Professional Documents
Culture Documents
ITMP
Integrated Tourism Master Plan
| BPIW 2 02 1
BOROBUDUR
YOGYAKARTA
PRAMBANAN
i
The infrastructure development of the Borobudur National
Tourism Priority Destination is planned in an integrated
manner, including structuring the area, roads, supplying raw
and clean water, managing waste, sanitation, and improving
people’s housing through an infrastructure development
master plan.
M. Basuki Hadimuljono
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
ii
Content
Introduction 1
Development Concept 5
Detailed Development Plan KTA Borobudur 11
Detailed Development Plan KTA Yogyakarta 31
Detailed Development Plan KTA Prambanan 39
| BPIW 2 02 1
www.bipw.pu.go.id
@pupr_bpiw
@pupr_bpiw
PUPR_BPIW
iii
Foreword
Ir. Rachman Arief Dienaputra M.Eng The Regional Infrastructure Development Agency
Head of Regional Infrastructure is carrying out the preparation of technical
Development Agency policies and integrated plans for infrastructure
development programs based on a regional
development approach.
iv
Foreword
| BPIW 2 02 1
do not have a same vision and clear mechanism, Head of Center for Public Works
especially in utilizing the Borobudur Temple as Infrastructure Development
conservation-based tourism development. The Region II
development of tourism centered on the Borobudur
temple causes tourist visits to exceed the capacity
limit of the Borobudur Temple.
Efforts to guide cross-stakeholder collaboration Hopefully, ITMP BYP can support the development
are through integrated planning as outlined in of tourism destination destinations through
the BYP Integrated Tourism Master Plan (ITMP). improving institutional governance, optimizing
ITMP BYP is prepared through a collaborative and infrastructure development, and utilizing
sustainable approach by considering aspects of technological advances to improve basic
tourism, infrastructure, environment, forestry, services and business opportunities, increasing
spatial planning, and investment, as well as regional human resources for tourism business actors,
developments Yogyakarta – Solo – Semarang job opportunities, community welfare, and
(Joglosemar). sustainability. environment.
v
vi
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
01 / Introduction
Introduction
ITMP BYP is an annual and five-year plan with a term of 25 years. Priority details
of development are in the KTA (Main Priority Area) which includes Borobudur
District, Mungkid District, Prambanan District, all Districts in Yogyakarta City,
and overall development in the Joglosemar area.
| BPIW 2 02 1
The government pays great attention and hopes First, Borobudur Subdistrict and Mungkid
to the tourism sector as one of the new growth Subdistrict as the location of the Borobudur Temple
and is expected to create greater economic Complex which is a UNESCO World Heritage Site,
benefits in the form of foreign exchange and several ancient temples and cultural villages in the
new jobs. The BYP area is one of the super vicinity. Second, the Prambanan District area in
priority areas of the 10 National Tourism Priority Central Java Province and Prambanan District in the
Destinations . Visits of foreign tourists (tourists) Special Region of Yogyakarta as the location of the
to the BYP area showed an increasing trend Prambanan Temple Complex which is a UNESCO
reaching (2018): 416,372 foreign tourists. The World Heritage Site. The third area, Yogyakarta
largest market share comes from Malaysia, City with several major cultural heritage attractions
Singapore, Japan, and the Netherlands. proposed to be a UNESCO World Heritage Site.
Domestic tourists (wisnus) to the BYP area still
dominate and continue to increase to reach The main issues in the development of the BYP DPN
12,974,712 trips in 2018. are population density, inadequate connectivity,
basic services that are still low, and destination mana-
The planned area includes three areas, each of gement that still needs to be improved, especially in
which represents Javanese cultural heritage. the management of cultural heritage sites.
1
Introduction
2
Introduction
MISION
| BPIW 2 02 1
TDA
KTA
3
4
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
02 / Development Concept
Development Concept
| BPIW 2 02 1
The planning concept is outlined in 3 overlapping ‘spinners’: (i) the urban triangle of Yogyakarta,
Solo and Semarang <Joglosemar>, (ii) three tourism assets BYP culture, and (iii) three natural
assets including Merapi and Merbabu, coastal zone, and river valley.
The development concept follows the development Protection Environment for Self Food
pattern of equitable distribution of development Fulfillment and Agro-tourism Development
(Decentralization). This concept is intended to e. Development oriented to Environmental and
increase distribution and reduce the high pressure Social Mitigation
of development around WHS (World Heritage Site) f. Improving the Quality of Amenity through
destinations such as Borobudur and Prambanan Compliance with International Standards
as well as cultural heritage destinations in the city g. Integrated Institutional Strengthening
of Yogyakarta. Furthermore, the targets for the
development of the BYP DPN area are: To achieve this target, a Development Concept has
been prepared which takes into account 3 (three)
a. Equitable Development Distribution regional levels:
b. Improved Connectivity and Accessibility BYP Macro : Joglosemar
c. Cultural Heritage Preservation Meso : TDA Borobudur - Yogyakata - Prambanan
d. Improving the Quality of the Agricultural Micro : Each KTA
5
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Development Concept
6
Development Concept
STAGE PLAN
| BPIW 2 02 1
7
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Development Concept
8
Development Concept
MAJOR PROJECT
| BPIW 2 02 1
Borobudur)
6. Road Construction of Prambanan Regency
-Lemahabang.
7. Road Development of Tawang Regency -Ngalang.
8. Yogyakarta- Ambarawa Railway Reactivation (phase 1)
9. SPAM Regional Kartamantul II (TDA Yogyakarta)
10. SPAM Regional Kamijoro (Supply to YIA)
11. SPAM Regional Banyusoco (TDA Prambanan)
12. Expansion of IKK Prambanan
13. Increasing Sewon Management Capacity
14. Development of TPST Borobudur
15. Improving the Management of Piyungan Landfill
16. Construction of Long storage Commission (Magelang)
17. Upstream Progo watershed improvement
(Reforestation and environmentally friendly
agricultural practices)
9
02 / Detailed Development Plan KTA Borobudur
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
10
Detailed Development
Plan KTA Borobudur
The development of Borobudur KTA Details is directed at: (1) creating diverse tourism
products (diversification); (2) improving existing products (intensification); (3) maintain
character and landscape; (4) providing various entrepreneurial opportunities; and (5)
distribution of tourists in the surrounding area
| BPIW 2 02 1
In the first 5-year phase, priority zones in Borobudur In the second phase, the developed zones are
and Mungkid sub-districts were developed, namely: other sub-districts around KTA Borobudur, namely:
l Zone A: Main Cultural Tourism of Borobudur- l Zone C: Menoreh hill nature-based Tourism
Pawon-Mendut including the construction of Zone,
parking areas, l Zone D: Settlement Zone - Mungkid-
l Zone B: Balkondes mixed tourism (20 tourist Mertoyudan,
villages), l Zone H: Amenity Zone – Magelang City,
l Zone E: Urban Tourism Zone, Simpang l Zone J: Nature-based Tourism Zone – Combat
Palbapang TOD subdistrict
l Zone F: Amenity Zone - Blondo- Palbapang
Segment In the third phase, the developed areas are areas
l Zone G: Urban Tourism - Gate Area 4 Locations outside of Borobudur KTA as a step to expand the
(Palbapang Gate, Blondo Gate, Klangon Gate, number and diversify attractions.
Kembanglimus Gate) and
l Zone K: Preservation Zone of the Former
Ancient Lake
11
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Detailed Development Plan KTA Borobudur
12
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
(SOP) for Visitors and Tour Guides l Differentiation of visitor circulation path
13
Detailed Development Plan KTA Borobudur
14
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
15
Detailed Development Plan KTA Borobudur
P
Tuk Songo parking
Magelang regency such as the temples scattered l Improving road infrastructure that connects
in Magelang Regency (Asu Sengi Temple, Ngawen between destinations in the Menoreh area.
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Temple, Can- di Lumbung, Umbul Temple, Retno l Fixing tourist objects to the south of Borobudur
Temple, Selogriyo Temple, Gunung Wukir Temple, Temple in the Menoreh Mountains area, Kulon
Gunungsari Temple, Losari Temple, Pendem Progo Regency (including Suroloyo, Maria
Temple, Brangkal Temple, and Other Temples). Cave, Kiskendo Cave, Kalibiru, Nglinggo Tea
Plantation) to divide and distribute tourists
l Improving road infrastructure that connects who enter from Yogyakarta International
temples in Magelang Regency. Airport.
l Sambak-Kajoran nature tourism, Kaliangkrik,
Mount Gono, Kedung Kayang Waterfall, and
Ketep Pass.
16
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
17
Detailed Development Plan KTA Borobudur
18
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
19
Detailed Development Plan KTA Borobudur
The concept of heritage park zones 1 and 2 aims Cultural interpretation inscriptions can be in the
to restore the natural character of the Borobudur form of a board placed at dots significant aspects
landscape. related to knowledge of the Borobudur area,
history, and significant geological aspects. The
a. Arrangement of the Borobudur zone 2 parking placement follows the Borobudur-Pawon-Mendut
area into a Botanical Heritage Park pedestrian path.
b. Temporary relocation of the existing parking
area and construction of street vendors’ art Borobudur - Pawon
market to Kujon Field Arrangement of shuttle
service drop off area (wira-wiri) a. Arrangement of building facade guidelines
c. Hotel Manohara as Borobudur Study Center along Jalan Balaputradewa, arrangement of
(Borobudur Study Center) sidewalks on Jl. Balaputradewa
d. Temple Core Zone Arrangement (Borobudur b. Placement of rest stops on pedestrian paths
Route 10K). and signage that directs the Borobudur-Pawon-
Mendut route
c. Placement of cultural interpretation
Segment of Borobudur - Pawon - inscriptions, in the form of a board placed at
Mendut significant points
into a trade and service area. Some residential b. Land acquisition for the expansion of zone 1
and agricultural functions are still found along the Mendut temple
Balaputradewa road. c. Construction of the Kali Elo pedestrian bridge
d. Construction of the Progo side Promenade Line
In the context of the detailed development of e. Arrangement of pedestrian paths in the Bojong
Borobudur TDA/KTA, the concept of building settlement, Mendut
design needs to be considered so that it is in f. Construction of the Kali Progo pedestrian
accordance with the aim of maintaining the rural bridge
character and natural landscape of Borobudur g. Wanurejo . Village Environmental Road Arrange-
which is clearly related to the past traditions that ment
are still alive today, namely how to the traditional h. Arrangement of springs in the Pawon complex
life of the Javanese people. (Wanurejo).
20
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
Four Entrance Gates Zone the end of the SP-1 boundary. Therefore, the
construction of the Palbapang gate requires
The four entrance zones to the Borobudur area are HIA (Heritage Impact Assessment). The
in the segment of the main routes from Yogyakarta, Palbapang Gate will be one of the busiest
Semarang, Purworejo, and Kulon Progo. gates, because it will intersect with the Bawean
toll exit at the Palbapang T-junction, and is
Palbapang Gate (requires Heritage Impact integrated with the Palbapang Smart Pavilion
Assessment / HIA) plan, which consists of a train station, bus
terminal, parking area and a merchant center.
The Palbapang Gate (Singa Gate) is a gate located souvenir. Palbapang gate area is about 5,500
on the north side of the temple, bordering m (with land acquisition).
21
Detailed Development Plan KTA Borobudur
Blondo Gate
Klangon Gate
3. Kembangtimus gate
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
22
Detailed Development Plan KTA Borobudur
2. Blondo gate
| BPIW 2 02 1
the temple and can even be developed through
tourist villages and Balconies. Directions for
structuring transportation and parking locations
for the Borobudur area include: (1) Developing a
multifunctional transit area (souvenir, culinary,
parking, and wellness centers); (2) Construction of
the Toll Exit and Intelligent Pavilion of Magelang
Regency (Palbapang); (3) RTHP and Pawon
Parking Area; (4) Mendut RTHP (Former Orchid Balkondes and Tourism Village Zone
Garden); and (5) Kujon Integrated Art Village which
accommodates traders who are relocated from To empower villages, it is necessary to develop
zone 2 of the temple. village potentials and government support so that
they can become icons and prosper the village
With a land area of around 4000 m², the terminal community. Currently, 20 Balkondes have been
parking lot is equipped with arrangement of built in the Borobudur District. Tourists can get in-
merchant stalls, construction of public toilets, depth information on each Balkondes according to
laying of signage and street furniture, and the existing theme. It is hoped that this will reduce
arrangement of pedestrian plazas connected to the desire of tourists to go up to the temple, but
Jalan Pramudyawardhani and Borobudur Market. instead to the Balkondes.
23
Detailed Development Plan KTA Borobudur
1 Balkondes Kembang Limus Enjoy the temple landscape from the top
2 Balkondes Karang rejo View Punthuk Setumbu, Bukit Rhema
3 Balkondes Borobudur History of Borobudur Temple
4 Balkondes Wanurejo History of Pawon Temple, rafting on Progo
5 Balkondes Candi Mendut Legend of Mendut Temple, Tracking the Elo River
24
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
25
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Detailed Development Plan KTA Borobudur
26
Detailed Development Plan KTA Borobudur
Human Settlement
1. Kujon Integrated Art Village 15. Gate /Rest Area and Klangon Corridor- Boro-
2. Multifunctional Transit Area, parking, culinary budur
| BPIW 2 02 1
center and souvenir Tuk Songo 16. Gate /Rest Area and Salaman Corridor- Boro-
3. Multifunctional Transit Area, parking, culinary budur
center dansouvenir Eks. Animal Market 17. RTHP - Punthuk Cemuris (viewing point)
4. Multifunctional Transit Area, parking, culinary 18. Arrangement of Bigaran tourist village
center and Ex souvenirs. Terminal Borobudur 19. Borobudur Island Park
5. Renovation of Borobudur Market into an Area 20. Arrangement of Majaksingi Tourist Village
Multifunctional Transit Area
6. RTHP and Pawon Parking Area 21. Construction of Tegalarum Tourist Park and
7. RTHP and Mendut Parking Area (ex-Taman Rest Area
Ang-grek) 22. Arrangement of Ngargosari tourist area
8. Revitalization of the park & Ex-Parking Area 23. Arrangement of Tuksongo Tourist Village Road
and Pu-sat Souvenir into Botanical Heritage Area, Viewing deck watu adeg
Park 24. Arrangement of Punthuk Ndu-wet and
9. Restoration of The Imaginary Line of Mendhut PunthukMarhaen Attractions Area
- Pawon - Boro- budur 25. Construction of Mumer Hill Statue Tourist
10. Development of Creative Tourism Simpang Destination
Mendut 26. Structuring wringinputih area
11. Arrangement of the core zone of Mendhut 27. Arrangement of Cemuris Hump area
Temple 28. Arrangement of Goa Gondopurowangi Tourist
12. Construction of The Smart Bridge Kab. Attractions and Petilasan Tomb of Prince
Magelang Diponegoro
13. Palbapang-Borobudur Gate and Corridor 29. Arrangement of sendang lanang sendang wadon
14. Blondo- Borobudur Gate and Corridor 30. SPAM Kamijoro ** (itmp renaksi, rakortek).
27
Detailed Development Plan KTA Borobudur
Inter-Balkondes Routes
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
Inter-Balkondes Routes
28
Detailed Development Plan KTA Borobudur
| BPIW 2 02 1
Prehistoric Lake Borobudur Location
The location of this lake is strategic, so there are Regulation comes into effect) it is expected
many commercial buildings standing on it. If to take the following actions: (a) Do not paint
prevention and follow-up are not carried out, it is the building; (b) if there is a protective coating,
feared that the Borobudur area will lose the shape such as an anti-rust coating; must use a color
of its ancient lake. The directions for this area are: that leads to the color of the earth (earth
tone); (c) plant more vegetation on the land,
a. Maintain the shape of the lake by maintaining the built-up land should be less than half of
agricultural functions. the vegetated land. the choice of vegetation
b. Restoring local food crop varieties and must match the plants in the reliefs and the
developing processed products originating plants that grow in the Borobudur TDA area;
from ancient lake lands. and (d) plant trees with large canopy around
c. For buildings that were built on this land the building, at least 1 large canopy tree per
before 2014 (before the Presidential 16m2.
29
04 / Detailed Development Plan KTA Yogyakarta
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
30
Detailed Development Plan
KTA Yogyakarta
| BPIW 2 02 1
The development of KTA Yogyakarta will focus Tourism Zone;
on the theme of Historical Tourism with Cultural f. Keraton Main Cultural Tourism Zone;
Insight, Following the Times and Sustainable g. Taman Sari Special Theme Amenity Zone;
Tourism. KTA Yogyakarta is classified into 5 main h. Ngabean Terminal Amenity Zone;
zones, namely the mixed tourism zone, the i. Winongo River’s Environmentally Friendly
amenities zone, the main cultural tourism activity Urban Tourism Zone;
zone, the environmentally friendly urban tourism j. Mixed Tourism Zone of Margoutomo-Kotabaru
activity zone, and the residential zone integrated and Malioboro-Margomulyo-Pakualaman;
with tourism activities. the location of the zone k. Tugu Station Amenity Zone;
based on the group of attractions and activities l. Jombor and Condong Catur Terminal Amenity
are as follows. The location of the zones based Zones;
on the group of attractions and activities are as m. Residential Zone;
follows: n. Kotagede Residential Zone;
o. Kotagede Main Cultural Tourism Zone;
a. Krapyak Stage Main Cultural Tourism Zone; p. Adisucipto Amenity Zone;
b. Mijen Village Special Theme Settlement Zone; q. Urban Tourism Zone with Environmental Insight
c. Plengkung Gading – Panggung Krapyak Mixed at Kali Gajah Wong;
Tourism Zone r. Giwangan Terminal Amenity Zone;
d. Keraton Special Theme Amenity Zone; s. Tegalrejo Environmentally Insight Urban
e. Kali Code Environmentally Friendly Urban Tourism Zone.
31
Detailed Development Plan KTA Yogyakarta
32
Detailed Development Plan KTA Yogyakarta
| BPIW 2 02 1
Malioboro-Margomulyo Development
urban spaces, friendly to pedestrians, and history.
Concept
The plan will include, among others:
Mixed-use Development Area ex Indra
a. Revitalization of the Krapyak Stage Cultural
Theater
Heritage Building and the Surrounding Areas,
Arrangement of the Main Pedestrian Area
The priority zones on the Philosophical Axis Sub- for the Plengkung Gading-Panggung Krapyak
KTA that are prioritized in development are: Segment, and the Construction of Mini Forest
and Visitor Center of the Krapyak Stage;
Plengkung Gading-Panggung Krapyak b. Development of Mijen and Niti Gedongkiwo
Segment Villages;
c. Development and Arrangement of Ant
Focus The theme of this place is: “Citra of the South Field Parking Area and Development and
Gate Wisata Axis Philosophis”, which focuses on Arrangement of Panggungharjo Field Parking
cultural heritage assets (Panggung Krapyak), shady Land;
33
Detailed Development Plan KTA Yogyakarta
34
Detailed Development Plan KTA Yogyakarta
heritage areas. The program will include, among Kotagede Greater Area
others:
a. Development of the Gajah Wong . Watershed
a. Development of the Jetis Cultural Heritage Area Area
b. Revitalization of the Kotabaru Cultural Heritage b. Connecting the Kotagede Area with the
Area Gajahwong Eco-District
c. Development of Mixed-use area of Tugu Station
c. Kotagede Complex Shuttle service
d. Jogoyudan Kampung Village Development
e. Cokrodiningratan Tourism Village Development d. Procurement of site information facilities in the
f. Pedestrianization of Margoutomo Segmen Kotagede area.
Segment
g. Kranggan and Surrounding Market Blok I: Kotagede Core Zone
Arrangement
h. Development of the potential for parking lots a. Pedestrianization of the main road in the core
and green open space in the Margoutomo area
Segment; and b. Cepuri revitalization around Kotagede
i. Margoutomo Segment Virtual Tourism c. Kotagede Mosque Page Arrangement
Development.
d. Kotagede Market Revitalization/ Legi Market
| BPIW 2 02 1
e. Revitalization of the Kedaton and Watu Gilang
Sub-KTA Kotagede Areas.
Sub-KTA Kotagede uses the delineation of the Blok III (Karanglo Corridor) + VI
Kotagede Cultural Conservation Area (KCB) that (Tegalgendu Corridor)
intersects with the Sub-KTA Eco-District Gajah
Wong. there are many programs that intersect a. Construction of the Silver Museum and
that have different development goals. The Kotagede Museum as a regional information
development orientation of the Kotagede Sub-KTA center at Rumah Kalang Tegalgendu
is Culture and the Gajah Wong Eco-District Sub-KTA b. Pedestrianization and Arrangement of building
is integrated development of ecological areas. facades on Jalan Mondorakan
c. Revitalization of the CB Building in Purbayan
From the eight blocks, development priorities Village
were then selected in Kotagede, particularly block d. Revitalization of the CB Building in Jagalan
I, Block III which was combined with Block VI due to Village
the similarity of characters, and block VIII. e. Preservation of Jagalan Village’s Traditional Art
35
Detailed Development Plan KTA Yogyakarta
36
Detailed Development Plan KTA Yogyakarta
Sub KTA Gajahwong Ecodistrict Development Concept
Smart Park 2: Aquatic Art Tech Park
| BPIW 2 02 1
legend 7 Plaza
1 Parking 8 Amphitheater Stage
A Enterance Building
2 Flower garden 9 Windmill
B Science Center Building
3 Water outbound 10 Water Fountain
C Aquatic center building
4 Ship Pier 11 Gazebo
D Observation center
5 Commercial and service 12 Rice fields
E Culture Center Building
6 Trampoline bridge 13 Mosque
37
05 / Detailed Development Plan KTA Prambanan
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN
38
Detailed Development Plan
KTA Prambanan
| BPIW 2 02 1
Cultural Conservation Area, structuring the temple area and the surrounding area.
Specifically, the development in KTA Prambanan temple complexes scattered in the Bugisan,
and its surroundings (Klaten Regency and Sleman Kalasan, and Bokoharjo areas;
Regency) is carried out with the aim of: c. With an integrated bike trail and public transport
(shuttle bus) that connects all temples, it also
a. Visitors to the Prambanan Temple Complex, creates an even distribution of amenity areas.
which previously only focused on the Perwara d. The distribution of visitors is not only limited to
Temple, were dispersed or decomposed cultural tourism and temple history, but also to
through rearranging the visitor’s route starting other types of tourism, such as tourist villages
from the Shiva Temple and then to several and nature-based tourism;
supporting facilities such as a museum and e. Spreading tourists to various other potential
botanical garden; National Tourism Priority Destinations (NTPD/
b. The decomposition of visitors to the Prambanan KSPN) such as KSPN Mount Merapi, KSPN
KTA which previously was only concentrated Karimun Jawa, KSPN Klaten and Solo, KSPN
in the Prambanan Temple Complex and Boko Wonogiri, KSPN Gunung Nglanggeran, and KSPN
Temple was carried out by developing other Imogiri which are currently not well developed.
39
Detailed Development Plan KTA Prambanan
40
Detailed Development Plan KTA Prambanan
| BPIW 2 02 1
j. Nature Based Tourism Zone – Opak River.
Developing other natural tourism l Reviving the Prambanan OUV / Core zone of
potentials in the Prambanan TDA area. the region
l Temple Site Preservation
Develop the economy of residents around l Improvement of New Attractions and
the Prambanan TDA by activating tourist Amenities at Prambanan Sleman
villages as accommodation and amenity l Village Development - tourist villages in
centers for tourists. Prambanan Klaten.
41
MINISTRY OF PUBLIC WORKS AND HOUSING
REGIONAL INFRASTRUCTURE DEVELOPMENT AGENCY
| IT DP BORO BUDUR-YOG YAK ARTA-PRAMBANAN