You are on page 1of 45

g@ 9eor olsrd esea:O e'r(Do!

E goggd66 oeeLtoo@deo
gdog, e,eo6o 07.
ron@6q DrF6[ dou tor16ory Ourgfuiua:nerfi gleoerrBaort
.. ,LOMBO MUNICIPAL COUNCIL ra,r, ucmuufi, Garrigrbq 07.
MUNICIPAL ENGINEER'S DEPARTMENT
M *go ) Town Hall, Colombo 07.
.J ir,, .rr ) ,u:Ae.-ry )
My No. J
Your No. )
e6.od{,6
fs,ro,o,cLrd \ zast t et, 2693437
Telephone J

Mr. Jiang Houliang,


Managing Dircctor,
CHEC Port City Colombo - @vt) Ltd.,
Central Point Buildiry, 2 3 rAN 20li
No. 4e & 56 Floors,
No. 54, Chatharn Sfte, oosSql
Colombo 01.
lo'oo Ru

Roeds. Tnffic end Lir&tinq Dcsisr

This is reference to yorn letter dated 096 October 2Ol7 regarding above.

This is to confirm you that the contents in the desip report of roads, traffic and lighting and
sSmitted on 20 Jrure 2Ol7 eerd' subsequent amendrnents subodtted on 09 October 2017 does
comply with desip standards maintained by the Traffic Design & Road Safety Division of
Colombo Mrmicipal Cormcil.

l^--==-w
Eng. K. A. D. N. Wickramaratne,
Dircctor Engineering (Traffic, Desip & Road Safety)
19tr January 2018.

^ 1,? J;, ;,?r; ] ;, ll;.,,:xrn.


(ira,rrcCes,g;r E ,load
corcmtc Seilyr
.rnicbal Courrl.

a--ri; 3r7atJ sn r..5g. D6drI .6,ilxr6 oor66\Dircrn6. KEfP T}IT CIIT CI F-A\.
100 5.002
4.993
5.017
5.008
5.027
5.406
5.340
5.290
5.694
5.681
5.032
5.069 5.246
5.231
5.012 5.098
5.119 5.1755.211
5.178 5.654
5.020 5.636
5.026 5.649

TM 2
5.030 5.646

TM 2
LM 7

LM 12

LM 1
OM 7a

0M 8
OM 7a
5.024 5.576

OM 7a
LM 12

OM7a

TM 1
LM 7

LM 7

OM 7a

CM 8
CM 8
TM 1

TM 1

OM 7a
5.021 5.564

OM 8

TM1
5.039 5.550
5.580

LM 7
LM1

LM 13
5.056 5.527
5.067
5.506
5.086

TM 2
5.483

LM 7
5.091

LM 7
5.097
5.489 Tr

KE- STA.4+826.768
EC-
STA.4+826.768
5.393

+960
+980
STA.0+000

+940
STA.5+000

A=162.019
+920

R=750.000
+020
+020

STA.4+900

L=35.000
5.095

00
+040

L=72.138
+040

STA.0+0

+880
+020

+860
+060

KA-
+060

STA.4+881.50
STA.4+881.5

+840
CONNECT &
Churc

STA.4+861.7
KA-
+040

STA.4+861.76
h Street

+820
5.383

5 R=∞
+080

05
+080

A=88.318

68

STA.4+800
Exten

L=19.738

R=∞ A=162.019
8
L=19.738
sion

+780
+060

L=65.000
5.103
STA.5+100
STA.0+100

L=35.000
+080
+120

MH(SW)
+120

5.414
+140 STA.0+100
+140

5.126 RG
+120
+160
+160

+140
+180
+180

5.460
+160

STA.5+200
STA.0+200

+180
+220

Tr
+220

5.132
+240 STA.0+200
+240

5.356
+220
+260
+260

+240
+280
+280

5.134
27

+260
STA.0+301.2

Road
STA.5+300

5.374
STA.0+300

Chaithya
STA.5+312.873

BUILDING IN
+280

p
0.000
28230
37

STA.0+284.4

5.117
5.291
5.132 MH(SW)

Ramp

Ramp
B
5.285

C
5.119 CCTV 5.257
Tr
X=192453.509
Millimetres

Upper
Chatham
Street

5.134 5.272

X=192452.552
THE FUTURE

p
0.000
28231

5.159 5.249

Y=96990.963 5.155
RG 5.215
5.239

Y=96975.781 5.170
5.211 RG
RG 5.176

p
0.000
28233
5.190 5.245
5.213
Tr

Ramp
A
5.204
5.231
5.202
5.229
5.210 5.228 Tr Lotus Road

5.207 5.264
5.187 5.215 28235

p
0.000

Tr

Galle
5.080

Face
5.317

Centre
5.214 5.201

Road
5.152
5.217
5.141

X=192429.576 5.229
5.218
5.119
5.072
5.050
5.044

X=192447.749 Y=97012.166 5.208


5.264 5.151
5.020
5.042
5.015

X=192433.737 5.215
5.212
4.972
4.952
4.965
4.972

Y=96983.921 Y=97031.729
5.186
4.948
4.942
4.935
4.934
5.204
5.226 X=3848618.714 X=192429.000
4.934
4.950
4.936
4.937
4.980
4.933 MH
4.926
MH
MH
X=192423.400 5.225
5.244
Y=1940646.491 Y=97060.340
4.938
4.926
4.928
4.912
4.927
4.967

X=192420.500 5.113 4.885


10

5.236 4.897
Y=96983.822 5.231
4.883
4.884
4.856
4.843
4.905

LL..O
Y=96988.361 5.231

X=192423.263 X=3848430.684
5.237
5.237 5.214 5.005 MH

O..W
5.242
X=3848339.133
0

This part will not be constructed Y=96978.824

JD
X=192419.984 Y=1940187.328 5.234
5.229
KEY PLAN
Y=1940580.854

0
WI
Y=96994.447 5.219
DO NOT SCALE

此部分暂不施工 R10.000
5.209
5.206
5.192 Lottest Road

IN
5.194

NTT
5.204
5.183

NOTES:

BP +00
X=192403.076 5.185 5.108
5.029 4.9124.904
4.920
4.881
4.901
4.905 4.878
4.863 4.896
4.900 4.903
4.889 4.895
4.906 4.946
4.901 4.9244.923
4.921 4.911
4.941 4.910
4.924 4.935
4.939
4.939

2K
5.178 4.914
4.931

R26
4.947

EER
Y=96815.003 5.187 4.941

+0
说明:
4.964

X=192422.530 %
4.964

.8
5.172

2.5
4.985

0
0
5.166 5.036

R15.

20
5.052

RIIM
2
5.172 5.045

Y=96952.052 5.138 5.154 5.046


5.057 1. ELEVATION、COORDINATE MUST BE CHECKED WITH LAYOUT, AND OTHER RELATED
3
5.148
5.032
5.138

0
PROFESSIONALS DRAWINGS BEFORE CONSTRUCTION.
5.054

2.5% 3
5.145
5.138
X=3848069.471
5.081
5.050

8 5.135 5.063

3.5
1.8
标高、坐标需与总图、工艺等相关专业图纸核对无误后方可施工。
5.125 5.078

X=192393.285 5.111
5.100 Y=1940753.581 5.091
5.078
5.097
X=3848026.337 5.067
2.FOR NOTES AND LENGEND REFER TO DRAWING NO. CPCDP-ATK-HGN-GA-DR-C-1000.

2.2
Y=96965.957 4
5.090
5.077
5.044
5.062

Temporary sidewalk 7 X=192409.224 5.062


5.070 Y=1940923.215 5.026
5.010 注释和图例参考图纸CPCDP-ATK-HGN-GA-DR-C-1000.

3.5
1 Y=97017.938 5.044

+0
5.000

3.ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE NOTED.

2.0
5.032

临时人行道
4.987

R6.000 5.040
X=3847968.249

40
5.038 4.988
5.053 4.969

除非另有说明,否则所有尺寸均以米为单位

1
5.042 4.956
Y=1940818.212

2.0
5.016 4.953

X=192389.095 X=192380.457 5.019 4.932


4.ALL LEVELS ARE IN METRES ABOVE LOW WATER ORDINARY SPRING

3.5
5.008
4.937

Y=96814.272 Y=96979.583 5.003

10.5
RG
4.929

X=192400.857
4.995
4.922
(LWOST) DATUM.

3.5
4.981

17
4.956 4.896

Y=97003.121
4.944 4.886
所有水位均以米为单位,高于低水位普通泉水(LWOST)基准面。

10.5
R-∞

+0
2.5%

2
R-∞ 4.930 4.875

X=192383.739 X=192392.533 4.937 4.869

5.COORDINATE SYSTEM ARE IN SRI LANKA'S LOCAL COORDINATE SYSTEM.

60
3.5
Green belt 绿化带

R26.
4.956 4.877
28.0 Y=96983.835
7.0
X=192388.456 Y=97039.466
4.958 4.858

坐标系为斯里兰卡当地坐标系。
4.923 4.849

3.5
JD2

5
4.919 4.841

Green belt 绿化带


R-30 Y=97000.360 4.900
+260

4.838

7.0
X=192375.114 4.906
+240

4.803
4.904 4.835
+220

4.897 4.822
MH(T)
Y=96813.542

R33.5
+200
4.874
RG4.768
2K0+260.958

4.880
e

+180
offic
4.787
4.883

+0
+160
4.775

rity
4.888
10.5

+140
cu
4.886 4.781

+160

+120
t Se

80
JD1

2.5%
4.869 4.789

2K
iden

+100

ZY
4.877 4.754
EP

res
4.875 4.757

10.5
X=192383.136

0+
4.854
4.859
4.761
4.729
P

07
Y=96996.221

2K0+
R50.0
3.5

2K0+095.422
4.861 4.708
4.824 4.706

5.6
2.2

4.858 4.702

X=192375.992
1.8

2.0%

QZ
4.830 4.713

09
4.812 4.707

085.
Y=96998.211 4.805

YZ
4.692

X=192367.094 4.770
X=3847229.912 4.691

2.0
4.774
Y=1941266.381 4.663 MH(SW)
3.5

Y=96967.031 4.772
4.656

L.O.
516
4.763

X=192377.174 X=192379.920 4.744


4.755 X=3847145.453 4.645
4.652

4.640

Y=96975.330 Y=96989.852 4.747


4.743
Y=1941266.881 4.648
4.602

sidewalk 人行步道
4.718
4.612
4.715

W IN
4.601
4.702

Green belt 绿化带 4.678


4.684
0+08
0
4.594
4.590
4.574

cycle path 自行车道


4.669
4.669 4.568

tue
4.556

sidewalk 人行步道
4.658

Green belt 绿化带 Sta


4.550
4.657 MH(T)

TER
4.648 4.538

carriageway 行车道 4.642 4.521

carriageway 行车道
4.513
4.641
4.478
4.632

separador central 中央分隔带


4.490

separador central 中央分隔带


4.625
RG 4.468
4.608 4.472

road midline 道路中线


4.606 4.466

IM
road midline 道路中线 4.589 4.440
4.590 4.405

separador central 中央分隔带 separador central 中央分隔带 C3 4.598 RG


4.409
4.365

Interim design 4.561


4.562
RG MH 4.345
4.325
4.327

carriageway 行车道 4.567


4.552
4.291
4.305
4.270
4.266
4.295MH
4.549 4.304
0+10 4.279
4.549
4.532
0 RG
4.523 MH
4.504 MH
4.497
4.489
4.472
4.462
4.456
4.468
4.468
4.444
4.450
4.455
4.441
RG
4.455
4.446
4.440
4.446
4.441 0+12
4.429 0
4.446

12.0
4.458
4.447

0
4.438
4.444
4.445
RG

BSS
4.437

ROAD PLAN 12 0
N 0+ RG
ST ATIO

20.0
0
C3 02-12-22 REVISED AS PER THE CMC COMMENTS ZHAO LI
0+14
3.00 C2 22-04-22 APPROVED FOR CONSTRUCTION ZHAO LI
0
RG MH(T)
C1 28-02-22 APPROVED FOR CONSTRUCTION ZHAO LI

Rev. Date Description By Chk'd App'd

Drawing Status Suitability

APPROVED FOR CONSTRUCTION A


Curve element table Project Title
COLOMBO PORT CITY
DEVELOPMENT PROJECT

number coordinates Stake number transition Tangent Curve Outer Correc-


Client
CHEC PORT CITY COLOMBO (PVT) LTD.
Angle Radius 4th & 5th Floors,
curve length length distance tion value Central Point Building,
NO.54, Chatham Street,
X(N) Y(E) Colombo 01
Tel:+94 112 335 141 / 42 / 43
Fax:+94 112 335 140
Design Consultant

CHINA HARBOUR ENGINEERING


COMPANY LTD.

Drawing Title

Bou South Road Plan


BOU SOUTH 道路平面图

Scale Designed / Drawn Checked Approved Authorised


1:500 ZHAO LI
Original Size Date Date Date Date
A2 02-12-22 02-12-22
Drawing Number Project Ref. No.
Project Originator Volume

CPCDP - CHEC -RD-C-2001 Revision

C3
Location Type Role Number

You might also like