Professional Documents
Culture Documents
MOJOKENDIL [B4]
+6
1
30
00
+9
14
62
50
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+914865
0
MINISTRY OF PUBLIC WORKS AND HOUSING Project Preparation Consultant (PPC)
DIRECTORATE GENERAL OF WATER RESOURCES Firm For Develompent of the Mrican
DIRECTORATE OF IRRIGATION AND LOWLAND Irrigation System In East Java
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
30 h
MD 3 1 l/dt
a
ka2
4
MINISTRY OF PUBLIC WORKS AND HOUSING Project Preparation Consultant (PPC)
DIRECTORATE GENERAL OF WATER RESOURCES Firm For Develompent of the Mrican
DIRECTORATE OF IRRIGATION AND LOWLAND Irrigation System In East Java
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
30 ha 41
MD 3ka2
l/dt
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
57 ha
MD 8ki
78 l/dt
60 ha
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
57 h MD 8
a ki
78 l
/dt
MD 9
15 h ki2
a
21 l/
d t
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 01
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
Tabel Kerusakan Saluran
Province : EAST JAVA
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
Tabel Kerusakan Saluran
Province : EAST JAVA
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
Tabel Kerusakan Saluran
Province : EAST JAVA
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
Tabel Kerusakan Saluran
Province : EAST JAVA
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
Tabel Kerusakan Saluran
Province : EAST JAVA
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
District : NGANJUK
PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet :
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 03 - 11 - 02
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun
PT. Terasis Erojaya Date : No. of Contract :
3/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A = 1509.00 Ha
= 2234 m3/dt
V = 0.747 m/dt
b = 6.00 m
h = 0.60 m
i = 0.000320
k = 65
m = 1
n = 10
w = 0.60 m
+56.79 +56.79
+54.78 +.54.78
2.00 2.00
0.20 +0.30
+53.58
+55.19
+54.18
0.10 A A +54.79
+ 55.79
+ 55.79
+53.58 52.77
6.00
10.00 ± 0.00
10.70
0.05 +54.17
+53.36
5.00
2.00 2.00 6.00
+54.78
+54.78 +54.78
DENAH S, A
PLAN
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 573/1029
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm VIRAMA in joint venture with:
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 01
Korean Rural Community Corporation
3. Dipasang Papan nama bangunan / Nomenklatur baru PT. Wiratman
PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
29/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A 1509.00 Ha
2234 m3/dt
0.60 0.60
1.50 V 0.747 m/dt
+54.59
+1.20
b 6.00 m
+54.59 2.70 2.70 +54.58 h 0.60 m
+56.29 +56.29
i 0.000320
0.20 k 65
0.20 m 1
+53.39
n 10 +55.29
+54.59 +54.59
A A
+53.99
w 0.60 m
3.70
+53.99 +53.38 +54.09 +54.09
-1.20
6.00
+0.20
0.05
0.10
7.90 +53.98
+53.39
4.90
5.30
+54.59
DENAH S, A
PLAN
+55.29
+55.09 +55.09
+54.59 +54.59
+53.99 +53.98
LEGENDA
53.39 +53.38 4 2 0 2 4 6 8 10 M
LEGEND
SKALA. A / SCALE. A
K-225 Beton Tumbuk K - 225
Concrete K - 225
POTONGAN A - A S, A
2 1 0 1 2 3 4 5M
SECTION K-100 Beton K - 100 SKALA. B / SCALE. B
Concrete K - 100
1:4 Pasangan Batu Kali 1PC : 4Ps KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Stone Masonry 1PC : 4send Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Permukaan tanah Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Ground Surface SALURAN SEKUNDER MOJOKENDIL (B4)
Subject: Scheme : D.I MRICAN
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 574/1029
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm VIRAMA in joint venture with:
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 02
Korean Rural Community Corporation
3. Dipasang Papan nama bangunan / Nomenklatur baru PT. Wiratman
PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
29/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+54.82
+54.49
B
±0.00 54.82 54.85 ±0.00
SAL. SKUNDER KIRI
+54.32 -0.50 -0.50 Ruas 1
+53.29
A 1509.00 Ha
0.20
2234 m3/dt
A A
+53.89
V 0.747 m/dt 0.05
0.10
b 6.00 m +53.29 +53.28
6.00
A A h 0.60 m
0.05
i 0.000320
6.00
3.70
m 1
0.10
n 10
TMH BARU 6.50m
53.30
w 0.60 m
0.20
+54.49
+54.32
2.05
+46.22 1.89
+54.49 1.10 +54.48
54.77 54.71
B 0.30
+54.82
0.30
2.97 2.00
4.97
DENAH , S. B
PLAN B
3.70
TMH (baru)
0.30 3.10 0.30
+54.49 +54.48
+53.99 +53.98
+53.89 +53.88
+0.80 +0.80 +53.29 +53.29 +53.28
+0.50 +0.50 6.50
± 0.00 ± 0.00 ± 0.00
-0.50
+53.90
53.31
+53.30
POTONGAN A - A S, B
SECTION
0.30
1.10 0.20
+54.49
+54.49
+53.89
+53.29
0.10
0.05 0.20
± 0.00 ± 0.00 6.00 0.20
1.89
-0.50 -0.50
POTONGAN B - B S, B
SECTION
-1.20
6.00
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 1c HM 12+23 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send TMH (TEMPAT MANDI HEWAN) BMD 1d HM 12+61 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 575/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 03
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+54.46
+54.46 +54.73 +54.45 +54.45
+53.95
SAL. SKUNDER KIRI SAL. SKUNDER KIRI
0.20 Ruas 1 Ruas 1
+53.85
0.20
+53.26
A 1509.00 Ha A 1509.00 Ha
2234 m3/dt 2234 m3/dt
0.05
b 6.00 m b 6.00 m
h 0.60 m h 0.60 m
6.00
6.00
+53.26 7.6 ±0.00 +53.26 53.85 7.6 +54.45 53.85
2.30 i 0.000320 2.30 i 0.000320
k 65 0.10 k 65
0.10 m 1 m 1
+53.25
n 10 n 10
w 0.60 m w 0.60 m
+53.95
2.05 2.05
+54.46
+54.45
B 0.30 B 0.30
2.30
+55.26 +55.26
2.30 +54.96 +54.96
POTONGAN A - A S, B
+53.86 +53.86 SECTION
+53.26 +53.26
POTONGAN A - A S, B
SECTION +55.26
+54.96
+54.45
+55.26
+53.95
+54.96
+54.46 +54.46
+53.85
6.00
+53.86 +53.86
+53.26
POTONGAN B - B S, B
6.00 SECTION 4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
POTONGAN B - B S, B
2 1 0 1 2 3 4 5M
SECTION
LEGENDA SKALA. B / SCALE. B
LEGEND
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 1e HM 13+16 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 1f HM 14+08 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 576/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 04
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+53.08
E E 0.30
5.80
5.80
POTONGAN D-D , SKALA
SALURAN SEKUNDER B.4 +54.34 +54.34
SCALE
B
SECTION
B.4 SECONDARY CANAL
0.20
Q = 3.133 m/s
B = 5.80 m +54.38 +54.38
H = 0.76 m
v = 0.63 m 1 1
1 +53.84 1
i = 0.00030
1.05
I =1:1
n = 0.020 +53.08
Fb = 0.54 m
D
5.80
0.30
+54.38
C
POTONGAN C-C , SKALA
B
SECTION SCALE
+54.13
TABEL PINTU
A .08
TABLE OF GATE
3
+5
PINTU / GATE
+53.84
+53.08
NO
+53.08 STRUCTURE STATION No Type w (cm) b (cm) H (cm) H' (cm) REMARKS
TURNOUT
1 1 70 85 118 205
KW. 76
B D
0.70
91
+53.
+53.10
+53.00
B
11
+53.
+54. 11
+53.
2 0
61
POTONGAN
+53.
1-1 +53.
91
SECTION
SKALA
B Pintu 4 2 0 2 4 6 8 10 M
SCALE
91
No.1
Gate
+53.
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
+53.52
SKALA. B / SCALE. B
+54.38 +54.38
+54.00 +54.20 +54.20
+53.84 +54.00 +54.00 +53.91
0.60 +53.80 +53.80 +53.70 Ø 0.60 +53.61 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
+53.08 +53.20 +53.10 +53.10 +53.11 +53.11 DIREKTORAT JENDERAL SUMBER DAYA AIR
+53.00 Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
3.70 2.30 8.75 2.00 5.20 3.40 2.00 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
+54.05
B
+54.61 +53.10 +55.11
+52.90
0.20 ±0.00 0.20 SAL. SKUNDER KIRI
Ruas 1
0.20
A 1509.00 Ha
0.05
2234 m3/dt
A A
+53.45
4.50
0.05
V 0.747 m/dt
54.54 53.30 b 6.00 m
6.00
6.00
±0.00 54.53 9.00 53.29
7.6
+53.90
h 0.60 m
0.93 0.10 i 0.000320
0.10
A
+52.90
k 65
53.30
m 1
n 10
+54.61
2.00 -0.50
+53.10 ±0.00
+53.07
7.00
B
+55.11
A 1509.00 Ha
2234 m3/dt
7.00
± 0.00 ± 0.00 ± 0.00 V 0.747 m/dt 4.50
+53.64 b 6.00 m
-1.20 -0.50 53.30 53.29
-0.50-1.20
h 0.60 m
+0.80 +0.80
i 0.000320
k 65
m 1
n 10
w 0.60 m
POTONGAN A - A S, B
SECTION
POTONGAN A - A S, B
SECTION
± 0.00 ± 0.00
-0.50 -0.50
± 0.00 ± 0.00
53.30
-0.50 -0.50
6.00
POTONGAN B - B S, B
SECTION
6.00
POTONGAN B - B S, B
SECTION
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 2a HM 17+28 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 2b HM 24+54 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 578/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 06
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
-0.50
-0.50 2.00
SAL. SKUNDER KIRI
0.20 Ruas 2
A 1509.00 Ha
2234 m3/dt
0.05
A A V 0.747 m/dt
53.30 b 6.00 m
6.00
-1.70 ±0.00 53.29 -1.70 h 0.60 m
+53.90
i 0.000320
0.10 k 65
53.30
m 1
0.20 n 10
w 0.60 m
0.20
-0.50
-0.50 -0.50
±0.00 54.49 +54.48 ±0.00
B
± 0.00
4.50
+0.80 +0.80
POTONGAN A - A S, B
SECTION
± 0.00 ± 0.00
-0.50 -0.50
LEGENDA
4 2 0 2 4 6 8 10 M
LEGEND
SKALA. A / SCALE. A
K-225 Beton Tumbuk K - 225
-1.20
Concrete K - 225 5M
2 1 0 1 2 3 4
1:4 Pasangan Batu Kali 1PC : 4Ps KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Stone Masonry 1PC : 4send Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
POTONGAN B - B S, B DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Permukaan tanah
SECTION Ground Surface
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 579/1029
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm VIRAMA in joint venture with:
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 08
Korean Rural Community Corporation
3. Dipasang Papan nama bangunan / Nomenklatur baru PT. Wiratman
PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
v = 0.20 m/s 0
t =1:1
1.0
s = 0.00028
n = 0.030
2 .70
6 +5
3.6 2.00
J f = 0.30 m
t =1:1 +5 DETAIL A
s = 0.00050 0 1.30 Skala . B / Scale . B
2 .7
+5
f = 0.34 m
2 .56
PINTU +5
I GATE
NO.5
F 16.60
2.00 1.50 13.50 2.20
+53.66 +53.66
+53.49 +53.86
+52.41
+52.89 +52.71 0.40 +52.86 +52.56
PINTU
C GATE NO.6
B +53.86 B G
+53.66
I +54.09
PINTU NO.4
GATE
18.50
PINTU NO.2 +53.89
Saluran Sekunder B.4 (Hilir) GATE +53.89
B.4 Secondary Canal (D/S) Saluran Sekunder B.4 (Hilir)
+54.09 B.4 Secondary Canal (D/S)
Q = 2.870 m3/s
b = 5.80 m Q = 2.726 m3/s
0.60
h = 0.96 m A 1.75 Detail A A b = 4.50 m
v = 0.44 m/s h = 0.81 m
n = 0.023 +52.49 +52.49 +52.49
1.00 v = 0.64 m/s
+54.09
t = 1:1 n = 0.023
s = 0.00015 1.75 t =1:1
f = 0.64 m 0.60
H H s = 0.00040
1:4
f = 0.59 m
+52.49
PINTU NO.1 +53.89
GATE
PINTU NO.3
GATE
G
5.00 5.60 2.00
0.50 0.50
K+53.66 +53.66
+53.66
+53.42 0.50
0.30
+52.29 +53.89 +53.89
+52.82 +52.66 0.40 +52.86 +52.67
+5
+53.30
+5
D
3.6
2.6
6
+53.86 +52.49
7
+5
+53.42
D +53.66
3.6
+53.66 PINTU
+53.66
F NO.8
6
GATE 4.50 2.00
PINTU
NO.7 GATE
K 0.80
2.00 1.50 11.00 1.20
+5
2.50
POTONGAN. G - G / SECTION G - G
2.8
0.50 0.50 Skala . A / Scale . A
+5
3.6
Saluran Tersier a 53 12.50
DENAH/PLAN
6
a 53 Tertiary Canal
Skala . A / Scale . A
Q = 0.030 m3/s
+5
+5
3.6
L
2.8
b = 0.30 m
6
0.50
+5
6
3.6
h = 0.26 m +53.89
6
A Ø 0.10 - 0.20 +53.89
v = 0.20 m/s 0.15 +53.30
1.30 1.00
A Ø 0.10 - 0.20
+5
n = 0.030
+5
0.50 +52.49
2.6
3.6
t =1:1
6
6
A B 0.15
2.00
s = 0.00050 0.15 5.30 2.00
0.30
f = 0.34 m L 0.50
1.75
POTONGAN. H - H / SECTION H - H
+5
3.5
Skala . A / Scale . A
DETAIL PENULANGAN PELAT UNTUK JEMBATAN PELAYANAN
+5
Saluran Tersier a 53
7
2.8
+5
DETAIL OF SLAB REINFORCEMENT FOR OPERATION DECK a 53 Tertiary Canal
3.5
2
Skala . C / Scale . C E 4 2 0 2 4 6 8 10 M
7
Q = 0.107 m3/s SKALA. A / SCALE. A
b = 0.50 m 1 2 0 1 2 3 4 5M
BANGUNAN SADAP, JEMBATAN & TMH BMD 2 (KW77) HM 39+89 District : NGANJUK
+54.74 0.30
C
+54.09 +53.96 +53.16 L
+53.89 +53.89 TABEL PINTU / TABLE OF GATE
+53.45 +53.66 +53.66
+53.30 +53.30
+52.59 +53.28
+52.49 +52.49 +52.49 +53.15 Bangunan Stasiun Pintu / Gate Keterangan
No
+52.86 Structure Station Remarks
+52.71 No. Type w (cm) h (cm) H (cm) H1 (cm)
9.20 2.00 4.10 18.50 Kw. 77 3+946 1 IV 175 120 240 160 Baru / New
+53.15
+53.96
+52.86
POTONGAN C - C / SECTION C - C +52.66
Skala . A / Scale . A
0.20 0.20
PINTU
POT.K-K / SECT. K-K
NO.7 Skala . B / Scale . B
GATE
+53.16
+53.86
+53.66 +53.66
+53.41 +53.28 +53.28 +53.42
+53.08 +53.08
+52.67 +52.86 +52.86 +52.82
+52.66
+52.29
0.30
0.50 CL
0.50 2.50 11.00 1.50 2.00 +53.16
+53.66 +53.66
1
+53.32 1
0.50 0.50
PINTU
NO.6
GATE
+53.16
+53.86 +53.66
POT. L-L / SECT. L-L
+53.66 +53.57
+53.41 +53.32 +53.08
Skala . B / Scale . B
Ø 0.50 +52.86 +52.82
+52.67 +52.66
+52.29
0.80 0.50
4.65 2.50 10.00 1.50 2.00
POTONGAN E - E / SECTION E - E
Skala . A / Scale . A
1.50 4.85 1.75 1.75 6.00 1.50 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1.00 BANGUANAN SADAP, JEMBATAN & TMH BMD 2 (KW77) HM 39+89 District : NGANJUK
+ 50.54
+ 51.54
+ 51.54
b 0.60 m b 2.50 m 0.45 m
+ 53.20
b
+ 53.20
5.00
+ 52.09
II 100 90 220 Baru / New
m m 110
+ 53.20
h 0.56 h 0.56 h 0.41 m KW. 78 0.999 1
+ 53.20
+ 52.10
i 0.00020 i 0.00025 i 0.00032 0.132 2 I 40 110 141 221 Baru / New
+ 53.20
+ 53.20
+ 51.88
+ 53.20
+ 53.20
+ 51.88
+ 50.28
+ 51.90
Baru / New
+ 51.80
0.076 6 I 50 80 111 171
+ 53.50
0.176 8 I 50 90 110 190 Baru / New
2.80 0.50
+ 51.16
+ 52.10
I 35 90 110 190 Baru / New
L 0.148 9
+ 52.73
+ 52.73
0.60
+ 53.20
+ 52.24
+ 53.20
0.75
37.80
+ 53.50
SAL. SEK. B13
0.80
Q 0.193 m3/dt
38.50
0.36 m/dt
+ 53.20
V
b 1.00 m
+ 52.10
h 0.38 m
i 0.00060
+ 50.60
+ 53.20
+ 52.73
n 0.027
+ 52.73
SAL. TERSIER a.55 f 1:1
23.60
N Fb 0.65 m
Q 0.069 m3/dt + 53.30
+ 53.30 + 52.80
V 0.21 m/dt + 53.56 + 53.56
b 0.40 m HH D
h 0.38 m D 0.50
i 0.00030
I
0.50 4.50 + 52.04 1.20 + 52.04 1.00 + 51.60 + 51.80
n 0.030
f 1:1
0.50
Fb 0.32 m
+ 52.80 SAL. TERSIER a.57
+ 53.56
+ 53.30
M 0.80
32.20
+ 53.30
+ 52.24
+ 52.16
0.60 2.50
SAL. SEK. B11 + 53.30
Q 0.120 m3/dt
Q 0.327 m3/dt + 53.25 + 53.40 + 53.75 + 53.30 V 0.20 m/dt
+ 52.83
+ 53.15
+ 53.20
I b 0.60 m
V 0.43 m/dt
+ 53.20
h 0.63 m
b 1.00 m 0.80
+ 53.37
0.60
h 0.46 m + 51.90
3.50 + 51.90 + 52.10 0.50 + 51.78 + 51.88 i 0.00020
+ 52.10 + 52.20 + 52.20 0.50
F 0.75
n 0.030
+ 53.20
i 0.0009 + 52.07
n 0.027 F + 53.37 + 52.83
f 1:1
+ 53.15 + 53.40 Fb 0.32 m
f 1:1 + 53.15 18.25 3.00 35.60 2.50
+ 53.40
Fb 1.18 m + 53.40
0.60
+ 52.53
+ 52.93
+ 53.25
0.40
B E B
+ 52.53
8.00 C
+ 53.40
21.65 0.50 + 51.83
+ 53.40 2.55 1.00 6.80 + 51.43 2.80 + 51.63 1.50 + 51.42
+ 53.15 + 52.20
+ 53.25
3.50
+ 53.56
+ 53.40
V 0.20 m/dt + 52.93
b 0.40 m E + 53.18
K
+ 53.56
+ 53.15
+ 53.15
K + 53.40 + 53.40 SAL. SEK. B12
h 0.26 m + 53.18 34.20 1.50 8.00
i 0.00040 1.80 20.25 0.50 Q Q 0.998 m3/dt
2.50
n 0.030 M + 53.64
N V 0.62 m/dt
LEGENDA 2.70
f 1:1 b m
LEGEND
Fb 0.32 m h 0.89 m
1:2:3 Beton bertulang 1PC : 2Ps : 3 Kerikil
ALAT UKUR Reinforced Concrete 1PC : 2send : 3 grevel
i 0.00050
SALURAN DEBIT MEASUREMENT STRUCTURE
KETERANGAN + 54.10 n 0.023
CANAL DISCHARGE LEBAR TINGGI TEBAL REMARKS
WIDTH HEAD LENGTH 1:4 Pasangan Batu Kali 1PC : 4Ps f 1:1
(m) (m) (m) Stone Masonry 1PC : 4send
B.4 0.986 Baru / New
Fb 0.51 m
2.60 0.35 0.60
2.30 Permukaan tanah
Baru / New
B.11 0.327 1.00 0.31 0.80
SAL. SEK. B4 Hulu Ground Surface KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
B.12 0.999 1.50 0.35 1.00 Ambang Drempel Rehab J J DIREKTORAT JENDERAL SUMBER DAYA AIR
Project Preparation Consultant (PPC)
Firm For Develompent of the Mrican
B.13 0.193 1.00 0.22 0.60 Baru / New
Q 2.726 m3/dt 4 2 0 2 4 6 8 10 M DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
4.50 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
V 0.64 m/dt 7.50
+ 53.64
a.54 0.40 0.15 0.30 Ambang Drempel Baru Subject: Scheme : D.I MRICAN
+ 53.64
b 4.50 m 2 1 0 1 2 3 4 5M
a.55 0.042 0.60 0.17 0.50 Ambang Drempel Baru BANGUNAN BAGI SADAP BMD 3 (KW78) HM 45+98 District : NGANJUK
0.148
h 0.61 m SKALA. B / SCALE. B
a.56 0.60 0.28 0.60 Ambang Drempel Baru Province : EAST JAVA
i 0.0004 Prepared by Fahim Anshori, S.T. No. of Sheet : 582/1029
a.57 0.120 0.50 0.26 0.60 Baru / New PT. VIRAMA KARYA (Persero)
n 0.023 VIRAMA
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 04 - 11 - 03
a.58 0.076 0.50 0.19 0.80 Ambang Drempel Rehab PT. Wiratman
f 1:1 PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
Fb 0.69 m A No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
31/5/21 KU.02.10/Ai/III/12
+ 54.10
+ 53.64 + 53.56 + 53.56
+ 53.20 + 53.20 + 53.20
+ 53.05 + 53.05 + 53.05
+ 52.73 + 52.73
+ 52.24 + 52.26 + 52.23 + 52.23
+ 52.16 + 52.00 + 52.16
+ 51.88 + 51.88
+ 51.54
+ 51.16 + 51.16 + 51.12
7.50 + 50.60 + 50.54
11.70 3.40 11.90
+ 50.28
PINTU
No.3
POTONGAN A - A S, A
GATE
SECTION 4.00
0.60
38.50 3.00 2.60 5.00
PINTU
No.4
+ 53.56 21.65 GATE
+ 53.40 + 53.40
+ 53.05 + 52.95
+ 52.77 + 52.77
Ø 0.60 + 52.46 + 52.53 + 52.53
+ 52.00 + 51.97 + 53.56
+ 53.20
+ 51.85 + 51.85 + 51.85 + 53.30 + 53.30
+ 51.53 + 53.05
+ 53.20
+ 51.23 + 52.87 + 52.83
+ 52.49 + 52.61 + 52.51
Ø 0.50 + 52.24
+ 52.16 + 52.10 + 52.10
POTONGAN B - B S, A 0.60 2.50 3.00
+ 51.90 + 51.78 + 51.88
SECTION
6.00 3.00 2.00 27.40 0.60 2.50 2.00
PINTU No.1
GATE 0.30
+ 53.64
POTONGAN I - I S, A
SECTION
+ 53.93
+ 53.56 + 53.61
+ 53.40 + 53.40
+ 53.25 + 53.25
+ 53.05 + 52.93 + 52.93
+ 52.77 + 52.77
+ 52.42
+ 52.16 + 52.24
+ 51.83 + 51.83 + 53.64 + 53.64 + 53.56 + 53.56
+ 51.63 + 51.63
+ 51.43 + 51.42 + 53.05 + 53.05
+ 52.24 + 52.20
1.00 8.00 4.10
5.00 1.00 34.20 1.00
PINTU
GATE
No.5 POTONGAN C - C S, A
0.50
4.50 3.50
SECTION POTONGAN K - K
POTONGAN J - J S, A
SECTION
S, A SECTION
+ 53.56 + 53.20
+ 53.20 + 53.30 + 53.20 + 53.30
+ 53.05
+ 52.76 + 52.76 + 52.80 + 52.80
+ 52.54 + 52.59 0.50
+ 52.16 + 52.09 Ø 0.50 + 52.14 + 53.50 0.60 + 52.55
+ 52.04 + 52.04 + 53.20 + 53.20 + 53.20
+ 51.80 + 53.15
+ 51.60 + 52.87 + 52.73 + 52.73 + 52.74
+ 52.24 + 52.23 + 52.10
4.25 32.20
0.60 2.20 2.00
0.30 + 51.85 0.75
PINTU
POTONGAN D - D S, A
0.80
GATE
No.2 SECTION 2.80
POTONGAN L - L S, A
+ 53.56
+ 52.72 + 53.00 SECTION
+ 53.05 + 53.18 + 53.18 + 53.15 + 53.02
Ø 0.40 + 52.87 + 52.70
+ 52.42 + 53.20
+ 53.15 + 52.05
+ 52.00 + 52.00
0.50 1.00
+ 52.87 + 52.46 + 52.78
+ 53.40 + 53.40 + 53.40
0.50 2.50 2.10 + 53.18 + 53.20 + 53.20
4.00 20.25 + 52.95
+ 52.72 + 52.77
1.80
POTONGAN E - E S, A + 53.16 + 52.05
+ 51.85
+ 52.20
SECTION 0.80
0.80
PINTU 1.00
GATE
No.8
+ 52.00
+ 52.27
+ 52.07
+ 52.24 + 52.24 + 52.10 SECTION Stone Masonry 1PC : 4send
+ 51.90
Permukaan tanah
Ground Surface
4.20 2.55 23.60 1.40 0.60 2.50 2.00
PINTU
No. 6
GATE POTONGAN G - G S, A 4 2 0 2 4 6 8 10 M
SECTION
SKALA. A / SCALE. A
+ 53.05 + 53.05 + 53.15
+ 53.56 + 52.55 2 1 0 1 2 3 4 5M
+ 53.05 + 53.20 + 53.20 + 53.20
+ 52.74 + 52.74 + 52.85 SKALA. B / SCALE. B
+ 52.45 Ø 0.50 + 52.50
+ 52.16 + 52.10 + 52.10 + 52.09
+ 51.80 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
2.90
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
5.50 37.80 0.60 2.50 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
+47.84
+47.84 +47.84 54.73 ±0.00
A = 1509.00 Ha A = 1509.00 Ha
-0.50
+54.40
= 2234 m3/dt = 2234 m3/dt
b = 6.00 m b = 6.00 m
m m
A A h
i
=
=
0.60
0.000320
h
i
=
=
0.60
0.000320
+47.24
A A
+46.54
0.05
4.70
k = 65 k = 65
4.00 +46.77 +46.77 7.30 +46.77
m = 1 m = 1
n 10 53.30 ±0.00 53.27 n 10
= =
+53.90
w = 0.60 m w = 0.60 m
+53.30
+47.84
+54.40
DENAH S, A -0.50
A PLANE 54.53 54.53 ±0.00
B 0.30
+54.90
4.40
+0.80 +0.80
+0.50 +0.50
0.20 0.20
3.00
+48.84 POTONGAN A - A S, A
+47.84
+48.04
+47.84 SECTION A - A
+47.47
+46.77 +46.77
POTONGAN A - A S, A
SECTION A - A ± 0.00 ± 0.00
-0.50 -0.50
-1.20
POTONGAN B - B S, A
SECTION B - B
+47.84 +47.84
4 2 0 2 4 6 8 10 M
+47.24
SKALA. A / SCALE. A
+46.54
0.8 0.4 0 0.4 0.8 1.2 1.6 2M
4.70
LEGENDA
LEGEND
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225
POTONGAN B - B S, A
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
SECTION B - B DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 4a HM 49+88 District : NGANJUK
Stone Masonry 1PC : 4send JEMBATAN BMD 4b HM 54+25 Province : EAST JAVA
USULAN PEKERJAAN : PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 584/1029
Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
1. Dibuatkan lantai baru dari beton tumbuk K-225 VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 09
Ground Surface Korean Rural Community Corporation
PT. Wiratman
2. Dipasang Papan nama bangunan / Nomenklatur baru PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
PT. Terasis Erojaya
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+50.82 +50.81
B
+50.75
+50.82
+50.75
+50.75 +50.75
+49.85
+50.25 +50.25
+49.92
SAL. SKUNDER KIRI
Ruas 4
+50.32
+50.25
0.20
A A A A A 1509.00 Ha
0.05
0.05 2234 m3/dt
2.50
2.50
+49.92 +49.90
+49.85 +49.84 V 0.747 m/dt
0.10 TMH BARU 6.50m 0.10
±0.00 b 6.00 m
0.20 h 0.60 m
0.20
+50.82
+50.75
i 0.000320
+50.25 +50.25 k 65
+50.75 +50.75
m 1
+49.92 1.89
n 10
+50.82 1.10 +50.81 B w 0.60 m
0.30
2.97 2.00
4.97
DENAH , S. B
PLAN
A 1509.00 Ha
2234 m3/dt
V 0.747 m/dt
b 6.00 m
h 0.60 m
i 0.000320
k 65
m 1
n 10
w 0.60 m 4.40
+51.55 +51.55
TMH (baru) +51.25 +51.25
POTONGAN A - A S, A
POTONGAN A - A S, B SECTION A - A
SECTION
0.30
1.10 0.20
+54.49
+54.49
+53.89
+53.29
0.10
0.05 2.50
1.89
+51.55 +51.55
+51.25 +51.25
POTONGAN B - B S, B +50.75 +50.75
SECTION
+50.25 +50.25
+49.85
4 2 0 2 4 6 8 10 M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 4c HM 54+99 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 4d HM 55+85 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 585/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 11 - 11 - 02
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+50.63
+46.24 TERTIMBUN 0.30 SAL. SKUNDER KIRI SAL. SKUNDER KIRI
+50.82
Ruas 4 Ruas 4
+46.19 +50.13 +50.13
+45.89 2.00 +45.89 A 1509.00 Ha A 1509.00 Ha
1.50 2234 m3/dt
A A
+50.13
2234 m3/dt
0.20
A A V 0.747 m/dt 0.10 V 0.747 m/dt
+49.92
0.05
2.50
b 6.00 m ±0.00 -1.20
+49.73
0.10 +49.73 +49.73 b 6.00 m
+50.32
+50.63
m 1 m 1
+50.13 +50.13
99
+45.50
+50.82
3.70
6.
+45.89 n 10 +50.63 +50.63 n
+4
+46.00 10
w 0.60 m w 0.60 m
B B 0.30
DENAH S, A
PLAN
2.30
POTONGAN A - A POTONGAN A - A S, A
S, A SECTION
SECTION
+49.73
+44.89
2.50
1.50 2.50
0.30
4 2 0 2 4 6 8 10 M
POTONGAN B - B S, B SKALA. A / SCALE. A
SECTION 0.8 0.4 0 0.4 0.8 1.2 1.6 2M
SKALA. B / SCALE. B
LEGENDA
USULAN PEKERJAAN : LEGEND
1. Bangunan masih baik dipertahankan Beton Tumbuk K - 225
K-225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
2. Tempat mandi hewan tertimbun tanah Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR
3. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Firm For Develompent of the Mrican
4. Dipasang Papan nama bangunan / Nomenklatur baru DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 4e HM 57+30 District : NGANJUK
Stone Masonry 1PC : 4send JEMBATAN BMD 4f HM 57+54 Province : EAST JAVA
Permukaan tanah
POTONGAN B - B S, B
PT. VIRAMA KARYA (Persero)
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
Prepared by Fahim Anshori, S.T. No. of Sheet : 586/1029
+50.41
0.30
+49.51
+50.44 +50.44 54.73 ±0.00
+50.44 +50.44 SAL. SKUNDER KIRI
+49.94 -0.50 +49.94 Ruas 4
+49.91
2.05 A 1509.00 Ha
2234
0.05
m3/dt
A A +49.51 +49.50
2.50
+49.94
V 0.747 m/dt
0.05 0.10 TMH BARU 6.50m
2.50
b 6.00 m
+49.54 ±0.00 49.53
A A
+49.54
h 0.60 m 0.20
0.10 3.50
+50.41
i 0.000320
0.20 k 65
0.01
2.05
+50.44
m 1
+49.94 +49.94 1.89
-0.50 n 10
+50.44 +50.44
54.53 ±0.00 w 0.60 m
+50.41 1.10 +50.40
B 0.30
0.30
2.97 2.00
A 1509.00 Ha
B 2234 m3/dt
V 0.747 m/dt
b 6.00 m
DENAH , S. B h 0.60 m
PLAN i 0.000320
k 65
m 1
n 10
w 0.60 m
3.80
POTONGAN A - A S, B
SECTION
POTONGAN A - A S, A
SECTION
0.30
1.10 0.20
+50.44
± 0.00 +50.44
+50.41
+49.91
+49.94 +49.94 0.05
+49.51
0.10
2.50
1.89 0.20
+49.53
3.80
10 M
POTONGAN B - B POTONGAN B4 - B S, B
2 0 2 4 6 8
S, B SKALA. A / SCALE. A
SECTION SECTION
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 4g HM 60+30 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send TMH (TEMPAT MANDI HEWAN) BMD 4h HM 60+61 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 587/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 13
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+50.22
+50.27 SAL. SKUNDER KIRI
+50.20 ±0.00 SAL. SKUNDER KIRI
Ruas 4 -0.50 Ruas 4
+49.39
+49.32
A 1509.00 Ha A 1509.00 Ha
3.50 3.50
2234 2234
A A m3/dt
A A m3/dt
+49.79
+49.72
V 0.747 m/dt V 0.747 m/dt
0.05 0.05
-1.20 -1.20
2.50
2.50
+49.39 +49.37 b 6.00 m +49.32 +49.35 b 6.00 m
h 0.60 m h 0.60 m
0.10 0.10
±0.00 i 0.000320 ±0.00 i 0.000320
0.20 0.20
k 65 k 65
2.05 2.05
+50.29
+50.22
m 1 m 1
n 10
-0.50 n 10
+50.29 +50.27 +50.22 +50.20 ±0.00
w 0.60 m w 0.60 m
B 0.30 B 0.30
3.50 3.50
+51.09 +51.09 +51.02 +51.02
+50.79 +50.79 +50.72 +50.72
POTONGAN A - A S, A
POTONGAN A - A S, A
SECTION SECTION
3.94
4.70
POTONGAN B - B S, B
POTONGAN B - B S, B
SECTION SECTION
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 4i HM 62+14 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 4j HM 63+04 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 588/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 14
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
7
9. 7
Bangunan Stasion Pintu/Gate Keterangan
+4
2
9.1
Pintu No.
No.1 Structure Station No. Type w(cm) h(cm) H(cm) Hi(cm) Remarks
+4
Gate
Saluran Tersier ai.56
7
9.7
aI.56 Tertiary Canal KW.79 6+503 1. I 40 55 197 117 Diganti/Replaced
+4
+50.44 +50.44 +50.44 2. I 40 70 213 133 -II-
Q = 0.051 m3/s +50.14 +50.14
+49.62 3. III 40 40 120 65 Baru/New
b = 0.40 m F +49.60
.97
+49.27 4. III 40 40 120 65 -II-
F +59.04 +59.04
8
h = 0.33 m
+4
v = 0.21 m/s 0.30
0
n = 0.030
9.5
7.00 6.20 7.00
0.45
+4
t = 1:1
s = 0.00038
POTONGAN A - A / SECTION A - A
Skala . A / Scale . A
f = 0.32 m
5
9.1
0
9.5
+4
+4
Pintu
No.1
Gate
+49.27
+50.44 +49.35
+50.04
0
Ø 0.40 +49.90 +49.90
9.5
+49.62 +49.77
+49.51 +49.45
+4
+49.04 +49.15
+48.97 1:10 +49.12
0
9. 5
0.40
1.20 3.15 2.10 7.90
+4
2.90 1.80
4
0.0
+5
POTONGAN B - B / SECTION B - B
5
9.1
Skala . A / Scale . A
+4
Pintu
No.1 +50.44
Gate
+50.44 +50.44 Pintu
No.4
Gate
+49.11
+50.14 +50.14 + 49.21
+50.44 +49.33
+ 50.06 + 50.06
A B A +49.62 Ø 0.40
+ 49.50
+49.76
+49.44
0.50
+49.77
+ 49.86
+ 49.39
+49.04 + 49.15 + 49.15 +49.15 +49.01
+ 48.72
+49.04 +49.04 +49.04
C 1.20 3.10 3.10 3.30 1.50 2.00 8.10 1.30
0.40
POTONGAN B - B / SECTION C - C
Skala . A / Scale . A
+50.44
Pintu
No.2
Gate
Saluran Sekunder B.4 (Hulu)
B.4 Secondary Canal (U/S) Pintu Pintu No.4
Saluran Sekunder B.4 (Hilir) No.3
Gate Gate
B.4 Secondary Canal (D/S) +49.21 +49.21
Q = 0.986 m3/s
+4
+49.86
9.1
+49.27 +49.27
h = 0.58 m DENAH / PLAN b = 2.50 m +48.96 +48.96
+48.72 +48.72
+5
0.60 t = 1:1
F = 0.52 m s = 0.0006 POTONGAN D - D / SECTION D - D
+5
Skala . A / Scale . A
+4
f = 0.4 m
9
0.0
.15
6
+4
0.30
℄ +49.35
9.1
+49.90 +49.90
Q = 0.075 m3/s +49.76 1
+49.45
b = 0.40 m
TABLE OF BROAD CRESTED WEIR E h = 0.37 m +49.15 +49.15 +49.15
+48.97
Debil Alat ukur drempel v = 0.26 m/s
Saluran Discharge Broad crestead weir Keterangan n = 0.025
+4
D +49.63 +49.61 D
0.40
+48.96 + 48.72 + 48.72 0.40 +48.96
v = 0.20 m/s v = 0.20 m/s BANGUNAN SADAP BMD 4 (KW 79A) HM 66+57 District : NGANJUK
+49.87
+49.93
+49.05
+49.87 +49.87
+48.97
SAL. SKUNDER KIRI
3.70 SAL. SKUNDER KIRI
3.50
Ruas 5 Ruas 5
0.20
A A A A
+49.45
+49.37
A 1509.00 Ha A 1509.00 Ha
0.05 0.05
2234 m3/dt 2234 m3/dt
2.50
2.50
+49.05 +49.03
+48.97 2.50 +48.95
V 0.747 m/dt V 0.747 m/dt
0.10 0.10
b 6.00 m b 6.00 m
±0.00
h 0.60 m h 0.60 m
1.50
+49.95
+49.87
i 0.000320 i 0.000320
+49.87 2.00 +49.87
k 65 k 65
+46.19
+49.95 +49.93 m 1 m 1
0.30 TERTIMBUN +50.87
n 10 n 10
B w 0.60 m
3.60 5.20 1.20
w 0.60 m
0.30 0.30 B 0.30
DENAH S, A
PLAN
3.50
0.20 0.20 0.30
2.50 4.20 5.20 1.20
+46.99 +46.99
POTONGAN A - A S, A
SECTION
POTONGAN A - A S, A
SECTION
2.50
+50.87 +50.87
+49.95 +49.95
+49.24
+49.45 +49.45 +49.19
+49.05 +49.87
TERTIMBUN
2.50
+49.37
+48.97
POTONGAN B - B S, B 1.50
SECTION
0.30
4 2 0 2 4 6 8 10 M
POTONGAN B - B S, B SKALA. A / SCALE. A
SECTION
2 1 0 1 2 3 4 5M
Concrete K - 100 JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 5b HM 67+88 Province : EAST JAVA
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Approved by : Asmelitas, ST., SP 1.
Saluran Tersier a.75
a.75 Tertiary Canal
0.30
C
L
Q = 0.098 m3/s +49.71 +49.71
b = 0.50 m +49.41 1 1
1 +49.17 1
+49.5 h = 0.48 m
2
v = 0.21 m/s +48.61 +48.61
n = 0.030
+48.1
1 t =1:1
+49.5 1.25 1.50
2
s = 0.00025
+4 F POTONGAN D - D / SECTION. D - D
Pintu No.2 9.5 f = 0.32 m
Gate +48.5
2 2 +49.5
2 Skala . B / Scale . B
.76
+49
+49.71 C
+49.71
+48.61
2 +48.08
+49.76
+49.76
+48.61
+48.61 2.50 4.00 +48.10 2.20 F +49.3
1 +47.90
+47.9
0 Saluran Sekunder B.4 (Hilir)
C B.4 Secondary Canal (D/S)
+49.4 1.25 1.25
5
Pintu No.1
Q = 0.849 m3/s
POTONGAN E - E / SECTION. E - E
+49.71
Gate
+49.71 +49.71 b = 1.50 m
Skala . B / Scale . B
6
+48.0
9.7
8 +49.4 h = 0.66 m
D 5
+4
+48.0 +48.92 C
8 L
+49.4 1.50 v = 0.60 m/s
5 +49.52 +49.52
Saluran Sekunder B.4 (Hulu) +48.0
8 n = 0.025 1
B.4 Secondary Canal (U/S) +49.13 1
t =1:1 +48.99
A
Q = 0.929 m3/s
DENAH/PLAN E +48.0
8
Skala . A / Scale . A +49.4
5
s = 0.00070 +48.52
+48.39
b = 2.50 m f = 0.54 m
+49.45
h = 0.56 m
+48.1 0.30 0.30
4
v = 0.55 m/s +49.4
5
G JALA
n = 0.025 +48.7 INSP N INSPE Saluran Tersier a.76
POTONGAN F - F / SECTION. F - F
ECTI K
0 +49.4
5 ON R SI a.76 Tertiary Canal
Skala . B / Scale . B
t =1:1 OAD
+48.7 C
s = 0.00006 +49.45 0 Q = 0.057 m3/s +49.00 L
+49.3 +49.45 +49.45
f = 0.54 m 0.60 5 b = 0.40 m 1
+48.6
0 +49.15 1
+49.05
+49.7
0 C h = 0.35 m
+48.70
v = 0.21 m/s +48.60
+49.4
5
+49. n = 0.030
G 35
t =1:1 0.30 0.30
Pintu
No.1
Gate s = 0.00038 POTONGAN G - G / SECTION. G - G
f = 0.30 m Skala . B / Scale . B
0.40 0.40
Ø 10 - 200
+49.71 +49.76 0.20 0.20
+49.45 +49.45 +49.45 +49.45
+49.17 +49.31 0.15
+49.28
+48.61 +48.74 +48.74 +48.74 +48.74
0.15
+48.10 +48.10 +48.08 +48.08 +48.08 Ø 12 - 200
+47.90 +47.90 1:10
2.20
5.00
Pintu / Gate
+49.71 +49.76 +48.92 No Bangunan Stasion Keterangan
+49.52 +49.52 +49.52 +49.31 Strcture Station No. Type w (cm) h (cm) H (cm) H' (cm) Remarks
+49.17 +49.31
+49.13 +49.13 +48.99
+48.52 +48.52 1:5 +48.51 KW. 79 7 + 212 1 II 100 125 250 166 Baru / New
Ø 0.50 1:5 +48.39
+48.10 +48.15 +48.11
2 I 50 125 250 166 Diganti / Replaced
0.50
9.00 4.00 2.00 20.00 1.00 1.40 2.00 3 I 50 125 250 166
TABEL AlAT UKUR DREMPEL
TABLE OF BROAD CRESTED WEIR
POTONGAN B - B / SECTION B - B
Skala . A / Scale . A Debit Alat Ukur Drempel
Saluran Disharge Broad Crested Weir Keterangan
Pintu
NO.3 Canal Q Lebar/Width Tinggi/Head Tebal/Length Remarks
Gate m 3/s (m) (m) (m)
4 2 0 2 4 6 8 10 M
+49.00
a.75 0.098 0.60 0.21 0.50 Rehab SKALA. A / SCALE. A
+49.71 +49.76 0.8 0.4 0 0.4 0.8 1.2 1.6 2M
+49.31 +49.45 +49.45 +49.35 a.76 0.057 0.60 0.15 0.40
+49.17 +49.15 +49.15 +49.05
+48.70 +48.70 +48.70 SKALA. B / SCALE. B
+48.60 1:5
POTONGAN C - C / SECTION C - C BANGUNAN SADAP & JEMBATAN BMD 5 (KW79) HM 72+60 District : NGANJUK
Skala . A / Scale . A
Province : EAST JAVA
+48.80
+48.80
1.0
SAL. SKUNDER KIRI
+48.80 +48.80
1.0
Ruas 6
1.50
A A A 1509.00 Ha
+48.30
0.20
2234 m3/dt
0.10
1.80
+47.90
V 0.747 m/dt
0.05 +47.90 +47.89
b 6.00 m
h 0.60 m
PLAN B
1.0
+48.80
S, A i 0.000320
+49.03
1.0
+48.80 +48.80
DENAH +49.02
SAL. SKUNDER KIRI k 65
+48.13
+49.03 Ruas 6 m 1
+48.53
A 1509.00 Ha n 10
0.20 A A 2234 m3/dt B w 0.60 m
0.05
1.80
V 0.747 m/dt
0.10 +48.13 +48.12
b 6.00 m DENAH S, A
h 0.60 m PLAN
1.50
+49.03
i 0.000320
+4903
k 65
+49.02
TERTIMBUN +48.89 m 1
+44.89 +44.89
POTONGAN A - A S, A
SECTION
0.20 0.20 0.30
4.20 5.20 1.20
+46.99 +46.99
+44.89 +44.89
POTONGAN A - A S, A
SECTION
+46.24
+46.19
+46.00
+45.89 TERTIMBUN
+45.39
0.30
+46.24
+46.19
+46.00
POTONGAN B - B S, B
TERTIMBUN
+45.39
+45.89 SECTION
+44.89
4 2 0 2 4 6 8 10 M
1.50 3.00
SKALA. A / SCALE. A
0.30
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 6a HM 75+32 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 6b HM 79+85 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 592/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 18
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+48.06
Ruas 6 ±0.00 +54.73 ±0.00 SAL. SKUNDER KIRI
Ruas 6
JALAN INSPEKSI JALAN INSPEKSI A 1509.00 Ha -0.50 3.50
+47.16
A 1509.00
B 2234 m3/dt
Ha
A A 2234 m3/dt
+48.24
0.20 -0.90
+47.56
+48.24 V 0.747 m/dt
V 0.747 m/dt
+4
+48.24 b 6.00 m 0.05
6.
4.50
53.53
1.80
+48.60 4.00 -0.90 53.47 -0.90 6.00 m
99
b
h 0.60 m
A A
+47.74
0.20
0.10 0.10 ±0.00 h 0.60 m
i 0.000320
0.05 -0.50 i 0.000320
5.00
k 65
1.80
1.80 k 65
+48.06
+47.34 +47.32 m 1
-0.50 m 1
n 10
±0.00 54.49 +54.53 ±0.00
+47.34
n 10
1.50 w 0.60 m
+48.24
w 0.60 m
+48.24
2.00 +48.24 B
JALAN DESA
+48.24 TERTIMBUN 0.30
1.20 5.20 3.60
3.50
0.30 0.30
0.30 0.20 0.20 +48.86 +48.86
1.20 5.20 4.20
+46.99 +46.99
POTONGAN A - A POTONGAN A - A
SECTION SECTION
+46.24
+46.19
+46.00
+45.89 TERTIMBUN
+45.39
+48.06 +48.06
+47.56
+44.89 +47.16
3.00 1.50
0.30 POTONGAN B - B S, B
SECTION
POTONGAN B - B S, B
4 2 0 2 4 6 8 10 M
SECTION SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 6c HM 82+72 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 6d HM 84+92 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 593/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 20
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
B
+48.06
+48.06
+48.06
3.50 SAL. SKUNDER KIRI
+47.16
Ruas 6
A -0.90 A A 1509.00 Ha
+47.56
0.20
0.05 2234 m3/dt
4.50
+47.16
1.80
+47.16
V 0.747 m/dt
0.10 ±0.00
b 6.00 m
-0.50 h 0.60 m
+48.06
i 0.000320
k 65
+48.06 +48.06
m 1
B n 10
w 0.60 m
JALAN INSPEKSI
3.50
0.30 0.30
+0.80 +0.80
± 0.00
+48.06 +48.06
+47.56 +47.56
+47.16 +47.16
0.10
+48.06 +48.06
+47.56 +47.56
+47.16
4.50
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 6e HM 85+90 District : NGANJUK
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 594/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 22
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
+ 47.46 + 47.36
Saluran Sekunder B.4 (Hulu)
Secondary Canal B.4 (U/S) + 46.90
+ 46.80
Saluran Tersier ai.75
Q = 0.849 m3/s aI.75 Tertiary Canal
b = 1.50 m D 0.40 0.25
h = 0.66 m Q = 0.082 m3/s
v = 0.60 m/s 2.96 B b = 0.45 m
POTONGAN D - D / SECTION D - D
n = 0.025 h = 0.41 m Skala . B / Scale . B
+ 47.70 v = 0.24 m/s
t = 1:1 +46.90 0.50 +46.80 + 46.95
s = 0.00070 + 47.70 n = 0.030
Fb = 0.54 m t = 1:1
s = 0.00038
Fb = 0.34 m
Pintu D
No.1
Gate
+ 48.13
C
+ 46.90
+ 46.80
n = 0.025
0.80
t = 1:1
+ 48.13
s = 0.00070
JALAN INSPEKSI 3.00m Fb = 0.48 m 0.40 0.25
+46.57 Ø0.60-0.50m (Ganti baru) INSPECTION ROAD 3.00m WIDTH
No.2
Pintu (To be replaced) E POTONGAN E - E / SECTION E - E
Gate Skala . B / Scale . B
+47.66
C
Saluran Tersier ai.76
aI.76 Tertiary Canal
+46.90 0.50 +46.80 +46.96
Q = 0.078 m3/s
b = 0.45 m
+47.66
h = 0.40 m
DENAH / PLAN E v = 0.23 m/s
Skala. A / Scale. A n = 0.030
Pintu
No.1 t = 1:1
Gate
s = 0.00038
Fb = 0.30 m
+48.13 +48.13 + 48.13
+47.59 + 47.55
+46.93 +47.02 + 46.93
+47.25
+48.13 +48.13
+47.89 +47.89
+47.59 + 47.70
+47.46 +47.46 + 47.36
+47.02 +47.07 +46.90 +46.90 + 46.95
+ 46.80 1:5
+47.94 +47.94
+47.59
+47.45 +47.45 +47.36
+47.66 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
+ 47.02 +46.90 +46.90 1:5 +46.96 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
+46.80
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
5.00 16.95 1.00 1.50 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
+47.57
+47.57 +47.57 A 1509.00 Ha
+46.67
JALAN LINGKUNGAN +45.13 2234 m3/dt
B
+47.07
0.30
1.20 5.20
0.30
3.60
0.30
JALAN INSPEKSI A A V 0.747 m/dt
0.10 b 6.00 m
+48.44 TERTIMBUN
1.80
+46.67 +46.66
+47.72
4.20 h 0.60 m
+47.19 0.05
+47.36 0.30 +47.72 i 0.000320
+46.82
00
1.50 0.20 k 65
2.
+47.22
A A
+47.57
0.20 +44.56 m 1
0.05 +47.57 n 10
+47.57
1.80
JALAN DESA
B
99
+47.72
6.
+47.72
+4
+47.72
JALAN ASPAL
JALAN INSPEKSI JALAN INSPEKSI
V 0.747 m/dt
b 6.00 m
h 0.60 m
i 0.000320
k 65
0.20 0.20
m 1
4.00
n 10
w 0.60 m +47.76 +47.76
POTONGAN A - A POTONGAN A - A S, B
SECTION
S, A SECTION
+44.89
3.50
1.50 3.00
0.30
POTONGAN B - B S, B
POTONGAN B - B SECTION 4 2 0 2 4 6 8 10 M
S, B
SECTION SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 7a HM 88+88 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 7b HM 90+56 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 596/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 23
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A = 1509.00 Ha
B = 2234 m3/dt
+47.39
2.00
+47.39 +47.39 V = 0.747 m/dt
+46.49
b = 6.00 m
0.05 i = 0.000320
1.80
+46.49 4.80 +44.96 +46.49 k = 65
0.10 m = 1
0.20
A A n = 10
+47.39
2.00 te w = 0.60 m
Ga intu
P +47.39
+47.39 0.50
1.00
B
7.00 4.00 1.00
0.20 0.20
Jalan Beraspal
0.80 Pintu
Gate 0.20 0.20
7.00 4.00
+48.00
+47.40
+47.39 +47.39
+46.89 0.30 +46.89
+46.49 +46.49
Beton tumbuk K-225,t = 10 cm
Lantai Kerja Beton K-100,t = 5 cm
LEGEND
POTONGAN A - A S, A K-225 Beton Tumbuk K - 225
SECTION A - A Concrete K - 225
SECTION B - B
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
BANGUNAN SADAP, JEMBATAN & TMH BMD 7c ( KWB81A) HM 93+04 District : NGANJUK
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 597/1029
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm VIRAMA in joint venture with:
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 04 - 11 - 07
Korean Rural Community Corporation
3. Dipasang Papan nama bangunan / Nomenklatur baru PT. Wiratman
PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A 1509.00 Ha
2234 m3/dt
B V 0.747 m/dt B
b 6.00 m
+47.27 +46.91
+47.27
+46.91
+47.25 +46.91
h 0.60 m
+46.01
i 0.000320
3.50
+46.37
3.50
A A A A
+46.41
k 65
+46.77
m 1
0.10 0.05
4.50
+46.01
1.80
1.80
n 10 +46.01
+46.37 +46.35
w 0.60 m 0.10
0.05
0.20 0.20
±0.00 2.05
+47.27
+46.91
+47.27 +47.25 +46.91 +46.91
B 0.30 B
3.50
0.30 0.30
+0.80 +0.80
3.50
+48.07 +48.07
+47.77 +47.77 +46.91 +46.91
POTONGAN A - A S, A
SECTION
+47.41 +47.41
+46.91 +46.91
+46.41
+46.41
+46.01
± 0.00 +47.27
1.80
-0.50 +46.77
+46.37 -1.20 4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 7d HM 94+58 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 7e HM 99+47 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 598/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 25
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A = 1509.00 Ha
= 2234 m3/dt
V = 0.747 m/dt
b = 6.00 m
h = 0.60 m
i = 0.000320
k = 65
m = 1
n = 10
w = 0.60 m
+46.24
+44.86 +44.86
2.00
+45.34
+45.74
Jalan Beraspal Jalan Beraspal 0.20
0.10
1.80
+45.34
0.05
0.20 0.20
7.00 +44.96 +45.35
+46.68
1.00 4.00 7.00
+46.68 A A
B
+46.24
2.00
+46.68
+45.78
+44.86
2.00
B +44.86
A A 7.00 4.00 1.00
+46.18
0.20
0.20 0.20
0.10
1.80
DENAH S, A
+46.68
2.00
+46.68 PLANE
B
A = 1509.00 Ha
DENAH S, A
= 2234 m3/dt
b = 6.00 m
h = 0.60 m
i = 0.000320
k = 65
m = 1
n = 10
w = 0.60 m
0.20 0.20
7.00 4.00
7.00
+47.66
+46.24 +46.24
7.00
+45.66
+45.36 +45.74
4 2 0 2 4 6 8 10 M
+44.86 +44.86
4.00
SKALA. A / SCALE. A
+43.66 +44.26
2 1 0 1 2 3 4 5M
4.00
POTONGAN B - B
SKALA. B / SCALE. B
LEGENDA SECTION B - B KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
LEGEND DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
POTONGAN B - B K-225 Beton Tumbuk K - 225
DIREKTORAT IRIGASI DAN RAWA
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Irrigation System In East Java
K-100 Beton K - 100 JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 7f HM 102+24 District : NGANJUK
Concrete K - 100 JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 7g HM 108+09 Province : EAST JAVA
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Approved by : Asmelitas, ST., SP 1.
Saluran Sekunder B.4(Hulu)
A
B.4 Secondary Canal ( U/S )
Q = 0.768 m3/s
b = 1.50 m
+46.06
h = 0.62 m
+46.16
+46.16
v = 0.58 m/s
n = 0.025
t =1:1
s = 0.0007
f = 0.48 m
Jalan Desa Untuk Penjelasan Jembatan Lihat Gambar Standard No. RI - B0422
+46.56
Vilage Road For Bridge Detail See Standard Drawing No. RI - B0422 Saluran Tersier a.77
a.77 Tertiary Canal
Q = 0.107 m3/s
b = 0.50 m
h = 0.49 m
v = 0.22 m/s
G n = 0.030
Pintu
No.5
Gate t =1:1
+45.85
s = 0.00026
+46.16
+45.85 +45.85
+46
+45.11 .02 f = 0.31 m
0.40
+44.80
F
+46.02
+46.02
+44.26 +44.16 0.80 +44.55 +44.55 +44.37 0.60 +46.85
+45.85
D +45.65 C
D 0.40 B
+45.11
Pintu C
+44.80
No.3 Ø 0.60 L.1200 +44.70
Gate 0.60 +44.65 +44.80 0.60 +45.85
+45.85
+45.85 G Pintu
No.4
+44.80
+44.70
Gate
+46.16
Saluran Tersier a.78
Pintu
a.78 Tertiary Canal No.2
Gate
+45.85
+45.85
Q = 0.173 m3/s
Pintu
No.1
F
b = 0.65 m Gate DENAH / PLAN
h = 0.59 m Skala. A / Scale. A
v = 0.24 m/s
+46.16
n = 0.030
+44.70
t =1:1
s = 0.00023
Saluran Sekunder B.4 (Hilir)
f = 0.31 m B.4 Secondary Canal (D/S)
Q = 0.460 m3/s
+44.80 b = 1.50 m
h = 0.57 m
v = 0.39 m/s
+45.99
+44.99
+45.99
n = 0.027
t =1:1
0.70 A s = 0.0004
f = 0.43 m
E
Saluran Tersier a.79
+45.85
+44.55
+45.85
Q = 0.154 m3/s
E
b = 0.60 m
h = 0.60 m
v = 0.22 m/s
+45.60
+44.70
n = 0.030
+45.60
4 2 0 2 4 6 8 10 M
t =1:1 SKALA. A / SCALE. A
s = 0.0002 2 1 0 1 2 3 4 5M
BANGUNAN SADAP & JEMBATAN BMD 7 (KW 82) HM 111+14 District : NGANJUK
+46.56
+46.16 +46.16 +45.16
+45.99 0.30 +45.22
+45.66 +46.66 C
L
+45.48 +45.85 +45.85
+45.06 +45.06 +48.00 +44.99 1 1
+44.70 +44.80 +44.70 +45.45 1 1
+45.30
0.40 +44.80
+44.55
4.85 4.60 8.35 3.00 1.00 5.00
POTONGAN A - A / SECTION A - A
0.40 0.40
Skala . A / Scale . A
+46.22
+46.02 +45.85 +45.85
+45.56 +45.45 +45.60
+48.30
+44.80 +44.80 +44.70
+44.55
+44.37
+46.16
H +46.20
+45.23
+45.85 +45.85
+45.55 +45.65
Ø 0.60 +45.45 +45.34
+44.70 +44.80 +44.80 +44.70 +44.85
+44.65
TABEL AlAT UKUR DREMPEL
H TABLE OF BROAD CRESTED WEIR
12.00 3.00 6.50 1.00 2.00 1.50 Debit Alat Ukur Drempel
Saluran Disharge Broad Crested Weir
Keterangan
0.50
POTONGAN C - C / SECTION C - C Canal Q Lebar/Width Tinggi/Head Tebal/Length Remarks
Skala . A / Scale . A m 3/s (m) (m) (m)
0.40
POTONGAN D - D / SECTION D - D
Skala . A / Scale . A
+45.25 C
L 0.30
+46.20 C
L 0.30
+45.85 +45.65
1 +45.85 +45.65
1 1
+45.45 1 1
+45.30 1 +45.45 1
1
4 2 0 2 4 6 8 10 M
+44.80 SKALA. A / SCALE. A
+44.70 +44.85
2 1 0 1 2 3 4 5M
+44.55
SKALA. B / SCALE. B
0.30 0.30 +44.16
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
POT. F-F / SEC. F-F DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
Skala . B / Scale . B 0.40 0.40 DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
BANGUNAN SADAP & JEMBATAN BMD 7 (KW 82) HM 111+14 District : NGANJUK
POT. G-G / SEC. G-G
Province : EAST JAVA
Skala . B / Scale . B
Prepared by Fahim Anshori, S.T. No. of Sheet : 600/1029
PT. VIRAMA KARYA (Persero)
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Korean Rural Community Corporation Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 04 - 11 - 08
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A = 1509.00 Ha
= 2234 m3/dt
V = 0.747 m/dt
b = 6.00 m
h = 0.60 m
i = 0.000320
B k = 65
+46.68 B +46.68
+45.37 +45.37 m = 1
+46.68
+45.37
2.00 n
+45.78
= 10
w = 0.60 m
+44.57
A
+44.97
A A A
+46.18
0.20 0.05
1.50
1.80
0.10
+45.78 +44.96 4.80 +45.77 0.10 +44.57 ±0.00 +44.57
0.05
0.20
2.05
+45.37
+46.68
2.00
+45.37 +45.37
2.30
SAL. SKUNDER KIRI
Ruas 8
A = 1509.00 Ha
= 2234 m3/dt +46.17 +46.17
V = 0.747 m/dt +45.87 +45.87
b = 6.00 m
+45.37 +45.37 +45.37
h = 0.60 m
+44.97 +44.97
i = 0.000320
+44.57 +44.57
k = 65
m = 1
n = 10 POTONGAN A - A S, A
w = 0.60 m
SECTION
0.20 0.20
4.00 7.00
+45.66
53.30 -1.20
2.50
5.80
+47.18
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 8a HM 115+22 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 8b HM 118+18 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 602/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 29
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A = 1509.00 Ha
= 2234 m3/dt
V = 0.747 m/dt
b = 6.00 m
h = 0.60 m
i = 0.000320
B k = 65
+45.37
2.00 n
+45.78
= 10
-0.50 -0.50
+44.57
w = 0.60 m
A
+44.97
A A A
+46.18
0.20
0.20
0.05 0.10
1.50
1.80
2.05
+45.37
-0.50 -0.50
+46.68
2.00
±0.00 +45.37 +45.37 ±0.00
2.30
SAL. SKUNDER KIRI
Ruas 8
0.30 1.70 0.30
A = 1509.00 Ha
+46.02 +46.02
= 2234 m3/dt
0.747
+45.77 +45.77
V = m/dt
b = 6.00 m
+45.37 +45.37
h = 0.60 m
+44.97 +44.97
i = 0.000320
+44.57 +44.57
k = 65
m = 1
n = 10 POTONGAN A - A S, A
w = 0.60 m
SECTION
0.20 0.20
4.00 7.00
+47.08
SECTION A - A
+44.97
1.50
3.80
+47.08
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN DAN TMH (TEMPAT MANDI HEWAN) BMD 8c HM 119+74 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 8d HM 121+86 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 603/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 31
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A 1509.00 Ha A 1509.00 Ha
2234 m3/dt 2234 m3/dt
b 6.00 m b 6.00 m
h 0.60 m h 0.60 m
i 0.000320 i 0.000320
B k 65 B k 65
+45.09 m 1 +45.03 m 1
+45.08 +45.02 ±0.00
+45.03
+45.09
n 10 n 10
-0.50
+44.29
w 0.60 m w 0.60 m
+44.23
A A
+44.63
A A
+44.69
0.05 0.10
1.50
1.50
+45.03
+45.09
-0.50
+45.09 +45.08 +45.03 +45.02 ±0.00
B 0.30 B 0.30
2.30 2.30
POTONGAN A - A S, A
POTONGAN A - A S, A
SECTION SECTION
+45.23 +45.23
+45.23 +45.23
+45.09
+45.03 +45.03
+44.63 +44.63
+44.69
+44.29 +44.23
1.50 1.50
POTONGAN B - B POTONGAN B - B 4 2 0 2 4 6 8 10 M
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 8e HM 122+80 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 8f HM 123+99 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 604/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 33
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A 1509.00 Ha A 1509.00 Ha
2234 m3/dt 2234 m3/dt
b 6.00 m b 6.00 m
h 0.60 m h 0.60 m
i 0.000320 i 0.000320
B k 65 B k 65
+44.97 m 1 +44.91 m 1
+44.98 +44.91
+44.97
+44.91
n 10 n 10
w 0.60 m w 0.60 m
+44.17
+44.11
A A
+44.57
+44.51
A 2.80
A
0.10 0.10
1.50
1.50
+44.17 ±0.00 +44.16 +44.11 +44.91 +44.10
0.05 0.05
2.05 2.05
+44.97
+44.91
+44.97 +44.98 +44.91 +44.91
B 0.30 B 0.30
3.00
2.80
POTONGAN A - A S, A
POTONGAN A - A S, A
SECTION SECTION
+45.41
+45.26
+44.91
+44.97 +44.97
+44.51
+44.11
+44.57 +44.57
+44.17
1.50
1.50
POTONGAN B - B
SECTION B - B
POTONGAN B - B 4 2 0 2 4 6 8 10 M
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 8g HM 125+22 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send JEMBATAN BMD 8h HM 125+95 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 605/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 35
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
A 1509.00 Ha
2234 m3/dt
V 0.747 m/dt
b 6.00 m
h 0.60 m
i 0.000320
B k 65
+44.82 m 1
±0.00 +44.80 ±0.00
+44.82
n 10
-0.50 -0.50
w 0.60 m
+44.02
A
+44.42
2.80
A
0.10
1.50
-0.90 +44.02 ±0.00 +44.01 -0.90
0.05
0.20
2.05
+44.82
-0.50 -0.50
±0.00 +44.82 +44.80 ±0.00
B 0.30
2.80
0.30 0.30
+45.57 +45.57
+45.37 +45.37
POTONGAN A - A S, A
SECTION
+45.57 +45.57
+45.37 +45.37
+44.82 +44.82 LEGENDA
LEGEND
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
SKALA. B / SCALE. B
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 606/1029
Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm VIRAMA in joint venture with:
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 37
Korean Rural Community Corporation
3. Dipasang Papan nama bangunan / Nomenklatur baru PT. Wiratman
PT. Tuah Agung Anugrah
PT. Terasis Erojaya
Team Leader Yoo, Kang-Keun DATE NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
Q = 0.460 m3/s
b = 1.50 m
h = 0.57 m
v = 0.39 m/s
n = 0.027
t =1:1
s = 0.00040
+45.10
f = 0.43 m
A
Pintu
Gate
No.3 +44.72 +44.72 E
+43.67 +44.53
+44.10 +43.67
C C
B
1.00
0.60 +43.62 +43.62 +43.53 +43.63
+45.10
D +45.10
0.60
0.60
+45.10 No.2 Pintu
Gate
B +44.53
+43.37
Pintu
+44.67 Gate
No.2 E
+43.64 +43.54 +43.62 0.80
+43.62
+44.67
Saluran Tersier a.80
+45.05
+43.51
Saluran Sekunder B.4 (Hilir)
a.80 Tertiary Canal
B.4 Secondary Canal(D/S)
D Q = 0.148 m3/s
Saluran Tersier a.81 Q = 0.263 m3/s
a.81 Tertiary Canal b = 0.60 m
b = 1.00 m
h = 0.57 m
Q = 0.149 m3/s h = 0.51 m
+44.41
+43.51
v = 0.22 m/s
b = 0.60 m v = 0.34 m/s
n = 0.030
h = 0.58 m DENAH / PLAN n = 0.027
Skala. A / Scale. A t =1:1
v = 0.22 m/s t =1:1
n = 0.030
A s = 0.00040
s = 0.00022
f = 0.33 m
t =1:1 f = 0.39 m
s = 0.00021
f = 0.32 m Pintu
No.2 Pintu
Gate No.3
Gate
+44.14
+45.10 +45.10 +45.10 +44.10
+44.67 +44.67 +44.67 +44.67 +44.72 +44.72
+44.54 +44.37 +44.37 Ø 0.60 +44.53
+44.22 +44.38 +44.20
+43.83 +43.83
+43.64 +43.54 +43.62 +43.62 +43.67 +43.67 +44.62 +44.62 +43.53 +43.63
1.30 0.60
3.60 10.70 5.00 4.00 4.00 5.00 12.60 2.10 2.00
Pintu
Pintu No.1 TABEL PINTU / TABLE GATE
No.3 Gate
Gate
SKALA. B / SCALE. B
0.40 0.40 0.30 0.30 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
POTONGAN E-E / SECTION. E-E Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Skala . B / Scale . B
POTONGAN D-D / SECTION. D-D Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
Skala . B / Scale . B BANGUNAN SADAP BMD 8 (KW 84) HM 128+06 District : NGANJUK
+44.07
SAL. SKUNDER KIRI SAL. SKUNDER KIRI
+43.27
Ruas 9 Ruas 9
+43.67
A = 1509.00 Ha A = 1509.00 Ha
= 2234 m3/dt 0.10 = 2234 m3/dt
1.50
+43.27 +43.25
V = 0.747 m/dt 0.05 V = 0.747 m/dt
0.80
b = 6.00 m 0.20 b = 6.00 m
A A
+44.07
h = 0.60 m h = 0.60 m
i = 0.000320 i = 0.000320
Gate
B k = 65 0.50
Pintu
No.1 k = 65
m = 1
1.00 m = 1
±0.00 +44.82 +44.80 ±0.00 3.00
+44.28
n = 10 n = 10
-0.50 -0.50
w = 0.60 m w = 0.60 m
+43.48
A
+43.88
2.80
A
0.30
0.10
1.50
+39.48
0.20
2.05 4.00 Jalan Beraspal Jalan Beraspal
+44.28
-0.50 -0.50
±0.00 +44.82 +44.80 ±0.00
0.00
B 0.30
DENAH S, A
B PLANE
2.80
0.30 0.30
+44.98 +44.98
0.80 Pintu
+44.78 +44.78 No.1
Gate
POTONGAN A - A S, A
SECTION A - A
+44.98
+44.78 Pintu
No.1
+44.28 Gate
0.30 0.30
POTONGAN B - B
SECTION B - B
POTONGAN B - B S, A
SECTION B - B
4 2 0 2 4 6 8 10 M
SKALA. A / SCALE. A
2 1 0 1 2 3 4 5M
K-225 Beton Tumbuk K - 225 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
Concrete K - 225 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
K-100 Beton K - 100 Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Concrete K - 100 Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
1:4 Pasangan Batu Kali 1PC : 4Ps JEMBATAN BMD 9a HM 132+94 District : NGANJUK
USULAN PEKERJAAN : Stone Masonry 1PC : 4send PELIMPAH SAMPING BMD 9b HM 136+65 Province : EAST JAVA
1. Bangunan masih baik dipertahankan PT. VIRAMA KARYA (Persero) Prepared by Fahim Anshori, S.T. No. of Sheet : 608/1029
2. Lantai bangunan dilapisi beton tumbuk K-225 setebal 10 cm Permukaan tanah Jl. Hang Tuah Raya No.26, Kebayoran Baru Jakarta Selatan 12120 Indonesia
in joint venture with:
VIRAMA
Checked by Dr. Ir. Syamsuddin Mansoer Register : 1 - 10 - 11 - 38
3. Dipasang Papan nama bangunan / Nomenklatur baru Ground Surface Korean Rural Community Corporation
PT. Wiratman
PT. Tuah Agung Anugrah Team Leader Yoo, Kang-Keun DATE
PT. Terasis Erojaya NO. KONTRAK
31/5/21 KU.02.10/Ai/III/12
No. Date Revised Drawn Checked Approv. Acknowledge by : Devi Sri Maulana, S.T., M.T.
43.4
Ruas 4
A A
43.
A = 1509.00 Ha
0.10 Q = 2234 m3/dt
1.50
H ARU 6.50m 0.747
0.05 V = m/dt
0.20 b = 6.00 m
0.20 h = 0.60 m
44.2
i = 0.000320
k = 65
1. 9
m = 1
1.10 n = 10
w = 0.60 m
0.30
2.97 2.00
4.97
DENAH S.
LAN
H ba u
44.2
43.
43.4
6.50
N AN A A S
SE I N
LE ENDA
LE END
K 225 t n st K 225
st n t K 225
1 4 asan an atu Ka i 1 4 s
0.30 St n as n 1 4s nd
1.10 0.20
44.2 44.2
mukaan tanah
44.2
und Su a
43.
43.6
43.4
1. 9 1.00
0.20 4 2 0 2 4 6 10
SKALA. A / S ALE. A
2 1 0 1 2 3 4 5
N AN S
SKALA. / S ALE.
SE I N
KE EN ERIAN EKER AAN U U DAN ERU AHAN RAK A t a ati n nsu tant
DIREK RA ENDERAL SU ER DA A AIR im D m nt th i an
DIREK RA IRI ASI DAN RA A I i ati n S st m In East a a
. attimu a 20 K ba an a u / a . 021 722 497 aka ta S atan 12110
A db Asm itas S . S 1.
Saluran Tersier a.82 C
+43.14 C a.82 Tertiary Canal
0.30 L
TABEL AlAT UKUR DREMPEL
+43.72 TABLE OF BROAD CRESTED WEIR
+43.60 Q = 0.074 m3/s
+43.43
+42.73
+43.43
+43.34 Debit Alat Ukur Drempel
+43.23 b = 0.40 m
No.2 Pintu Pintu No.1 Pintu
NO.5 Saluran Disharge Broad Crested WeirKeterangan
h = 0.40 m Gate Gate Gate
Canal Q Lebar/Width Tinggi/Head Tebal/Length Remarks
+42.62
+42.52 v = 0.23 m/s 0.40 m 3/s (m) (m) (m)
+42.82
+42.72 a.82 0.074 0.50 0.20 0.40 Rehab
n = 0.030 +43.87 +43.82 +43.82 +43.00
+43.48 +43.61 +43.61
t =1:1 +43.43 +43.26 +43.26 +43.34
0.30 0.30 +42.97 Ø 0.60 +43.04 aI.82 0.074 0.50 0.20 0.40
s = 0.00038 I +42.52
+43.61
+43.61
+42.42 +42.42 +42.44
+42.41
+42.42
+42.16 a.83 0.182 0.80 0.26 0.40
POTONGAN H-H / SECTION. H-H f = 0.30 m
Skala . B / Scale . B a.84 0.067 0.50 0.18 0.40
0.20 0.50
0.80
2.00 3.00 5.80 2.00 -
1.75 2.00
0.40
I 0.50 POTONGAN A - A / SECTION A - A TABEL AlAT UKUR DREMPEL
Skala . A / Scale . A TABLE OF BROAD CRESTED WEIR
0.30 +43.06 C
L Debit Alat Ukur Drempel
+42.51
+43.61 +43.61 Pintu Pintu Saluran Disharge Broad Crested Weir Keterangan
NO.5 NO.6
Gate Gate Remarks
Canal
+43.61
Q Lebar/Width Tinggi/Head Tebal/Length
+43.26
+43.13 0.70 m 3/s (m) (m) (m)
0.30 +43.03 a.83 0.182 0.80 0.71 0.40 Baru/New
+42.61 +43.82
+42.51 +43.51 +43.51
+43.43 0.40 +43.21 +43.21 +45.18 a.83 0.074 0.65 0.70 0.50
+42.72 +42.87
+42.42 +42.52 +42.52 +42.48
+42.27
0.35 0.35 +42.06
2.50
0.80
POTONGAN I-I / SECTION. I-I 2.50 2.50 15.00 1.30 2.00
Skala . B / Scale . B
POTONGAN B - B / SECTION B - B
Skala . A / Scale . A
A Pintu / Gate
No Bangunan Stasion Keterangan
+43.61
+43.61
Strcture Station No. Type w (cm) h (cm) H (cm) H' (cm) Remarks
H
D 4
KW. 86 13 + 985 1 I 60 115 230 135 Diganti / Replaced
+43.60 +43.72 +43.72
Pintu 3.3
+4 2.4
4
Gate No.3
+42.61
+4 2 I 45 85 185 105
+43.53 C F
0.65
4 3 I 45 80 170 90
2.1
6 3.3
+42.83 +42.52 0.50 +42.62 +42.62
+4 +4
.61 .61 4 I 65 80 170 90 Baru / New
+42.72 0.45 Pintu 43
No.5 43 +
E Gate +
+43.72
E B +42.61 0.80 5 I 80 90 190 110
+43.72 +43.72 +43.82
+43.82 2 .42 F
Pintu +4 6 I 40 90 150 110
H No.4
Gate
Pintu No.2
+42.42
Saluran Tersier a.83
Saluran Tersier a.82 Gate a.83 Tertiary Canal
a.82 Tertiary Canal +42.42 1
+43.67 4 3.6
0.80 + Q = 0.182 m3/s
Q = 0.074 m3/s A 0.40
0.45 b = 0.60 m
b = 0.40 m 0.60
+42.97 +42.52 Pintu h = 0.60 m
No.1 +42.61
h = 0.40 m D Gate Pintu No.6 Pintu No.2
Pintu
Gate v = 0.25 m/s Gate No.4
Gate
v = 0.23 m/s
DENAH / PLAN n = 0.030
n = 0.030 Skala. A / Scale. A +43.42
t =1:1 +43.87
t =1:1 +43.72 +43.72
+42.27
+43.48
s = 0.00027
+43.51
+43.51
t =1:1
n = 0.030
+42.06
s = 0.00040 +42.06
t =1:1
f = 0.39 m G 0.40 0.40
s = 0.00035
f = 0.31 m 0.25 0.25
POTONGAN F-F / SECTION. F-F
+43.18
Skala . B / Scale . B
+43.18
+42.48
4 2 0 2 4 6 8 10 M
+43.14 +43.06
+43.72 +43.72 +43.72 +43.60 +43.72
+43.42 +43.53 +43.61 +43.61 +43.61 SKALA. A / SCALE. A
+43.34 +43.23 +43.42 +43.26 +43.43
+43.26 +43.13 2 1 0 1 2 3 4 5M
+42.72 +42.82 +42.83 +42.82
+42.62 +42.62 +42.52 +42.72 +42.61 +42.73
+42.51 +42.41 SKALA. B / SCALE. B
0.40
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT Project Preparation Consultant (PPC)
0.40
0.50 7.10 1.40 2.00 7.00 16.80 1.40 2.00 DIREKTORAT JENDERAL SUMBER DAYA AIR Firm For Develompent of the Mrican
DIREKTORAT IRIGASI DAN RAWA Irrigation System In East Java
POTONGAN C - C / SECTION C - C Jl. Pattimura 20 Kebayoran Baru Telp/Fax. (021) 7228497 Jakarta Selatan 12110
Skala . A / Scale . A Subject: SALURAN SEKUNDER MOJOKENDIL (B4) Scheme : D.I MRICAN
POTONGAN E - E / SECTION E - E BANGUNAN SADAP BMD 9 (KW 86) HM 140+21 District : NGANJUK