Subject –Inspection of Assembly Air Oil Separator (R1)
Date:- 03.10.2023 Attended By: Copies to: For Action
Time:- 09.30 PM – 12.45 PM /Information (Other than
Mr. Suyog Abhale (Accurate Engineering –QA)
members of the meeting)
Venue: SPARK Engineering, Mr. Rahul Rajput (Spark Engineering- QA) –
Handewadi road,Hadapsar Pune.
Pt.
Decision /Proposed Action Action by Remark
No.
Following points were inspection
Overall dimensions verified for AOS tank- 271.04.014.50 Rev- A below are the
2
observations.
Accepted Point
Material TC and heat chart Reviewed Found ok.
Threading and tapping inspection done Found ok.
Applying Oil for AOS tank, Castrol DWX32, TC Received. Found ok.
SPARK
Hydro test Not Offer to witness only Test certificate review found ok. Engineering
Dt.03/10/23
SPARK
4 Hold – 05 No’s ( SEAOS-.) Engineering
Dt.03/10/23
Sign: -
Accurate Engineering Quality
Minutes of Meeting
Subject –Inspection of Assembly Air Oil Separator
Date:- 03.10.2023 Attended By: Copies to: For Action
Time:- 09.30 PM – 12.45 PM /Information (Other than
Mr. Suyog Abhale (Accurate Engineering –QA)
members of the meeting)
Venue: SPARK Engineering, Mr. Rahul Rajput (Spark Engineering- QA) –
Handewadi road,Hadapsar Pune.
Pt.
Decision /Proposed Action Action by Remark
No.
Following points were inspection
Overall dimensions verified for AOS tank- 271.01.430.50 Rev- P below are the
2
observations.
Accepted points
Material TC and heat chart Reviewed Found ok
Threading and tapping inspection done Found ok.
Spatter observed Rework done. Found ok
SPARK
3 Applying Oil for AOS tank, Castrol DWX32, TC Received. Found ok. Engineering
Dt.03/10/23
Hold Points :-
Dimensional inspection done found not ok.
1. Oil Outlet Elbow CD From bottom req. 225 (+/-2) mm Observed 230
mm On Sr.no (SEAOS- 5561.)
SPARK
4 Hydro test Not Offer to witness only Test certificate review found ok. Engineering
Dt.03/10/23