Professional Documents
Culture Documents
Page 1
Section KLAUS Multiparking GmbH
Dimensions Hermann-Krum-Straße 2
Car data D-88319 Aitrach
Fon +49 (0 ) 75 65 5 08-0
Page 2 Fax +49 (0 ) 75 65 5 08-88
2000 kg 1 / 2600 kg 2
Width info@multiparking.com
www.multiparking.com
dimensions
Dimensions
Page 3
Approach
All space requirements are minimum
Load plan 9 10 7 finished dimensions.
Tolerances for space requirements + 30 . 3
Dimensions in cm.
Page 4 EB (single platform) = 3 vehicles
Pit DB (double platform) = 6 vehicles
75
Technical
Shaft for maintenance
Tec. data
weight max. 2000 kg max. 2600 kg
To be perfor-
wheel load max. 500 kg max. 650 kg
med by the
customer Clearance profile
Page 7
160 30
Description
45
55
see table
8
15° 13°
6°
6 5
100 125
Water drainage Grounding 500 (520)
100 100
100 x 530 for vehicle up to 5.00 m = 16’4’’ long
(550 for vehicle up to 5.20 m 17’ long)
U3-605
H2
H1
1 Standard type 9 If necessary, protective gratings are installed at the back area
Special system: maximum load for extra charge. The upper platform is a frame construction. Flooring can
MultiBase U3 | Code number 586.65.850-003 | Version 03.2018
2 10
3 To follow the minimum finished dimensions, make sure be provided by the customer (e.g. soil/turf, sandbed/turfblock,
to consider the tolerances according to VOB, part C sandbed/marble, etc.). Maximum weight of customer coating
(DIN 18330 and 18331) and the DIN 18202. 250 kg/m2 – please contact KLAUS Multiparking.
4 Car width for platform width 230 cm. If wider platforms The upper platform is at ground level and is traversible when in
are used it is also possible to park wider cars. lowered position (vehicle load: 2600 kg maximum, wheel load:
650 kg maximum).
5 Potential equalization from foundation grounding connection
to system (provided by the customer). 11 A separate maintenance manhole must be installed by the
customer (with manhole cover, ladder and a connecting
6 Slope with drainage channel and sump see page 3. passage to the pit). A save maintenance access with a door
7 In compliance with DIN EN 14010, 10 cm wide yellow-black has to be provided by the customer – please contact KLAUS
markings compliant to ISO 3864 must be applied by the Multiparking. The hydraulic power unit and ventilation system
customer to the edge of the pit in the entry area to mark the are also housed in the maintenance manhole
danger zone (see „load plan“ page 4).
8 At the transition section between pit floor and walls no hollow After operation, the system must always be run into the
mouldings/coves are possible. If hollow mouldings/coves are lowest final position (key interlock).
required, the systems must be designed smaller or the pits
accordingly wider.
MultiBase U3 | Code number 586.65.850-003 | Version 03.2018 Page 2 of 7
Page 1
Width dimensions
Section
Dimensions Top view closed pit
Car data
Single platform (EB) Double platform (DB) Serial system (EB and DB can be combined)
Page 2 Shaft covering
Width
(performed by
dimensions the customer)
Page 3
Approach Top
Load plan EB platform DB EB/DB EB/DB EB/DB
Page 4
Pit
Paving Entrance
75
75
Page 6
Tec. data B
To be perfor-
med by the
customer
Page 7 12
35
Description
Cutting through
50
Shaft for
maintenance
Door
80 60 (performed 80 60 80 60
by the
customer)
0,00 0,00 0,00
Top edge Top edge Top edge
finished finished finished
floor floor floor
80
80
0 100
100
Passage
17 5 17 5
Pit dimensions EB Usable platform width Platform width Pit dimensions DB Usable platform width Platform width
B parking levels top platform B parking levels top platform
275 230 270 505 460 500
285 240 280 525 480 520
295 250 290 545 500 540
305 260 300 565 520 560
315 270 310 585 540 580
Page 2
Width
dimensions
Page 3
Approach
maximum maximum
descending ascending
Load plan slope 3 % slope 10 %
Page 4
Pit
Paving
The illustrated maximum approach angles must not be exceeded. Incorrect approach angles will cause serious
maneouvring & positioning problems on the parking system for which the local agency of KLAUS Multiparking
Page 5
accepts no responsibility.
Electrical
installation
Technical
data Load plan
Page 6 Section U3
Tec. data
To be perfor-
Entrance Upper platform with sheet metal plates Upper platform with stone layer
med by the
customer usable platform width F1 F2 15 usable platform width F1 F2
Page 7
EB 2000 kg +93 +46 EB 2000 kg +97 +49
Description
EB 2600 kg +101 +50 EB 2600 kg +107 +53
16
Top view
F1 F2
usable platform
width + 25
13
B
F1 F2
14 Marking 10
Page 2 channel
Width
dimensions
Floor drain
100 100
Page 4
Pit
Paving
Page 5
Electrical
Base 1-2% Base
60
installation
plate plate
Technical
data
50
1-2% 1-2%
Page 6
Tec. data
50
To be perfor-
med by the
Base Base
customer
60
plate 1-2% plate
Page 7
Description 100 100
Before filling the trough with concrete or asphalt, edge stripping must be placed around the edges on site.
Before filling, the trough must be lined with a water-impermeable foil by a specialist company on site.
Dimensions rounded.
80
20
35
Before paving, the trough must be lined with a water-permeable filter fleece by a specialist company on site.
Dimensions rounded.
MultiBase U3 | Code number 586.65.850-003 | Version 03.2018 Page 5 of 7
Page 1
Electrical installation
Section
Dimensions Installation diagram Electrical data (to be performed by the customer)
Car data
No. Qunatity Description Position Frequency
1 12
Page 2
1 1 Electricity meter in the supply
line
Width 2
dimensions
2 1 Main fuse: in the supply 1 per unit
3 3 x fuse 32 A (slow) or line
circuit breaker 3 x 32 A
8
120
(trigger characteristic K or C)
Technical data
Field of application Safety grids
By default, the system can only be used for a fixed number of If the permissible drop opening is exceeded, safety grids are to be
users. If required, would you please contact us. mounted on the systems. If there are traffic routes next to or
behind the installations, barriers compliant to DIN EN ISO 13857
Units must be installed by the customer. Barriers must also be in place
Low-noise power units mounted to rubber-bonded-to metal during construction.
mountings are installed. Nevertheless we recommend that
parking system’s garage be built separately from the dwelling. Environmental conditions
Environmental conditions for the area of multiparking systems:
Available documents Temperature range –10 to +40° C. Relative humidity 50% at a
– maintenance offer/contract maximum outside temperature of +40° C.
– declaration of conformity If lifting or lowering times are specified, they refer to an
environmental temperature of +10° C and with the system set
Building application documents up directly next to the hydraulic unit. At lower temperatures or
According to LBO and GaVo (garage regulations) the Multiparking with longer hydraulic lines, these times increase.
systems are subject to approval. We will provide the required
CE Certification
building application documents.
The systems offered correspond to DIN EN 14010 and the
Corrosion protection EC Machinery Directive 2006/42/EG.
See separate sheet regarding corrosion protection.
Care
To avoid damages resulting from corrosion, make sure to follow
our cleaning and care instructions and to provide good ventilation
of your garage.
MultiBase U3 | Code number 586.65.850-003 | Version 03.2018 Page 6 of 7
Page 1
Technical data
Section
Dimensions Sound insulation
According to DIN 4109 (Sound insulation in buildings), para. 4, Increased sound insulation (special agreement):
Car data
annotation 4, KLAUS Multiparkers are part of the building services Draft DIN 4109-10, Information on planning and execution,
Page 2 (garage systems).
Width
proposals for increased sound insulation.
dimensions
Normal sound insulation: Agreement: Maximum sound level in personal living and working
areas 25 dB (A). Noises created by users are not subject to the
DIN 4109, para. 4, Sound insulation against noises from building requirements (see table 4, DIN 4109).
services.
Page 3 The following measures are to be taken to comply with this value:
Approach Table 4 in para. 4.1 contains the permissible sound level values
Load plan emitted from building services for personal living and working – Sound protection package according to offer/order
areas. According to line 2 the maximum sound level in personal (KLAUS Multiparking GmbH)
living andworking areas must not exceed 30 dB (A). – Minimum sound insulation of building R’w = 62 dB
Noises created by users are not subject to the requirements (to be provided by customer)
Page 4
(see table 4, DIN 4109).
Pit Note: User noises are noises created by individual users in our
The following measures are to be taken to comply with this value:
Paving Multiparking systems. These can be noises from accessing the
– Sound protection package according to offer/order platforms, slamming of vehicle doors, motor and brake noises.
(KLAUS Multiparking GmbH)
Page 5 – Minimum sound insulation of building R’w = 57 dB
Electrical (to be provided by customer)
installation
Technical
Page 6
Tec. data Safety fences Electrical supply to the main switch / Foundation earth connector
Suitable electrical supply to the main switch must be provided by
To be perfor- Any constraints that may be necessary according to DIN EN ISO
the customer during installation. The functionality can be monitored
med by the
13857 in order to provide protection for the park pits for pathways
customer on site by our fitters together with the electrician. If this cannot be
directly in front, next to or behind the unit. This is also valid during
done during installation for some reason for which the customer
construction. Safety grids on the systems are, if necessary, optionally
Page 7
is responsible, the customer must commission an electrician at
available against surcharge.
Description their own expense and risk.
Numbering of parking spaces In accordance with DIN EN 60204 (Safety of Machinery. Electrical
Consecutive numbering of parking spaces. Equipment), grounding of the steel structure is necessary, provided
by the customer (distance between grounding max. 10 m).
Building services
Any required lighting, ventilation, fire extinguishing and fire alarm Maintenance manhole
A separate maintenance manhole with manhole cover, ladder
systems as well as clarification and compliance with the relevant
and a connecting passage to the pit must be installed by the
regulatory requirements.
customer. In multiple systems, a shared maintenance manhole
Drainage may be sufficient, depending on the project.
In the middle of the pit a floor drain with connection to the cable Lighting
network or a pump sump is to be provided. The water is to be The customer must comply with DIN 67528 »Artificial lighting
drained with a pump to be provided by the customer. From the of parking areas and parking houses« for the parking structure
pit corners/bearing surface of the lifting columns an incline to the lighting. The intensity of illumination in the pit and in the
floor drain/pump sump is necessary. maintenance manhole must be min. 80 Lux.
For reasons of environmental protection we recommend to paint
the pit floor, and to provide oil and petrol separators in the Ventilation
connections to the public sewage network. To achieve a constant exchange of air, reduce humidity, prevent
To divert large amounts of water from the court area, we condensation, and reduce vehicle moisture (due to rain, snow, ice,
recommend that the customer install a water drainage channel etc.), it is recommended that the customer consult specialized
around the periphery of the pit. engineers for heating, ventilation, and climate control and install
a ventilation system. This will reduce or prevent the hazard of
Marking corrosion and its attendant failures.
In compliance with DIN EN 14010, 10 cm wide yellow-black
markings compliant to ISO 3864 must be applied by the customer If the following are not included in the quotation, they will
to the edge of the pit in the entry area to mark the danger zone. also have to be provided / paid for by the customer:
– Mounting of contactor and terminal box to the wall valve, complete
Wall cuttings wiring of all elements in accordance with the circuit diagram
Any necessary wall cuttings according to page 2. – Costs for final technical approval by an authorized body
– Main switch
Operating device – Control line from main switch to hydraulic unit
The customer must provide a cable duct (Helfamin-tube) from
pit floor to operating device. The location of the control element Coating on the uppermost platform
must be specified according to the project (control stand, house Coating with asphalt or concrete:
wall, etc.). – Before filling the trough with concrete or asphalt, edge stripping
must be placed around the edges on site.
Installing vertical columns – Before filling, the trough must be lined with a water-impermeable
In general, a crane must be supplied by the customer for foil by a specialist company on site.
installation of the telescope columns. Coating with paving stones or turf grids:
Hook clearance min. 700 cm over access level, crane load – Before paving, the trough must be lined with a water-permeable
approx. 1400 kg. filter fleece by a specialist company on site.
MultiBase U3 | Code number 586.65.850-003 | Version 03.2018 Page 7 of 7
Page 1
Description Single platform (EB) and Double platform (DB)
Section
Dimensions General description: Lower platforms consisting of:
Multiparking system providing independent parking spaces for – Platform base sections
Car data
3 cars (EB), 2 x 3 cars (DB) one on top of the other each. – Adjustable wheel stops
Page 2
Dimensions are in accordance with the underlying dimensions of – Canted access plates
Width
parking pit, height and width. – Side members
dimensions
– Central side member [only DB]
The parking bays are accessed horinzotally (installation deviation ± 1 %). – Cross members
Vehicles are positioned on each parking space using wheel stops on – Screws, nuts, washers, distance tubes, etc.
Page 3 the right side (adjust according to operating instructions).
Hydraulic system consisting of:
Approach Operation via operating device with key interlock using master keys.
Load plan – Hydraulic cylinder
Operating instructions are attached to each operator's stand. – Magnetic valve
Multiparking system consisting of: – Hydraulic conduits
– Screwed joints
Page 4 – 2 telescopic lifting columns at rear with integrated hydraulic – High-pressure hoses
Pit cylinder (mounted to the floor) – Installation material
Paving – 2 telescopic lifting columns at front (mounted to the floor)
− 1 upper platform (for floor coating to be provided by the customer, Electric system consisting of:
e.g. sand layer/stone layer, please KLAUS Multiparking).
– Operating device (Emergency Stop, lock, 1master key per
Maximum weight of customer coating 250 kg/m2
Page 5
parking space)
Optional design with platform sheet metal plates from
Electrical
– Terminal box at wall valve
installation KLAUS Multiparking, against surcharge.
Technical − 3 lower platforms Hydraulic unit consisting of:
data
− 1 mechanic synchronization control system (to ensure
– Hydraulic power unit (low-noise, installed onto a console with a
synchronous operation of the hydraulic cylinders while lowering
Page 6 rubber-bonded-to-metal mounting)
and lifting the platform)
– Hydraulic oil reservoir
− 2 hydraulic cylinders
Tec. data
– Oil filling
To be perfor-
− Dowels, screws, connecting elements, bolts, etc.
med by the – Internal geared wheel pump
customer − The platforms and parking spaces are end-to-end
– Pump holder
accessible for parking!
Page 7 – Clutch
Description Upper platform consisting of: – 3-phase-AC-motor
– Contactor (with thermal overcurrent relay and control fuse)
– Covering plates
– Test manometer
– Side members
– Pressure relief valve
– Cross members
– Hydraulic hoses (which reduce noise transmission onto the
− Tray for customer coating, optional platform sheet metal plates
hydraulic pipe
from KLAUS Multiparking
– Screws, nuts