General Contractor - Trading - Marine Automation REPORT Komplek Ruko Puriloka Blok D No 7 Baloi Kota Batam Centre Batam Kepulauan Riau 29433 Phone : 0778 4163 290 Mobile : 0812 7659 7878Email : Esamasivteknik@gmail.com
To : BSSN Date : January, 3 2023
Attn : Mr Dede Location : Building
DESCRIPTION DATE REMARKS
January Showing Alarm MAINTENANCE DAY
3 2023 EXCEEDED ON Display Woordward Remote Panel Genset Both
CAUSED : Generator Sets Cannot online
When PLN Blackout
ACTION : Module Need To Reset Alarm
By Manual Direct To Display Module Or Use Woordward Interface Software
Location Building Genset BSSN
January Showing Alarm MAINTENANCE INTERVAL
3 2023 On deepsea Control Module On ATS Panel
ACTION : Need To Reset With Deepsea
Configuration Suite Software Interface Beetwen PC To Human Machine Interface
Location : Building Genset BSSN
Page 1
PT.ESA MASIV TEKNIK
General Contractor - Trading - Marine Automation REPORT Komplek Ruko Puriloka Blok D No 7 Baloi Kota Batam Centre Batam Kepulauan Riau 29433 Phone : 0778 4163 290 Mobile : 0812 7659 7878Email : Esamasivteknik@gmail.com
To : BSSN Date : January, 3 2023
Attn : Mr Dede Location : Building
DESCRIPTION DATE REMARKS
January Perform Connect Deepsea Configuration
3 2023 Suite To DSE 8620MKII Erase Or Clear Fault Code On Module
Also Check All Parameter Generator Sets
On The DSE Suites Then Makesure All OK
January The Result Is No Alarm Again On Deepsea
3 2023 Module Or Clear Module
Then Genset Can online Again When
PLN Blackout Page 2
PT.ESA MASIV TEKNIK
REPORT General Contractor - Trading - Marine Automation Komplek Ruko Puriloka Blok D No 7 Baloi Kota Batam Centre Batam Kepulauan Riau 29433 Phone : 0778 4163 290 Mobile : 0812 7659 7878Email : Esamasivteknik@gmail.com
To : BSSN Date : January, 3 2023
Attn : Mr Dede Location : Building
DESCRIPTION DATE REMARKS
January Perform Test Reset Diret To The Module
3 2023 Woordward easygen 2000
Then Clear Fault Code Or Make Module
back To Default Setting
Januari The Result Is No Alarm Or Faultcode
3 2023 Again On The Woordward Remote Panel
Then Generator Set Can Online Again
Or when PLN Blackout The Genset Can Runn Normaly Page 3