6.1,3()1,-)./0)*1/(2.3F21IA+)..2.3+4/5
6.1,3()1,-)./0)*1/(2.3F21IA(4*/(,7,.1).5-+4/5
A(4*,::61,7N1(/*1/(,*I).3,:
H().:0,(A(45/*124.H().:)*124.:144:12.3
601I2:2:1I,02.)+,P)72.E4/(*,(1202*)124.8)1IRE4/)(,(,L/2(,514*478+,1,1I,04++4F2.3:1,8:G
S2:21*,(1202*)124.G4()*+,G*47).5:,+,*1E4/(*,(1202*)124.8)1I14,.:/(,E4/)(,)F)(,40)++*,(1202*)124.
(,L/2(,7,.1:G
U41,1I)1*478+,124.401I,(,L/2(,51()2.2.3).5)88(4K)+401I,*4/(:,:/C72::24.04(7)(,)+:4(,L/2(,5
2.8)1I:1I)1(,L/2(,1()2.2.3G
I,*D*,(1K2,FG4()*+,G*4714*4.02(71I)1)++*478+,1,5*4784.,.1:)(,2.E4/(8(402+,G
60,P)7:1I)1E4/I)K,1)D,.54.41:I4F/8RE4/7)EI)K,1)D,.1I,7/.5,()5200,(,.1()*+,H,:12.3
6MG
4.1)*1FFFG8,)(:4.K/,G*47;4()*+,;*4.1)*1147,(3,E4/(6M:V8(4K25,)++6M:/.5,(FI2*IE4/I)K,
1)D,.,P)7:4(:/C7211,504(7:).5*4.02(7FI2*I6M:I4/+5C,1I,W:/(K2K2.325WXG
2 = 64Y426475@ 7 235Y7 326475
H4(,K2,F,(1202*)124.(,L/2(,7,.1:).502.54/1)C4/1()*+,Z.2K,(:21EW:(,*477,.5,51()2.2.3148(,8)(,04(,(1202*)124.9P)7:RK2:21
I118[;;FFFG4()*+,G*47;,5/*)124.;*,(1202*)124.
H4K2,FE4/(9P)7).5,(1202*)124.I2:14(ER).5K,(20EE4/(,(1202*)124.141I2(58)(12,:RK2:21I118[;;*,(1K2,FG4()*+,G*47
H4K2,F1I,()*+,,(1202*)124.A(43()7C+43RK2:21I118[;;C+43:G4()*+,G*47
Oracle
1Z0-348
Oracle Manufacturing Cloud 2017 Implementation Essentials
QUESTION & ANSWERS
Oracle 1z0-348 : Braindumps Questions
Question No : 1
A production Supervisor has noticed that Work Orders created manually are overwritten by
the plan runs executed by Planning Central. After discussing this issue with the Planner,
two actions are recommended to prevent the Work Orders from being overwritten by plan
runs.
Answer: A,D
Question No : 2
Your customer has completed the required setup steps for automatic work definition.
Identify the option that shows the navigation steps needed to create an automatic work
definition.
A. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic
work definition
B. Product Management> Product Information Management> Items> Edit Item > Actions>
Create automatic work definition
C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard
operation> Actions> Create automatic work definition
D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic
definition
Answer: B
Question No : 3
A production operator needs to review the materials issued, resources charged, and
operations performed for a job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for
2
Oracle 1z0-348 : Braindumps Questions
both Work Order and Orderless execution.
Answer: D
Question No : 4
A. The work order operations do not have operations start or completion date.
B. The scheduled resources are not part of the organization selected by the user.
C. None of the operations include scheduled resources.
D. The operations are missing sequence.
Answer: BC
Question No : 5
Identify the two capabilities that the Application Development Framework Desktop
Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.
A. You can mass create and update work definitions and their operations, items, and
resources.
B. You can mass create and update work definitions and their operations, items only and
cannot add resources in work definitions.
C. You can mass create and update work definitions and their operations only and cannot
add items and resources in work definitions.
D. You can copy work definitions form one organization to another organization.
Answer: A,D
3
Oracle 1z0-348 : Braindumps Questions
Question No : 6
A. Rescheduling
B. Repair
C. Rework
D. Prototype
Answer: B,C,D
Question No : 7
A. The Production Supervisor need not include cost variances while costing last month’s
work orders because those can be applied directly in subledger accounting.
B. The Production Supervisor needs to include all costs and variances in last month’s work
orders and close them; however, the work orders where updates are expected, should not
be closed.
C. The Production Supervisor should make sure that all costs are included while closing
last month’s work orders; however, variances can be included after closing the work orders.
D. Work order costs can be updated anytime regardless of the status of the work order.
Answer: B
Question No : 8
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions,
has scheduled the Process Item Structure Changes to Work Definitions program. However,
after the execution of the program the engineer did not receive a notification with the details
of the Item Structure changes.
Answer: D,E
Question No : 9
Your customer has multiple distribution centers and a few manufacturing plants. Plants
make different items with some overlap between them in terms of products manufactured.
The distribution centers stock parts from all plants. A Corporate Engineering team is
responsible for centrally defining items and catalogues. This team defines the items and
sets the attributes for most parameters. The respective distribution centers and
manufacturing plants are allowed to change some attributes locally.
Answer: B,C
Question No : 10
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and
Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work
center WC1. The customer wants to assign all units of resource R2 available for Day and
Night Shift.
5
Oracle 1z0-348 : Braindumps Questions
Identify the correct sequence of steps to achieve this requirement.
A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box>
Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check
box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift
Column
C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check
box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift
Column.
D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check
box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift
Column.
Answer: D
Question No : 11
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders
page. On the Entering Edit Work Order: WO-1025 page, he finds General Information,
Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
Answer: A,B
Question No : 12
To reduce the subassembly stock with no impact on material planning of child components
of the subassemblies stock, you need to modify the multilevel item structure of a product.
6
Oracle 1z0-348 : Braindumps Questions
A. Change the Supply Type = Push in Item definition and Work Definition, for
subassemblies having high inventory stock.
B. Change the Supply Type = Phantom in Item definition and Work Definition, for
subassemblies having high inventory stock.
C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for
subassemblies having high inventory stock.
D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for
subassemblies having high inventory stock.
Answer: B
Question No : 13
You are in the process of defining a Standard Operation for visual inspection. You want the
completion of this standard operation to be reported in all work orders that reference it.
A. Select the Automatically Transact check box while defining the Standard Operation.
B. Deselect the Count Point check box while defining the Standard Operation.
C. Select the Count Point check box while defining the Standard Operation.
D. Ensure that the Charge Type of the resource is Automatic.
Answer: C
Question No : 14
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop
the reports.
Answer: C
7
Oracle 1z0-348 : Braindumps Questions
Question No : 15
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work
Definition for an item that will be manufactured in-house.
A. Operation Items
B. Resources
C. Production Line
D. Operations
E. Manufacturing Lead Time
Answer: A,B,D
Question No : 16
Your customer is a light assembly manufacturing company that doesn’t require shop floor
control. A manufacturing engineer wants to generate a work definition automatically for
some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?
Answer: A,C,E
Question No : 17
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house
manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the
order.
8
Oracle 1z0-348 : Braindumps Questions
A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
B. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
C. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW
D. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
Answer: A,D
Question No : 18
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user
is in the process of defining Work Definition and Operations. However, this user is unable
to assign an ad hoc item, Grease, to an operation.
A. The user doesn’t have Override Item Structure Components in the Work Definition
privileges.
B. An item cannot be assigned on an ad hoc basis.
C. The user doesn’t have access to the PIM module.
D. The user doesn’t have Data access to create item structure.
Answer: A
Question No : 19
You can generate and manage work order exceptions in Oracle Manufacturing Cloud.
Which users can report production exception and who gets notified after an exception is
raised?
A. The Production Operator can report and exception and the application generates a
notification that is sent to all users who have access to the manufacturing plant.
B. The Production Operator can report an exception and the application generates a
notification that is sent to all users with the role of production supervisor who have access
to the manufacturing plant.
C. The Production Operator or Manufacturing Engineer can report an exception and
notifies the production supervisor using Oracle Social Network since there is no system
generated notification.
D. The Production Operator can report an exception and notifies the production supervisor
using Oracle Social Network since there is no system-generated notification.
9
Oracle 1z0-348 : Braindumps Questions
Answer: B
Question No : 20
Your customer has the following business requirement. There are two work definitions
created in the application. One Work Definition for Engine Finished Good and other Work
Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet
Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.
A. Create a Subinventory that could be the completion Subinventory for yielding the pallet
and then the same Subinventory can serve as the supply Subinventory of the pallet in the
Work Definition created for Engine.
B. Assign a higher priority to the Work Definition created for Engine and a lower one for the
Work Definition for Pallet.
C. The two Work Definitions can be tied through Project or Seiban numbers.
D. The Work Definition versions can be used to tie the Work Orders.
Answer:A
Question No : 21
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A
resource LATHE is assigned to the work center W1. There are five units of LATHE
available, of which three units are available for the Morning Shift and the remaining units
are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?
A. Do not select the Available 24 Hours check box and in the Resource Availability region,
enter 3 against the resource LATHE in the Morning Shift column.
B. Select the Available 24 Hours check box and in the Resource Availability region, enter 3
against the resource LATHE in the Morning Shift column.
C. Select the Available 24 Hours check box and in the Resource Availability region, enter 2
against the resource LATHE in the Evening Shift column.
D. Do not select the Available 24 Hours check box and in the Resource Availability region,
enter 2 against the resource LATHE in the Evening Shift column.
E. Do not select the Available 24 Hours check box and in the Resource Availability region,
10
Oracle 1z0-348 : Braindumps Questions
enter 60% against the resource LATHE in the Morning Shift column.
F. Do not select the Available 24 Hours check box and in the Resource Availability region,
enter 40% against the resource LATHE in the Evening Shift column.
Answer: AD
Question No : 22
A user wants to transfer the work order status updates and resource transaction data for
costed resources to Cost Management.
Answer: B
Question No : 23
In a manufacturing plant, the work definition and rate plans of Material, Resource, and
Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost
assumptions and compare the results. When the cost assumptions are finalized, the cost
accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the
assembly to cost accounting in frozen type.
11
Oracle 1z0-348 : Braindumps Questions
F. Transfer Transactions from Inventory to Costing.
Answer: C,E,F
Question No : 24
A Production Operator needs to load Work Order Transactions from an external system
into Manufacturing Cloud.
A. Load Data to Fusion repository> Export File to UCM server > Process Import Operations
Transactions> Load file from UCM to Interface table.
B. Export File to UCM server> Load Data to Fusion repository> Process Import Operations
Transactions> Load file from UCM to Interface table.
C. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to
Interface table >Process Import Operations Transactions.
D. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to
UCM server> Process Import Operations Transactions.
Answer: C
Question No : 25
As a production supervisor, you require immediate access to critical shop floor execution
systems to take action while on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile
application?
A. Executing standard work order and updating item and resource usage
B. Creating a new standard or non standard work order
C. Searching for work orders and sending them through e-mail
D. Releasing work orders using quick swipe details
E. Reviewing operation, component, and resource detail
F. Reviewing customer information of work orders
Answer: C,D,E,F
12
Your customer wants to mass create and modify Work Definitions and the relevant
operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development
Framework Desktop Integration)?
Answer: C,D
Question No : 27
Which entity should you use to configure the manufacturing plant in Functional Manager?
A. Legal Entity
B. Plant
C. Organization
D. Business Unit
Answer: B
Question No : 28
A. Manufacturing Engineer
B. Production Engineer
C. Production Operator
D. Manufacturing Supervisor
E. Production Supervisor
13
Oracle 1z0-348 : Braindumps Questions
Answer: A
Question No : 29
Identify two ways of reporting the progress of work order at work order operation level.
Answer: C,D
Question No : 30
Identify two conditions that should be met at the same time for a Standard Operation to be
called an Optional Operation.
Answer: B,E
Question No : 31
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so
the job order can report the excess production completion?
14
Oracle 1z0-348 : Braindumps Questions
C. Overcompletion Tolerance Type = Percentage, value = 100
D. Overcompletion Tolerance Type = Percentage, value > 0
E. Overcompletion Tolerance Type = Percentage, value = 0
Answer: ACD
Question No : 32
Which two steps should you use to create a new Oracle Transactional Business
Intelligence report in the Manufacturing Cloud?
Answer: B,D
Explanation:
You can use Oracle Transactional Business Intelligence to create analysis and Oracle
Business Intelligence Publisher to create reports.
Question No : 33
A production Operator is executing work order in your plant. After completing move
transactions, he notices that he has performed some incorrect move operations, including
incorrect scrap and reject transactions. He is required to perform a reverse transaction to
correct the errors. The operations are not count point enabled and not auto charged.
Answer: A,B,E,F
Question No : 34
You are monitoring the production status on your shop floor. The production operator
informs you that a particular resource that was not functioning for the past week is now
back in operation.
Which option shows the steps to quickly release the work orders affected by this operation,
which were put on hold using the mobile application?
A. Select the infotile On Hold> Select a work order you want to release> Select the work
order operation on hold > Swipe left on the work order name> Tap or click the Release
action, and click OK
B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the
work order name> Tap or click the Release action, and click OK
C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on
the work order name> Tap or click the Release action, and click OK
D. Select the infertile Dispatch List> Select a work order operation you want to release>
Swipe left on the work order name> Tap or click the Release action, and click OK
Answer: B
Question No : 35
While creating an item in Product Information Management (PIM), the following two item
templates are selected in sequence and applied.
16
Oracle 1z0-348 : Braindumps Questions
D. WIP = No, Customer Ordered = No
Answer: C
Question No : 36
One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you
can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production
operator?
Answer: E
Question No : 37
The Plant Manager informs you that they have bought several machines for their
manufacturing plant ABC. The plant has been set up with a separate cost element set ABC
in Manufacturing Cloud. You are requested to configure these machines in such a way that
those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.
A. Set up the machines as cost element type of “Resource” by selecting Cost Element set
ABC.
B. Set up the machines as cost element type of “Overhead” by selecting Cost Element set
ABC.
C. Set up the machines as cost element type of “Overhead” by selecting Cost Element set
Common.
D. Set up the machines as cost element type of “Resource” by selecting Cost Element set
Common.
Answer: D
17
Oracle 1z0-348 : Braindumps Questions
Question No : 38
Which type of Movement Requests should you use to fill the manufacturing subinventory
form the Warehouse subinventory?
Answer: C
Question No : 39
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using
the Print PDF action.
Answer: A,C,D
Question No : 40
Identify two reports that provide work order cost-related information to the costing user.
18
Answer: A,D
Question No : 41
Your customer has defined the work definitions. They have created and saved a new
version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?
A. Start Date
B. Costing Priority
C. Version
D. Production Priority
Answer: A,C
Question No : 42
Identify the two purposes of the referenced Work Definition in Orderless reporting.
A. Material usage
B. Resource usage
C. Processing steps
D. Scrap material
E. Return material
Answer: A,B
Question No : 43
19
Oracle 1z0-348 : Braindumps Questions
Your customer plans to use Oracle Representational State Transfer (REST) API with
Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration
requirements.
Identify four REST resources and the corresponding HTTP action available with
Manufacturing Cloud.
Answer: A,B,D,E
Question No : 44
A plant operates three continuous daily shifts of eight hours each for five days in a week.
One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On
a particular day in a given week, due to unscheduled maintenance that needed to be
performed on the resource R1, it was not available for two hours during each of the
assigned shifts.
A. 78 hours
B. 76 hours
C. 60 hours
D. 70 hours
Answer: B
Question No : 45
You want to use a predefined Standard Operation in a Work Definition, but you also want to
change the usage of the Standard Operation resource. Identify the setup required.
20
Oracle 1z0-348 : Braindumps Questions
A. Deselect the Referenced check box while adding the standard operation to the work
definition and change the usage manually.
B. Select the Referenced check box while adding the standard operation to the work
definition and change the usage manually.
C. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
D. Use a Resource exception for the resource and alter its usage.
Answer: B
Question No : 46
What must be set up first in order for you to configure the setup task called Manage Plant
Parameters?
Answer: B
Question No : 47
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants
a work center resource R1 of 4 units to be available during a nonworking time outside the
regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center
Resource Calendar page.
A. Click Outside the existing Shift time on a Specific Date> Create Work Center page>
Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down
list> Enter 4 in Default Units Availability column.
B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create
Resource exception> Populate Start and Duration Field> Resource Availability region>
Populate 4 units in Default Availability column.
21
Answer: D
Question No : 48
The Cost Accountant has reported to the Production Supervisor that the Work Order
transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.
Answer: D
Question No : 49
Identify the manufacturing transaction that a production operator can perform for reporting
such activities.
A. Orderless Transactions
B. Operation Transactions
C. Resource Transactions
D. Movement request
E. Material Transactions
Answer: A
22
Oracle 1z0-348 : Braindumps Questions
Question No : 50
An order entry specialist creates a Back-to-Back order for product item with an intention of
fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain
Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
A. Sourcing rules for the product item are defined as Make as well as Transfer.
B. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
C. Sourcing rules for the product item are defined as Buy as well as Transfer.
D. Sourcing rule for the product item is defined as Buy.
Answer: A,B
Question No : 51
Identify two tasks that the Dispatch List allows the production users to perform.
Answer: B,D
Question No : 52
Identify the three sources from which supply chain orchestration (SCO) can create the work
orders.
23
Oracle 1z0-348 : Braindumps Questions
A. Order Management
B. Quality
C. Inventory Min-Max Planning
D. Procurement
E. Planning
Answer: A,C,E
Question No : 53
Identify four parameters that are considered in the calculation of manufacturing lead time in
Oracle Manufacturing Cloud.
Answer: A,B,C,D
Question No : 54
A. The Production Priority was not populated in the new Work Definition WD2 during
creation.
B. The Item and Structure Name in the existing Work Definition WD1 were retained in the
new Work Definition WD2 as well during creation.
C. The Item and Structure Name were changed in the new Work Definition WD2 during
creation.
D. The Start Data was not populated in the new Work Definition WD2 during creation.
24
Oracle 1z0-348 : Braindumps Questions
Answer: C
Question No : 55
You are reviewing the production status of your manufacturing plant shop floor as a
production supervisor. Your production manager wants a report on a work order status
which is reserved against a particular customer. The final assembly of the work order is
serialized.
Which option shows the steps to complete the task using the mobile application?
A. Use your mobile camera to scan the bar coded serial number of the final assembly>
Upload the barcode to open the work order details page > Click Actions and select the E-
mail icon> Select required work orders> Select the e-mail client, enter the recipient’s e-
mail, and click Send.
B. Select the infotile Customer to open the work order details page> Click Actions and
select the E-mail icon> Select required work orders>Select the e-mail client, enter the
recipient’s e-mail, and click Send.
C. Use your mobile camera to scan the bar coded serial number of the final assembly>
Upload the barcode to open the work order details page> Select required work orders>
Click Social icon (OSN) > Select recipient, and click Share.
D. Search the work order by customer name to open the work order details page> Click
Actions and select the E-mail icon> Select required work orders> Select the e-mail client,
enter the recipient’s e-mail, and click Send.
Answer: A
Question No : 56
Identify the three changes that are allowed to be made to active Work Definition in a Work
Center, without creating a new version.
A. Delete an Operation
B. Costing Priority
C. Production Priority
D. Add an Operation
E. Completion Subinventory
Answer:BDE
Question No : 57
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before
finally publishing estimates as frozen standards to cost accounting by using a cost planning
scenario. While reviewing rolled up costs, the extended costs of purchase components are
not included in a rolled-up scenario.
A. Purchase components P1 and P2 are not associated with Material cost plan of the cost
planning scenario.
B. Costs for purchase components P1 and P2 are not defined in cost accounting.
C. Create Accounting was not initiated.
D. Create Accounting Distributions was not initiated.
Answer: D
Question No : 58
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item
AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead
time is 1.25 days.
26
Oracle 1z0-348 : Braindumps Questions
Answer: B
Question No : 59
A Work Center created a month ago is no longer in use now. You want to remove the Work
Center; however, the system is no allowing you to delete it.
operation.
Answer: A,D,F
Question No : 60
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-
back item components and resources.
A. Select the Used in Planning check box in the new Work Definition.
B. Select the Used in Planning check box in the Work Definition Names.
C. Select the Used in Planning check box in the Work Structure.
D. Select the Used in Planning check box in the item definition.
Answer: B
Question No : 61
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an
equipment resource R1 is assigned to each of the three shifts. On a specific work order,
the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of
50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
27
Oracle 1z0-348 : Braindumps Questions
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
A. 8:00 PM
B. 12:30 PM
C. 2:00 PM
D. 4:00 PM
E. 1:00 PM
Answer: D
Question No : 62
Identify the two configurations in Supply Chain cloud applications of Product Information
Management (PIM) and Order promising (GOP), which must be set to process the Back-to-
Back order with Make Supply Order, for a nonstocked item.
Answer: A,B
Question No : 63
You have been asked to set up cost estimates for 10 different purchased items. Which two
steps could be used to accomplish this task?
Answer: C,E
28
Work order costs are computed based on material and resource transactions reported and
the cost method of the product. In a manufacturing plant, the production operator has
completed a work order WO-001 ensuring proper materials and resource transactions. The
materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the
accounting distributions of the work order WO-001, resources charged to the work order
are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to
cost accounting.
A. Create accounting
B. Transfer Transactions from Production to Costing
C. Transfer Transactions from Inventory to Costing
D. Transfer Costs to Cost Management
Answer: B
Question No : 65
Identify three types of Item Quantities displayed in the Work Order History tab.
A. Scrapped Quantity
B. In Process Quantity
C. Remaining Quantity
D. Total Quantity
E. Completed Quantity
Answer: A,C,E