You are on page 1of 2

NOTES :

B1
A1 RD-04.B
RD-04.B
EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K
FERDIAN SURYO A.P. PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

ENDORSED BY
D5
NAME POSITION DATE SIGNATURE
RD-04.B
PROJECT
R. MANAI
MANAGER

DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY

B2
J.SARRE Contruction Manager
RD-04.B

MAMORU OKUBO Depot Facility Expert

YOSHIRO MIKI Architecture Expert

LEE KUANG JIE Steel Structure Expert

GRAHAM S. HARRINGTON Super Structure Expert

CHECKED BY

TEDDY A.S PRO B


CONTRACTOR DESIGN & BUILD

06 PARTIAL ELEVATION D4 ISOMETRIC BRACKET


RD-04.B SCALE 1 : 15
RD-04.B SCALE 1 : 50

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

C1 C2
RD-04.B RD-04.B

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT 17
HASTOMO ADI
MANAGER 12

CHECKED BY

PROJECT 17
AROKA ARYADETA
MANAGER 12

DRAWN BY

17
B SECTION M. REZA FADJRI DRAFTER 12

RD-04.B SCALE 1 : 50 PROJECT

PERCEPATAN PENYELENGGARAAN
KERETA API RINGAN / LIGHT RAIL TRANSIT
TERINTEGRASI DI WILAYAH
C1 C2 JAKARTA, BOGOR, DEPOK & BEKASI
RD-04.B RD-04.B

DED REFERENCE NUMBER

SHOP DRAWING ARCHITECTURE


DRAWING TITLE

DEPOT (OCC & ADMIN BUILDING)


SHUTTER DOOR
RD-04.B (W) 4100 x (H) 4000
(SECTION)
A1 DETAIL SCALE SIZE DISCIPLINE REVISION NO.
C SECTION RD-04.B SCALE 1 : 10 A3 ARCHITECTURE R5
RD-04.B SCALE 1 : 50
DRAWING NUMBER DATE
NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAYS
DIRECTORATE OF RAILWAY INFRASTRUCTURE
B1 SECTION
RD-04.B SCALE 1 : 10

Karya Building 11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
NOTICED BY

NAME POSITION DATE SIGNATURE

P.P.K
FERDIAN SURYO A.P. PEMBANGUNAN
NIP. 19800215 200712 1 002 PRASARANA
LRT JABODEBEK

C1 SECTION C2 SECTION MANAGEMENT CONSULTANT


RD-04.B SCALE 1 : 10 RD-04.B SCALE 1 : 10

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER

DEPUTY
A. RAHMAT PROJECT
D2 MANAGER

RD-04.B APPROVED BY

J.SARRE Contruction Manager

MAMORU OKUBO Depot Facility Expert

B2 SECTION YOSHIRO MIKI Architecture Expert


RD-04.B SCALE 1 : 10
LEE KUANG JIE Steel Structure Expert

D3 D4 GRAHAM S. HARRINGTON Super Structure Expert


RD-04.B RD-04.B
CHECKED BY

TEDDY A.S PRO B


D1
RD-04.B
C3 SECTION C4 SECTION CONTRACTOR DESIGN & BUILD

RD-04.B SCALE 1 : 10 RD-04.B SCALE 1 : 10

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPTION

ENDORSED BY

NAME POSITION DATE SIGNATURE

PROJECT 17
HASTOMO ADI
MANAGER 12

CHECKED BY

PROJECT 17
AROKA ARYADETA
MANAGER 12

DRAWN BY

17
M. REZA FADJRI DRAFTER 12

PROJECT

PERCEPATAN PENYELENGGARAAN
KERETA API RINGAN / LIGHT RAIL TRANSIT
TERINTEGRASI DI WILAYAH
JAKARTA, BOGOR, DEPOK & BEKASI

DED REFERENCE NUMBER

SHOP DRAWING ARCHITECTURE


DRAWING TITLE

DEPOT (OCC & ADMIN BUILDING)


SHUTTER DOOR
RD-04.B (W) 4100 x (H) 4000
(SECTION)
D1 DETAIL BOTTOM BAR RD-04 D2 DETAIL SLAT RD-04 D3 GUIDE RAIL TYPE RD.B-1 D4 GUIDE RAIL TYPE RD.B-2 D5 DETAIL PUSH BUTTON SCALE SIZE DISCIPLINE REVISION NO.
RD-04.B SCALE 1 : 2 RD-04.B SCALE 1 : 2 RD-04.B SCALE 1 : 2 RD-04.B SCALE 1 : 2 RD-04.B SCALE 1 : 2 A3 ARCHITECTURE R5

DRAWING NUMBER DATE

You might also like