NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAYS INFRASTRUCTURE

Karya Building 11 th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K.
Ir. ERNI BASRI.ST.M.Eng, IPM,ASEAN Eng PEMBANGUNAN
NIP: 19760813.200212.2.001 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

OCG - JOPRISS

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

H. NAGASHIMA RE LINE 1

INSTALL GUTTER USING SCAFOLDING LINE A


J. SARRE RE LINE 2
H. OKUHARA RE LINE 3
S. SIMLAI RED D (Electrical)
SKALA 1:120
YOSHIRO MIKI Station Expert
YESIM OZTUNC Mechanical Expert
Steel Structure
LEE KUANG JIE
Expert
Super Structure
TERUYUKI MORITA
Expert
MD.SABIR HUSSAIN Electrical Expert

CHECKED BY
TEDDY A. S. PRO B
CONTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPTION

ENDORSED BY :

NAME POSITION DATE SIGNATURE

PROJECT
I PUTU INDRA PRABAWA
MANAGER

CHECKED BY :

AROKA ARYADETA

DRAWN BY :

I PUTU KUSUMA S.

PROJECT

PEKERJAAN PRASARANA KERETA API RINGAN


/ LRT TERINTEGRASI DI WILAYAH JABODEBEK
LINTAS PELAYANAN 03 CAWANG - JATIMULYA

DED REFERENCE NUMBER

DRAWING TITLE

METHODE INSTALL GUTTER


USING SCAFOLDING

SCALE SIZE DISCIPLINE REVISION NO.

INSTALL GUTTER USING SCAFOLDING LINE C


SKALA 1:120 DRAWING NUMBER DATE

20-10-2020