SECTION 3 - HYDROSTATIC SYSTEM.
5. Assemble the charge pump first by installing
drive pin, 1, into the coupler.
7. Assemble gerotor ring, 3, nto cover, 4. Orient
the cover into the rear housing for the proper
6. Install gerotor gear, 2, over the drive pin. ®
input shaft rotation direction. \
Figure 3.44
8. Install the locating pin into the cover and ceacHANOS
postion the cover propery. The pin shou \ er
PZ soca
A
be opposite the control arm or pintle shaft.
Ty
Le
GEROTOR ASSEMBLY
Figure 3.45,
9, Install two smaller O rings, 3, into the rear
center section. Use petroleum jelly to hold
them in place. Install O rings, 4 and§, intothe
grooves of the gerotor spacer, 2.
10. Reassemble the front section to the rear and
install the four allen-head screws. Tighten to
54 Nem (40 ft. Ibs.) torque.
A
CAUTION: THE PUMP IS HEAVY. USE
EXTREME CARE WHEN REMOVING THE
ASSEMBLY FROM THE MACHINE.
Figure 3.46
3-48