You are on page 1of 2

Accurate Engineering Quality

Minutes of Meeting
Subject –Inspection of Assembly Air Oil Separator (R1)
Date:- 03.10.2023 Attended By: Copies to: For Action
Time:- 09.30 PM – 12.45 PM /Information (Other than
Mr. Suyog Abhale (Accurate Engineering –QA)
members of the meeting)
Venue: SPARK Engineering, Mr. Rahul Rajput (Spark Engineering- QA) –
Handewadi road,Hadapsar Pune.

Pt.
Decision /Proposed Action Action by Remark
No.
Following points were inspection

Inspection of Assembly Air Oil Separator


1 Drg. No- 271.04.014.50 Rev- A For Info
Inspection Done - 05 No’s Sr. no. (SEAOS-5554,5555,5556,55575558.)

Overall dimensions verified for AOS tank- 271.04.014.50 Rev- A below are the
2
observations.

 Accepted Point
 Material TC and heat chart Reviewed Found ok.
 Threading and tapping inspection done Found ok.
 Applying Oil for AOS tank, Castrol DWX32, TC Received. Found ok.

 Hold Points SPARK


3 Engineering
 Dimensional inspection done found not ok. Dt.03/10/23
1. Top plate Slot Template req. to check properly.& Template Calibration
report req.
2. Top plate slot all CD shift 0.1 TO 0.8 MM KPCL Please confirm in
cmm. All top plate.
3. Mounting CD req. 150 mm observed 149,148.5,149,148.5,149, mm on
sr. no. SEAOS-5554,5555,5556,55575558.)
 Adaptor ¾” Gauge Req. To inspection.

SPARK
 Hydro test Not Offer to witness only Test certificate review found ok. Engineering
Dt.03/10/23
SPARK
4  Hold – 05 No’s ( SEAOS-.) Engineering
Dt.03/10/23

INSPECTION BY: - Suyog B. Abhale DATE :- 03.10.2023

Sign: -
Accurate Engineering Quality
Minutes of Meeting
Subject –Inspection of Assembly Air Oil Separator
Date:- 03.10.2023 Attended By: Copies to: For Action
Time:- 09.30 PM – 12.45 PM /Information (Other than
Mr. Suyog Abhale (Accurate Engineering –QA)
members of the meeting)
Venue: SPARK Engineering, Mr. Rahul Rajput (Spark Engineering- QA) –
Handewadi road,Hadapsar Pune.

Pt.
Decision /Proposed Action Action by Remark
No.
Following points were inspection

Inspection of Assembly Air Oil Separator


1 Drg. No- 271.01.430.50 Rev- P For Info
Inspection Done -05 No’s Sr.no (SEAOS- 5559,5560,5561,5562,5563.)

Overall dimensions verified for AOS tank- 271.01.430.50 Rev- P below are the
2
observations.

 Accepted points
 Material TC and heat chart Reviewed Found ok
 Threading and tapping inspection done Found ok.
 Spatter observed Rework done. Found ok
SPARK
3  Applying Oil for AOS tank, Castrol DWX32, TC Received. Found ok. Engineering
Dt.03/10/23

 Hold Points :-
 Dimensional inspection done found not ok.
1. Oil Outlet Elbow CD From bottom req. 225 (+/-2) mm Observed 230
mm On Sr.no (SEAOS- 5561.)

SPARK
4  Hydro test Not Offer to witness only Test certificate review found ok. Engineering
Dt.03/10/23

 Accepted – 04 No’s Sr.no (SEAOS- 5559,5560,5562,5563.) SPARK


5 Engineering
 Hold – 01 No’s Sr.no (SEAOS-5561.) Dt.03/10/23

INSPECTION BY: - Suyog B. Abhale DATE:- 03.10.2023

Sign: -