You are on page 1of 1

G3606 ENGINE RECONDITION

ACCOUNT 0960840 ARCHROCK EXCHANGE

Engine Overhaul Includes:  Replace Spark Plugs


 Cleaning all engine parts in a cleaning solution.  Inspect and reseal exhaust segments. Replace
 Inspection of crankshaft bolts.
 Replace heads with re-man to current  Level 1 Turbocharger Service
specification.  Inspection of cylinder block
 Clean/Inspect Pre-chamber Valves and upgrade  Rebearing and reseal wastegate
to latest specification.  Inspect front and rear gear train.
 Replace Pre-chamber check valves  Inspect camshaft and cam lifters
 Inspect/clean Pistons  Inspect vibration damper
 Inspect/clean Liners  Rebearing and reseal choke.
 Inspection of liner deck  Replace main fuel valve
 Inspect components during disassembly  Inspect flywheel ring gear
 Replace piston rings  Replace Exhaust blanket
 Inspection and polishing of connecting rods  Installation of gaskets and seals necessary to
 Install new rod bearings complete above repairs.
 Install new main bearings  Install new oil filters
 Install new thrust bearings  Load Test Engine
 Replace oil pump with Cat reman  Paint engine.
 Replace water pump with Cat reman
 Replace auxiliary water pump with Cat reman Available at additional cost:
 Recondition gas admission valves
 Replace front and rear crankshaft seals Caterpillar parts reusability specifications will be
 Replace oil thermostats with new used where applicable.
 Replace camshaft bearings Assumes all Caterpillar Cores meet Cat core
 Inspect rocker arm assembly acceptance policies.
 Replace rocker arm bushings
 Inspection and testing of aftercooler
 Inspection and testing of oil cooler
 Clean and inspect oil pump suction screen
 Inspect Lube Oil priority valve for proper
operation.

Warranty details are explained in our warranty policy available in our Service Department.
Call 713-460-7204 to request a copy.

You might also like