6.1 Mobilization 669,000.00 0.54% 246,000.00 0.20% 915,000.00 0.74% 1,195,360.00 0.96%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 158,000.00 0.13% 0.00 58,000.00 0.05% 0.00 216,000.00 0.17% 1.00 34,180.00 0.03%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 250,180.00 0.20%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.00 511,000.00 0.41% 0.00 188,000.00 0.15% 0.01 699,000.00 0.56% 0.99 106,000.00 0.09%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL 1,498,000.00 1.21% 391,000.00 0.32% 1,889,000.00 1.52% 122,111,000.00 98.48%


WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Dec20-26 "021
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Dec20-26 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 1,889,000.00 1.52% 355,180.00 0.29% 2,244,180.00 1.81% 121,755,820.00 98.19%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 974,000.00 0.79% 145,000.00 0.12% 1,119,000.00 0.90% 2,648,680.00 2.14%
2.1 Basic Design 974,000.00 0.79% 145,000.00 0.12% 1,119,000.00 0.90% 608,680.00 0.49%
2.1.1 Process Lot 1,727,680.00 1 0.01 974,000.00 0.79% 0.00 145,000.00 0.12% 0.01 1,119,000.00 0.90% 0.99 608,680.00 0.49%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 915,000.00 0.74% 210,180.00 0.17% 1,125,180.00 0.91% 42,344,676.00 34.15%
6.1 Mobilization 915,000.00 0.74% 210,180.00 0.17% 1,125,180.00 0.91% 985,180.00 0.79%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 216,000.00 0.17% 0.00 34,180.00 0.03% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 - 0.00% 0.00 70,000.00 0.06% 0.00 70,000.00 0.06% 1.00 180,180.00 0.15%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 699,000.00 0.56% 0.00 106,000.00 0.09% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL 1,889,000.00 1.52% 355,180.00 0.29% 2,244,180.00 1.81% 121,755,820.00 98.19%


WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Dec27-Jan2 2021
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Dec27-Jan2 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 2,244,180.00 1.81% 215,000.00 0.17% 2,459,180.00 1.98% 121,540,820.00 98.02%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 1,119,000.00 0.90% 145,000.00 0.12% 1,264,000.00 1.02% 2,503,680.00 2.02%
2.1 Basic Design 1,119,000.00 0.90% 145,000.00 0.12% 1,264,000.00 1.02% 463,680.00 0.37%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,119,000.00 0.90% 0.00 145,000.00 0.12% 0.01 1,264,000.00 1.02% 0.99 463,680.00 0.37%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% - 0.00% - 0.00% 2,040,000.00 1.65%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 600,000.00 0.48%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 280,000.00 0.23%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 1,125,180.00 0.91% 70,000.00 0.06% 1,195,180.00 0.96% 42,274,676.00 34.09%
6.1 Mobilization 1,125,180.00 0.91% 70,000.00 0.06% 1,195,180.00 0.96% 915,180.00 0.74%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 70,000.00 0.06% 0.00 70,000.00 0.06% 0.00 140,000.00 0.11% 1.00 110,180.00 0.09%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL 2,244,180.00 1.81% 215,000.00 0.17% 2,459,180.00 1.98% 121,540,820.00 98.02%


WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan3-9 2021
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan3-9 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 2,459,180.00 1.98% 415,000.00 0.33% 2,874,180.00 2.32% 121,125,820.00 97.68%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 1,264,000.00 1.02% 345,000.00 0.28% 1,609,000.00 1.30% 2,158,680.00 1.74%
2.1 Basic Design 1,264,000.00 1.02% 145,000.00 0.12% 1,409,000.00 1.14% 318,680.00 0.26%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,264,000.00 1.02% 0.00 145,000.00 0.12% 0.01 1,409,000.00 1.14% 0.99 318,680.00 0.26%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design - 0.00% 200,000.00 0.16% 200,000.00 0.16% 1,840,000.00 1.48%
2.2.1 Structural Lot 600,000.00 1 0.00 - 0.00% 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 1.00 500,000.00 0.40%
2.2.2 Electrical Lot 600,000.00 1 0.00 - 0.00% 0.00 50,000.00 0.04% 0.00 50,000.00 0.04% 1.00 550,000.00 0.44%
2.2.3 Mechanical Lot 280,000.00 1 0.00 - 0.00% 0.00 50,000.00 0.04% 0.00 50,000.00 0.04% 1.00 230,000.00 0.19%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 1,195,180.00 0.96% 70,000.00 0.06% 1,265,180.00 1.02% 42,204,676.00 34.04%
6.1 Mobilization 1,195,180.00 0.96% 70,000.00 0.06% 1,265,180.00 1.02% 845,180.00 0.68%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank) Lot 250,180.00 1 0.00 140,000.00 0.11% 0.00 70,000.00 0.06% 0.00 210,000.00 0.17% 1.00 40,180.00 0.03%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%

TOTAL 2,459,180.00 1.98% 415,000.00 0.33% 2,874,180.00 2.32% 121,125,820.00 97.68%


WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan10-16
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan10-16 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 2,874,180.00 2.32% 385,180.00 0.31% 3,259,360.00 2.63% 120,740,640.00 97.37%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 1,609,000.00 1.30% 345,000.00 0.28% 1,954,000.00 1.58% 1,813,680.00 1.46%
2.1 Basic Design 1,409,000.00 1.14% 145,000.00 0.12% 1,554,000.00 1.25% 173,680.00 0.14%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,409,000.00 1.14% 0.00 145,000.00 0.12% 0.01 1,554,000.00 1.25% 0.99 173,680.00 0.14%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design 200,000.00 0.16% 200,000.00 0.16% 400,000.00 0.32% 1,640,000.00 1.32%
2.2.1 Structural Lot 600,000.00 1 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 0.00 200,000.00 0.16% 1.00 400,000.00 0.32%
2.2.2 Electrical Lot 600,000.00 1 0.00 50,000.00 0.04% 0.00 50,000.00 0.04% 0.00 100,000.00 0.08% 1.00 500,000.00 0.40%
2.2.3 Mechanical Lot 280,000.00 1 0.00 50,000.00 0.04% 0.00 50,000.00 0.04% 0.00 100,000.00 0.08% 1.00 180,000.00 0.15%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% - 0.00% - 0.00% 70,683,104.00 57.00%
5.1 Philippines - 0.00% - 0.00% - 0.00% 29,085,704.00 23.46%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,612,000.00 1.30%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
5.2 Foreign Lot 41,597,400.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 41,597,400.00 33.55%
6 Site Works 1,265,180.00 1.02% 40,180.00 0.03% 1,305,360.00 1.05% 42,164,496.00 34.00%
6.1 Mobilization 1,265,180.00 1.02% 40,180.00 0.03% 1,305,360.00 1.05% 805,000.00 0.65%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection Tank Lot 250,180.00 1 0.00 210,000.00 0.17% 0.00 40,180.00 0.03% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
6.2 Civil Works - 0.00% - 0.00% - 0.00% 29,497,396.00 23.79%
6.2.1 Disinfection Tank Lot 5,100,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 5,100,000.00 4.11%
6.2.2 Sludge Treatment Facility Tanks Lot 7,731,396.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 7,731,396.00 6.23%
6.2.3 Cover of Primary Clarifier Lot 5,000,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 5,000,000.00 4.03%
6.2.4 Aeration Tank Rehabilitation(Partation and Slab) Lot 4,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 4,600,000.00 3.71%
6.2.5 Chemical Area Lot 700,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 700,000.00 0.56%
6.2.6 Excavation for Piping Lot 2,522,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 2,522,000.00 2.03%
6.2.7 Parking Lot 3,844,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,844,000.00 3.10%
6.3 Mechanical Works Installation - 0.00% - 0.00% - 0.00% 4,823,000.00 3.89%
6.3.1 SBR Supply Pump Lot 60,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 60,000.00 0.05%
6.3.2 SBR Effluent Pump Lot 60,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 60,000.00 0.05%
6.3.3 Secondary Clarifier Scraper Lot 1,683,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,683,000.00 1.36%
6.3.4 BNR Treatment Facilities Lot 1,140,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,140,000.00
6.3.5 Sludge Dehydrator Facility Lot 1,450,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 1,450,000.00 1.17%
6.3.6 Deodorizer Lot 390,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 390,000.00 0.31%
6.3.7 Chemical Facility Lot 40,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 40,000.00 0.03%
6.4 Piping - 0.00% - 0.00% - 0.00% 6,160,000.00 4.97%
6.4.1 Lift Pump to Sludge Drying Bed(SBR EQ Tank) Lot 80,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 80,000.00 0.06%
6.4.2 EQ Tank to SBR Lot 80,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 80,000.00 0.06%
6.4.3 SBR to Effluent Lot 20,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 20,000.00 0.02%
6.4.4 BNR Treatment Facilities Lot 3,600,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,600,000.00 2.90%
6.4.5 Sludge Treatment Facility Lot 2,300,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 2,300,000.00 1.85%
6.4.6 Deodorizer Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
6.4.6 Chemical Facility Lot 80,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 80,000.00 0.06%
6.5 Electrical Works - 0.00% - 0.00% - 0.00% 677,500.00 0.55%
6.5.1 Main Lot 104,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 104,000.00 0.08%
6.5.1 Sludge Dehydrator Facility Lot 172,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 172,000.00 0.14%
6.5.2 Deodorizer Lot 58,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 58,000.00 0.05%
6.5.3 Chemical Facility Lot 14,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 14,500.00 0.01%
6.5.4 Control Panel and wiring Lot 229,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 229,000.00 0.18%
6.5.5 SCADA System Installation Lot 100,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 100,000.00 0.08%
6.6 Test - 0.00% - 0.00% - 0.00% 201,600.00 0.16%
6.6.1 Sequence Lot 112,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 112,000.00 0.09%
6.6.2 Mechanical Run Lot 89,600.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 89,600.00 0.07%
7 Operation - 0.00% - 0.00% - 0.00% 2,073,120.00 1.67%
7.1 CAS(3000m3/d) Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
7.2 SBR(3000m3/d) Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
7.3 Commissioning Lot 2,073,120.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 2,073,120.00 1.67%
7.4 Guarantee Run Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
7.5 Process Proving Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
8 Project Closeout Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%

TOTAL 2,874,180.00 2.32% 385,180.00 0.31% 3,259,360.00 2.63% 120,740,640.00 97.37%


WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan17-22
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan17-22 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 3,259,360.00 2.63% 3,850,000.00 3.10% 7,109,360.00 5.73% 116,890,640.00 94.27%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 1,954,000.00 1.58% 450,000.00 0.36% 2,404,000.00 1.94% 1,363,680.00 1.10%
2.1 Basic Design 1,554,000.00 1.25% 100,000.00 0.08% ### 1.33% 73,680.00 0.06%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,554,000.00 1.25% 0.00 100,000.00 0.08% 0.01 1,654,000.00 1.33% 0.99 73,680.00 0.06%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design 400,000.00 0.32% 350,000.00 0.28% 750,000.00 0.60% 1,290,000.00 1.04%
2.2.1 Structural Lot 600,000.00 1 0.00 200,000.00 0.16% 0.00 150,000.00 0.12% 0.00 350,000.00 0.28% 1.00 250,000.00 0.20%
2.2.2 Electrical Lot 600,000.00 1 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 0.00 200,000.00 0.16% 1.00 400,000.00 0.32%
2.2.3 Mechanical Lot 280,000.00 1 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 0.00 200,000.00 0.16% 1.00 80,000.00 0.06%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 1.00 560,000.00 0.45%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement - 0.00% 3,400,000.00 2.74% 3,400,000.00 2.74% 67,283,104.00 54.26%
5.1 Philippines - 0.00% 400,000.00 0.32% 400,000.00 0.32% 28,685,704.00 23.13%
5.1.1 Piping Materials Lot ### 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 - 0.00% 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 1.00 1,512,000.00 1.22%
5.1.4 Scada Lot 3,600,000.00 1 0.00 - 0.00% 0.00 300,000.00 0.24% 0.00 300,000.00 0.24% 1.00 3,300,000.00 2.66%
5.2 Foreign Lot ### 1 0.00 - 0.00% 0.02 3,000,000.00 2.42% 0.02 3,000,000.00 2.42% 0.98 38,597,400.00 31.13%
6 Site Works 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 42,164,496.00 34.00%
6.1 Mobilization 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 805,000.00 0.65%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection T Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 3,259,360.00 2.63% 3,850,000.00 3.10% 7,109,360.00 5.73% 116,890,640.00 94.27%
WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan23-29
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan23-29 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 7,109,360.00 5.73% 2,713,680.00 2.19% 9,823,040.00 7.92% 114,176,960.00 92.08%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 2,404,000.00 1.94% 813,680.00 0.66% 3,217,680.00 2.59% 4,556,240.00 3.67%
2.1 Basic Design 1,654,000.00 1.33% 73,680.00 0.06% ### 1.39% - 0.00%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,654,000.00 1.33% 0.00 73,680.00 0.06% 0.01 1,727,680.00 1.39% 0.99 - 0.00%
2.1.2 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2.2 Detail Design 750,000.00 0.60% 740,000.00 0.60% ### 1.20% 4,556,240.00 3.67%
2.2.1 Structural Lot 600,000.00 1 0.00 350,000.00 0.28% 0.00 100,000.00 0.08% 0.00 450,000.00 0.36% 1.00 150,000.00 0.12%
2.2.2 Electrical Lot 600,000.00 1 0.00 200,000.00 0.16% 0.00 250,000.00 0.20% 0.00 450,000.00 0.36% 1.00 150,000.00 0.12%
2.2.3 Mechanical Lot 280,000.00 1 0.00 200,000.00 0.16% 0.00 40,000.00 0.03% 0.00 240,000.00 0.19% 1.00 40,000.00 0.03%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 350,000.00 0.28% 0.00 350,000.00 0.28% 1.00 210,000.00 0.17%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement 3,400,000.00 2.74% 1,900,000.00 1.53% 5,300,000.00 4.27% 65,383,104.00 52.73%
5.1 Philippines 400,000.00 0.32% 400,000.00 0.32% 800,000.00 0.65% 28,285,704.00 22.81%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 0.00 200,000.00 0.16% 1.00 1,412,000.00 1.14%
5.1.4 Scada Lot 3,600,000.00 1 0.00 300,000.00 0.24% 0.00 300,000.00 0.24% 0.00 600,000.00 0.48% 1.00 3,000,000.00 2.42%
5.2 Foreign Lot 41,597,400.00 1 0.02 3,000,000.00 2.42% 0.01 1,500,000.00 1.21% 0.04 4,500,000.00 3.63% 0.96 37,097,400.00 29.92%
6 Site Works 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 42,164,496.00 34.00%
6.1 Mobilization 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 805,000.00 0.65%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection T Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 7,109,360.00 5.73% 2,713,680.00 2.19% 9,823,040.00 7.92% 114,176,960.00 92.08%
WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan30-Feb5'21
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan30-Feb5 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 9,823,040.00 7.92% 1,870,000.00 1.51% 11,343,040.00 9.15% 112,656,960.00 90.85%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 2,867,680.00 2.31% 570,000.00 0.46% 3,437,680.00 2.77% 4,336,240.00 3.50%
2.1 Basic Design 1,727,680.00 1.39% - 0.00% ### 1.39% - 0.00%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,727,680.00 1.39% 0.00 - 0.00% 0.01 1,727,680.00 1.39% 0.99 - 0.00%
2.1.2 Aprroval by ESTATE WATER Lot - 1 - - - 0.00%
2.2 Detail Design 1,140,000.00 0.92% 570,000.00 0.46% ### 1.38% 4,336,240.00 3.50%
2.2.1 Structural Lot 600,000.00 1 0.00 450,000.00 0.36% 0.00 100,000.00 0.08% 0.00 550,000.00 0.44% 1.00 50,000.00 0.04%
2.2.2 Electrical Lot 600,000.00 1 0.00 450,000.00 0.36% 0.00 100,000.00 0.08% 0.00 550,000.00 0.44% 1.00 50,000.00 0.04%
2.2.3 Mechanical Lot 280,000.00 1 0.00 240,000.00 0.19% 0.00 20,000.00 0.02% 0.00 260,000.00 0.21% 1.00 20,000.00 0.02%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 350,000.00 0.28% 0.00 350,000.00 0.28% 1.00 210,000.00 0.17%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement 5,300,000.00 4.27% 1,300,000.00 1.05% 6,600,000.00 5.32% 64,083,104.00 51.68%
5.1 Philippines 800,000.00 0.65% 300,000.00 0.24% 1,100,000.00 0.89% 27,985,704.00 22.57%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 200,000.00 0.16% 0.00 100,000.00 0.08% 0.00 300,000.00 0.24% 1.00 1,312,000.00 1.06%
5.1.4 Scada Lot 3,600,000.00 1 0.00 600,000.00 0.48% 0.00 200,000.00 0.16% 0.01 800,000.00 0.65% 0.99 2,800,000.00 2.26%
5.2 Foreign Lot 41,597,400.00 1 0.04 4,500,000.00 3.63% 0.01 1,000,000.00 0.81% 0.04 5,500,000.00 4.44% 0.96 36,097,400.00 29.11%
6 Site Works 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 42,164,496.00 34.00%
6.1 Mobilization 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 805,000.00 0.65%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection T Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 9,473,040.00 7.64% 1,870,000.00 1.51% 11,343,040.00 9.15% 112,656,960.00 90.85%
WEEKLY ACCOMPLISHMENT REPORT
For Week Ending : Jan30-Feb5'21
CONTRACT NO. Contract Duration (Including Documentation): 269 Days
DESCRIPTION Contract NTP/Start Date: 02 Nov '20
CONTRACTOR Contract Expiry Date: 11 Nov '21
PURPOSE Period Covered: Jan30-Feb5 2021

ACCOMPLISHMENT
ITEM CONTRACT BALANCE
ITEM DESCRIPTION PREVIOUS THIS PERIOD TO DATE
NO.
Unit Unit Bid Price QTY QTY COST %WT QTY COST %WT QTY COST %WT QTY COST %WT
0 CBP STP Rehabilitation 124,000,000.00 11,343,040.00 9.15% 2,620,000.00 2.11% 13,613,040.00 10.98% 110,386,960.00 89.02%
1 NTP Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
2 Design 3,087,680.00 2.49% - 0.00% 3,207,680.00 2.59% 4,566,240.00 3.68%
2.1 Basic Design 1,727,680.00 1.39% - 0.00% ### 1.39% - 0.00%
2.1.1 Process Lot 1,727,680.00 1 0.01 1,727,680.00 1.39% 0.00 - 0.00% 0.01 1,727,680.00 1.39% 0.99 - 0.00%
2.1.2 Aprroval by ESTATE WATER Lot - 1 - - - 0.00%
2.2 Detail Design 1,360,000.00 1.10% 120,000.00 0.10% ### 1.19% 4,566,240.00 3.68%
2.2.1 Structural Lot 600,000.00 1 0.00 550,000.00 0.44% 0.00 - 0.00% 0.00 550,000.00 0.44% 1.00 50,000.00 0.04%
2.2.2 Electrical Lot 600,000.00 1 0.00 550,000.00 0.44% 0.00 - 0.00% 0.00 550,000.00 0.44% 1.00 50,000.00 0.04%
2.2.3 Mechanical Lot 280,000.00 1 0.00 260,000.00 0.21% 0.00 20,000.00 0.02% 0.00 280,000.00 0.23% 1.00 - 0.00%
2.2.4 Piping Lot 560,000.00 1 0.00 - 0.00% 0.00 100,000.00 0.08% 0.00 100,000.00 0.08% 1.00 460,000.00 0.37%
2.2.5 Aprroval by ESTATE WATER Lot - 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 - 0.00%
3 Concrete Structural Investgation Lot 616,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 616,000.00 0.50%
4 Permit Lot 3,390,240.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 3,390,240.00 2.73%
5 Procurement 6,600,000.00 5.32% 2,500,000.00 2.02% 9,100,000.00 7.34% 61,583,104.00 49.66%
5.1 Philippines 1,100,000.00 0.89% 500,000.00 0.40% 1,600,000.00 1.29% 27,485,704.00 22.17%
5.1.1 Piping Materials Lot 23,272,204.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 23,272,204.00 18.77%
5.1.2 Electrical Materials Lot 601,500.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 601,500.00 0.49%
5.1.3 Control Panel Lot 1,612,000.00 1 0.00 300,000.00 0.24% 0.00 200,000.00 0.16% 0.00 500,000.00 0.40% 1.00 1,112,000.00 0.90%
5.1.4 Scada Lot 3,600,000.00 1 0.01 800,000.00 0.65% 0.00 300,000.00 0.24% 0.01 1,100,000.00 0.89% 0.99 2,500,000.00 2.02%
5.2 Foreign Lot 41,597,400.00 1 0.04 5,500,000.00 4.44% 0.02 2,000,000.00 1.61% 0.06 7,500,000.00 6.05% 0.94 34,097,400.00 27.50%
6 Site Works 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 42,164,496.00 34.00%
6.1 Mobilization 1,305,360.00 1.05% - 0.00% 1,305,360.00 1.05% 805,000.00 0.65%
6.1.1 Cleaning Sludge Drying Bed Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.2 Cleaning Sludge Digestor(Use Desinfection T Lot 250,180.00 1 0.00 250,180.00 0.20% 0.00 - 0.00% 0.00 250,180.00 0.20% 1.00 - 0.00%
6.1.3 Demolish Primary Clarifier Scraper Lot 805,000.00 1 0.01 805,000.00 0.65% 0.00 - 0.00% 0.01 805,000.00 0.65% 0.99 - 0.00%
6.1.4 Demolish Secondary Clarifir Scraper Lot 805,000.00 1 0.00 - 0.00% 0.00 0.00% 0.00 - 0.00% 1.00 805,000.00 0.65%
TOTAL 10,993,040.00 8.87% 2,620,000.00 2.11% 13,613,040.00 10.98% 110,386,960.00 89.02%
B R ti ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
G tt w fl w

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
PLAN Nov. '20 Dec. '20 Jan. '21 Feb. '21 Mar. '21 Apr. '21 May '21 Jun. '21 Jul. '21 Aug. '21 Sep. '21 Oct. '21 Nov. '21
Task Name Start Finish Duration W 01 W 02 W 03 W 04 W 05 W 06 W 07 W 08 W 09 W 10 W 11 W 12 W 13 W 14 W 15 W 16 W 17 W 18 W 19 W 20 W 21 W 22 W 23 W 24 W 25 W 26 W 27 W 28 W 29 W 30 W 31 W 32 W 33 W 34 W 35 W 36 W 37 W 38 W 39 W 40 W 41 W 42 W 43 W 44 W 45 W 46 W 47 W 48 W 49 W 50 W 51 W 52 W 53 W 54 W 55 W ###
56
CBP STP Rehabilitation 02 Nov '20 11 Nov '21 269 ### ###
NTP 02 Nov '20 02 Nov '20 1 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Design 03 Nov '20 15 Feb '21 75 ###
Basic Design 03 Nov '20 05 Jan '21 46 ###
Process 03 Nov '20 18 Dec '20 34 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Aprroval by ESTATE WATER 21 Dec '20 05 Jan '21 12 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Detail Design 14 Dec '20 15 Feb '21 46 ###
Structural 14 Dec '20 31 Jan '21 35 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Electrical 15 Dec '20 31 Jan '21 34 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Mechanical 15 Dec '20 31 Jan '21 34 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Piping 15 Dec '20 31 Jan '21 34 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Aprroval by ESTATE WATER 01 Feb '21 15 Feb '21 11 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Concrete Structural Investgation 10 Jan '21 28 Feb '21 35 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Permit 01 Feb '21 02 Mar '21 22 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Procurement 06 Jan '21 24 May '21 99 ###
Philippines 11 Jan '21 24 May '21 96 ###
Piping Materials 11 Jan '21 24 May '21 96 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Electrical Materials 01 Feb '21 30 Apr '21 65 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Control Panel 11 Jan '21 24 May '21 96 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Scada 11 Jan '21 24 May '21 96 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Foreign 06 Jan '21 24 May '21 99 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Site Works 24 Nov '20 20 Jun '21 149 ###
Mobilization 24 Nov '20 29 Apr '21 113 ###
Cleaning Sludge Drying Bed 24 Nov '20 25 Dec '20 24 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Cleaning Sludge Digestor(Use 26 Dec '20 17 Jan '21 15 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
D m m 24 Nov '20 21 Dec '20 20 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Demolish Secondary Clarifir Sc 11 Apr '21 29 Apr '21 14 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Civil Works 03 Mar '21 31 May '21 64 ###
Disinfection Tank 03 Mar '21 16 May '21 53 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Sludge Treatment Facility Tank 03 Mar '21 16 May '21 53 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Cover of Primary Clarifier 03 Mar '21 10 Apr '21 28 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Aeration Tank Rehabilitation(P 11 Apr '21 31 May '21 36 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Chemical Area 19 Apr '21 03 May '21 11 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Excavation for Piping 06 Mar '21 05 Apr '21 21 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Parking 03 May '21 20 Jun '21 35 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
M W 01 Apr '21 10 Jun '21 51 ###
SBR Supply Pump 01 Apr '21 04 Apr '21 2 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
SBR Effluent Pump 01 Apr '21 04 Apr '21 2 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
10 May '21 02 Jun '21 18 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BNR Treatment Facilities 11 Apr '21 10 Jun '21 44 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Sludge Dehydrator Facility 25 May '21 02 Jun '21 7 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Deodorizer 03 May '21 02 Jun '21 23 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Chemical Facility 03 May '21 02 Jun '21 23 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Piping 08 Mar '21 10 Jun '21 69 ###
Lift Pump to Sludge Drying 08 Mar '21 05 Apr '21 21 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
EQ Tank to SBR 08 Mar '21 05 Apr '21 21 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
SBR to Effluent 08 Mar '21 05 Apr '21 21 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
BNR Treatment Facilities 11 Apr '21 10 Jun '21 44 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Sludge Treatment Facility 02 May '21 10 Jun '21 29 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###