INSPECTION REPORT

1. Pump No. 016


a) Suction pipe inlet
✓ Vacum valve need repair
✓ Reposition pipe inlet
✓ Pipe condition corotin
b) Pump Recondition
✓ Replace impeller
✓ Replace Bearing ( 2ea )
✓ Replace shaft
✓ Replace gasket rubber front door & rear door folud
✓ Alignment
c) Hub Coupling
✓ Hub coupling not avaible ( hub coupling unit cannibal from pump no.
05 )
d) Engine ready
✓ Radiator need service

2. Pump No. 05
e) Suction pipe inlet
✓ Vacum valve need repair
✓ Reposition pipe inlet
✓ Pipe condition corotion
f) Pump Recondition
✓ Install shaft
✓ Install bearing ( 2ea )
✓ Install housing bearing
✓ Impeller installation
✓ Alignment
✓ Replace gasket rubber front door & rear door
g) Hub coupling
✓ Hub coupling take from pump no. 016
h) Engine
✓ Radiator need service
✓ Water pump not avaible

3. Pump No. 016

i) Suction pipe inlet


✓ Reposition pipe inlet
✓ Vacum valve need repair
✓ Condition pipe is corotion
j) Pump Recondition
✓ Replace impeller
✓ Replace shaft
✓ Replace bearing ( 2 ea )
✓ Replace rubber gasket front door & rear door
✓ alignment
k) Engine Ready
✓ Radioator need service

4. Pump No. 07

l) Suction pipe inlet


✓ Reposition pipe inlet
✓ Vacuum valve need repair
✓ Condition pipe corotion
m) Pump Recondition
✓ Leaking on mechanical seal ( Replace )
✓ Replace impeller
✓ Replace shaft
✓ Replace bearing ( 2 ea )
✓ Replace rubber gasket front door & rear door
✓ Alignment
n) Engine ready
✓ Radiator need service

➢ For pump no.016 the condition is ready to work, because it can be reached by 4 x 4
vehicle and for moving to inlet pip a lifting equipment device in the from of excavator
is needed
➢ For pump no.05, 06, 07. There is no reed access to the pump house. So it is not
possible to bring parts to the location and during pump work an excavator stand by
unit is needed to help lift
➢ Estimation work for 1 week/ unit