5 BUSHING, GIFFERENTIAL TO CASE the case bore (See Figure 89).
3 CONNECTOR. ELECTRICAL (7 WAY] °
38 Sex Sane 7. Install parking linkage if removed.
39 VENT ASSeMOLY, TRANSMISSION (See Figure 52).
100 ,FATER ASSEMBLY, TRANSMISSION OR Install new manual shaft seal, and tap
808 SEAL, MANUAL SHAFT
down with a 15mm deep socket.
—— 9, Install the final drive ring gear into
ae the lugs in the case
10, Install final drive ring gear snap ring
SE Sey into case groove, with the open end of
CASE ASSEMBLY the snap ring to the opening in case.
1, Clean case thoroughly with solvent and (See Figure 90).
dry case with compressed air. 11, Rotate transaxle to install final drive.
2. Inspect case for the following:
* Lug damage.
* Snap ring groove for damage.
% Servo bores for wear or damage.
®
Porisity in case casting.
Stripped threads in bolt holes.
3. Install the drive sprocket support and
torque bolts to 20 ft. lbs.
4, Install new converter seal with seal
driver No. J-28540.
5. Lubricate converter seal inner surface
with petrolatum.
AUTOMATIC TRANSMISSION SERVICE GROUP
59.ATSG Technical Service Information
6, Install final drive thrust bearing
onto final drive, (Black Side Up)
and retain with petrolatum.
7, Install final drive assembly into
transaxle, by rotating until it is
engaged in ring gear and sun gear.
8. Install the final drive housing onto
transaxle without the "0" ring, and
use only 2 bolts to retain it, as we
must remove it later on. We need it
in place now to hold final drive.
9. Install dial indicator with the tools
shown in Figure 92, and set to zero.
10. Lift speed sensor rotor with large
screwdriver to check final drive end
play, as shown in Figure 92.
11, Protect the speed sensor bore with a
piece of vacuum hose on screwdriver.
(See Figure 92).
12, Final drive end play should be .005"-
025",
13. Change final drive selective thrust
washer as necessary to obtain this
dimension.
14, Remove the dial indicator set-up and
install J-38358 and J-26958, along
with adapter J-26958-10, as shown in
Figure 94.
15. Turn the loading tool adjusting knob
until all final drive end play has
been removed.
16. Rotate transaxle to position shown in
Figure 95.
17. Make sure that final drive sun gear
shaft is fully installed into the
park gear and sun gear.
18. Install the forward band assembly in
the case making sure it is engaged on
the band anchor.
19, Install the thrust bearing onto the
final drive ring gear, with the black
side facing up (See Figure 95).
Case TeaceuissOT .
SAS Ascewout sormano TN
SHAR Arnal Onive SUN GEAR
Figure 95
AUTOMATIC TRANSMISSION SERVICE GROUP
61Technical Service Information
872,
738005
PINION END PLAY 0.23-0.61mm 1,009".
(026°). CHECK WITH FEELER GAGE
572 CARRIER ASSEMBLY, INPUT
875 CARRIER ASSEMBLY. REACTION
Figure 97
3 CASE, TRANSMISSION
677 BUSMING, REACTION SUN GEAR (LEFT HANO}
878 GEAR. OFUM BUSHING ASSEMBLY. REACTION SUN
879 BUSHING, REACTION SUN GEAR IRIGHT HANOI
880 SAND ASSEMBLY. 2/1
RACE, 1/2 SUPPORT (INNER)
RING. SNAP (1/2 ROLLER ASSEMBLY)
ROLLER ASSEMBLY, 1/2 SUPPORT
SPACER. 1/2 SUPPORT.
888 SEARING ASSEMBLY, THRUST ASSEMBLY:
ce
688 BUSHING, 1/2 SUPPORT
87 RACE, 1/2 SUPPORT (OUTER
igure 96
1-2 ROLLER CLUTCH AND SUPPORT ASSEMBLY
1. Using tool J-38385, as shown in Figure
96, install the 1-2 roller clutch and
support by lowering into the case. :
2. CAUTION: The 1-2 roller clutch/support | 4.3 SASE, TRANSMISSION
assembly does not ALWAYS go all the way | $91 SeanING ASSEMBLY, THAUST
down. Lift up on the forward band just | $72 CARRIER ASSEMBLY, INruT CommeTs
SAM INPUT CARRIER TO REACTION CARRIER
enough to let the support fall all the | 74 searing asséwavt: THRUST INPUT!
eavadowy cal the beste, 75 CARRIER ASSEMBLY, REACTION COMPLETE
3. Install the 2-1 manual band into case, | $76 staring ASSEMBLY, THRUST REACTION CARRIER
ensuring that it is located on the band SUN'GeAA
anchor pin.
4, Install the reaction sun gear and drum
assenbly, by rotating into position.
a ed id if Figure 98
The lugs MUST engage with the 1-2 roller
clutch inner race.
5. The reaction sun gear and drum should
freewheel counterclockwise, and lock
and turn forward drum clockwise.
AUTOMATIC TRANSMISSION SERVICE GROUP
oTechnical Service Information
ASSEMBLE GEAR TRAIN
1, Inspect both input and the reaction
carriers for wear or damage (See
Figure 98).
2. Check for excess pinion gear end
play with a feeler gage (See Fig-
ure 97).
3. Proper pinion gear end play should
be .009"'-.024".
4, Install the plastic lube dam into
the input carrier inner bore
5. Install thrust bearing (674) onto
input carrier, as shown in Figure
98, and retain with petrolatum.
6. Install reaction carrier into the
input carrier by rotating into
position.
7. Install thrust bearing (676) into
reaction carrier, as shown in Fig-
ure 98, and retain with petrolatum.
8. Thrust bearing (671) in Figure 98,
is a "Trapped" bearing, and cannot
be removed.
9. Install both carrier assemblys at
the same time by rotating into
position, ensuring that the reac-
tion carrier is engaged onto the
splines of the final drive sun
gear shaft
10. Install the reverse reaction drum
onto the input carrier and ensure
that it is engaged on the splines.
13 FORWARD SERVO COVER
14 FORWARD SERVO COVER "0" RING SEAL.
15 FORWARD SERVO PIN "E" CLIP
16 FORWARD SERVO PISTON
17 FORWARD SERVO SPRING RETAINER
18 FORWARD SERVO PISTON "LIP" SEAL
19 FORWARD SERVO CUSHION SPRING
20 FORWARD SERVO CUSHION SPRING RETAINER
21 FORWARD BAND APPLY PIN
22 FORWARD SERVO RETURN SPRING
104 MANUAL 2-1 SERVO COVER
105 FORWARD SERVO SQUARE CUT SEAL
124 FORWARD SERVO APPLY PIPE
687 1-2 ROLLER CLUTCH SUPPORT ASSEMBLY
688 FORWARD BAND ASSEMBLY
ee
Figure 99
AUTOMATIC TRANSMISSION SERVICE GROUP
8