Professional Documents
Culture Documents
Engine breakdown
Engine disassembly
Install piston assy and renew 6 set ring piston and 12 pcs Rod bearing
Torque all bolt of cap con-ROD and tightenning properly
Install lock bolt of cap con-rod
Install all main hole cover and tightenning
Renew 6 gasket chamber head and clean
Install all cylinder head assy and lock bolt
Do torque sequence and makesure bolt tightenning
Install noozle assy and torque bolt
Install rocker arm assy and tightenning
Install all air starter valve assy and lock bolt
Install rocker housing assy and valve air over flow
Do adjustment valve and torque
Repair and install exhaust manifold assy
Install intake manifold and re gasket
Install all cooling pipe and renew gasket
Install aftercooler assy and makesure monting
Install heat exchanger assy and re gasket all pipe
Fill engine oil and air bleeding fuel system
Test toorent engine manual and makesure smooth rotation
Fill engine fresh water and leak monitoring
Install sea water pump assy and belting
Test engine pre-lube
Test perform of compressor air starter
Test running engine and monitoring engine for all leak
Suggestion :
Boy
( technician )