PROVISION OF EPCC FOR WATER INJECTION BOOSTING
STATION BOOSTING UPGRADE CIVIL
INSPECTION AND TEST PLAN


CONTENTS
1.0 Earth Work ------------------------------------------------------------------ 2
2.0 Concrete Work -------------------------------------------------------------- 5
3.0 Fence and gate--------------------------------------------------------------- 11
4.0 Grouting---------------------------------------------------------------------- 14

ATTACHMENT:

HFY3-3-1-1 Inspection checklist Earthwork Excavation… ………. ..…15


HFY3-3-1-2 Inspection checklist Earthwork Backfilling………….....…….17
HFY3-3-2-1 Inspection checklist formwork &reinforcing steel………..…...19
HFY3-3-2-2 Inspection checklist concrete pouring………………………..20
HFY3-3-2-3 Inspection checklist anchor bolt& embedded items…………22
HFY3-3-7 Inspection checklist fence &gate……………….…...……23
HFY3-003-9 Inspection’s daily report grouting works………....…....…….24

HFY3-3-5-3 Inspection checklist Doors and windows……………….…...26

HFY3-3-5-4 Inspection checklist Roof water proofing……………….…...27

HFY3-3-5-5 Inspection checklist painting and decoration………………...29

CL-C-01 Checklist of foundation coating…………………...………..…31


CR-C-01 Level Record……………………………….………….……..32
CR-C-02 Coordinate Record…………………………….…….....…….33
CR-C-03 Excavation Record……………………………….….…..…...34
CR-C-04 Foundation Survey Record……………………….……...…..35
CR-C-05 Material Inspection Record……………………….…..……...36
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


DISCIPLINE:CIVIL DESCRIPTION OF WORK : CIVIL WORK SITE INSPECTION & TEST PLAN HFY3-3720-CIV-ITP-0001

COMMENTS DEFINITION OF INSPECTION AND TEST PLAN SYMBOLS APPLICABLE TO ALL SIGNATORIES

S-CON = Sub-Contractor
CPECC = China Petroleum Engineering Construction Corporation
PMC: Project Management Consultant

“H” - HOLD: A point beyond which work shall not proceed without formal approval by the appropriate inspection. Contractor shall
notify the COMPANY / PMC and raise RFI.

“W” - WITNESS: A point beyond which work may proceed without formal documented approval by any of the inspection.
Achievement of “W” points shall be notified to PMC in accordance with the contract.

"S" - SURVEILLANCE: A point where CPECC and others may carry out surveillance of work in progress and documentation associated on
an unscheduled basis, with no notification required by any party and without amendment to the scheduled
production program.

“R” - REVIEW: The documents are to be submitted to the appropriate inspection for review by PMC. Note that where a document is
subject to CPECC/PMC approval, work shall not proceed until CPECC/PMC approval is given.

REMARKS:

1
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: EARTH WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT
Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
1 Earth works
1.1 All drawings shall conform to Construction drawings
Construction procedures W R
latest approved edition. of civil engineering

1.2 All backfilling materials shall


conform to design drawings. Any Construction drawings HFY-Checklist-3-1-1 H R
backfilling materials which are Construction procedures HFY-Checklist-3-1-2
unsuitable shall be individually piled. of civil engineering CR-C-01
CR-C-02
CR-C-03
1.3 All excavation shall be performed CR-C-04
either by machines or by hand in a Construction drawings CR-C-05
Construction procedures H S
safe manner. Final excavation shall be of civil engineering
done by hand.

1.4 Materials, such as deleterious


material, trees, roots and vegetations Construction drawings W S
etc. that are not suitable for backfilling, Construction procedures
shall be removed from site and of civil engineering
delivered to the designated area.

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S –Surveillance R –Review

2
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE: CIVIL DESCRIPTION OF WORK: EARTH WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
1.5 Filling material shall be of optimum Construction drawings H W
water content and shall be Construction procedures
of civil engineering
compacted in layers. After that,
field density tests shall be
performed.
HFY-Checklist-3-1-1
Construction drawings HFY-Checklist-3-1-2
1.6 OMC, MDD & Sieve Analysis for Construction procedures CR-C-01 H R
the soil to be backfilled. of civil engineering CR-C-02
CR-C-03
CR-C-04
CR-C-05
1.7 Foundation shall be compacted. Any Construction drawings
places where are over-excavated shall Construction procedures
be backfilled to designed level and of civil engineering H W
compacted accordingly.

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

3
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: EARTH WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN

Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT


Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
1.8 While excavation is being done, Construction drawings W S
care shall be exercised to avoid Construction procedures
of civil engineering
damaging existing underground
utilities.

1.9 Excavation shall be done with Construction drawings W S


Construction procedures
sufficient working space. HFY-Checklist-3-1-1
of civil engineering
HFY-Checklist-3-1-2
1.10 Chances of movement of CR-C-01
required material within site shall be CR-C-02
reduced. Safety operation on Construction drawings CR-C-03 W S
Construction procedures
excavation site shall be ensured. CR-C-04
of civil engineering
Do not pile too much excavated CR-C-05
material on both sides of pipe trench
so as to avoid over loading.

1.11 Materials that can not be used


Construction drawings
shall be delivered to the designated Construction procedures W S
area. of civil engineering

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

4
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT
Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2 2 concrete 2.1.1 Batch Plant Qualification & Construction drawings
work Trial Mix Design( For each Concrete Construction procedures H R
of civil engineering
Grad)

2.1concrete Construction drawings H W


material and 2.1.2 Blinding Concrete and Water Construction procedures
of civil engineering HFY-Checklist-3-2-1
mixing design Proofing material shall conform to
approved drawing and specifications. HFY-Checklist-3-2-2
CR-C-05
Construction drawings H W
2.2.1 Spacers, clean, align and level Construction procedures
2.2formwork formwork edges shall conform latest of civil engineering
edition of approved drawings.

Construction drawings
2.2.2 Materials should be approved Construction procedures W S
and are in good conditions. of civil engineering

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

5
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT
Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2.2.3 Reinforcement concrete cover Construction drawings
shall conform to approved drawings Construction procedures W W
of civil engineering
and specifications.

2.2.4 Contact surface between form- Construction drawings W S


Construction procedures HFY-Checklist-3-2-1
work and concrete shall be smooth
of civil engineering HFY-Checklist-3-2-2
without any deficiencies or
CR-C-05
unevenness.

W S
2.2.5 Clean-out shall be available on Construction drawings
Construction procedures
form-work. of civil engineering

2.2.6 Formwork shall be firmly Construction drawings H W


supported and movement of form Construction procedures
of civil engineering
work shall be avoided while casting
concrete.
Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

6
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT
Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2.2.7 Release agent used for form Construction drawings W S
work shall conform to design Construction procedures
of civil engineering
requirements.

2.2.8 Debris shall be removed from Construction drawings W S


forms. Construction procedures
of civil engineering
2.3 Steel bar 2.3.1 Steel bars provided by supplier Construction drawings HFY-Checklist-3-2-1
construction shall conform to the requirements of Construction procedures HFY-Checklist-3-2-2 H W
design drawings. of civil engineering CR-C-05

2.3.2 Steel bar shall have correct size,


Construction drawings
shape, spacers and bent radius Construction procedures H W
conforming to design requirements. of civil engineering

2.3.3 Steel bar installation shall be Construction drawings


according to approved design Construction procedures H W
drawings and shall be firmly tied. of civil engineering
Steel bar shall be supported in an
approved way.

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

7
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2.3.4 All embedded items shall Construction drawings H W
conform to the requirements of design Construction procedures
of civil engineering
drawings, and shall be checked and
approved.

HFY-Checklist-3-2-1
2.4.1 Concrete grade and Slump, Construction drawings H W
2.4 Concrete temperature & vibration
Construction procedures
shall of civil engineering HFY-Checklist-3-2-2
Pouring and conform the approved drawing and HFY-Checklist-3-2-3
CR-C-05
Cube Casting specification.

2.4.2 The size, elevation & Construction drawings


coordinates of Anchor Bolts & Construction procedures
Embedded items installation shall of civil engineering H W
conform the drawing and
specification.

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

8
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2.4.3 During concrete pouring, Construction drawings H W
concrete cube specimens should be Construction procedures
of civil engineering
prepared on site.

2.4.4 To complete the preparation of Construction drawings


HFY-Checklist-3-2-1
specimens and tests, compressive Construction procedures W S
strength shall be tested with cube
of civil engineering HFY-Checklist-3-2-2
specimens.

2.4.5 It is not allow to adding water Construction drawings


Construction procedures
to concrete to change its slump on of civil engineering
W W
site.

2.4.6 Concrete shall be placed with Construction drawings


Construction procedures
proper equipment and pouring heights of civil engineering
W W
shall be according to specified
requirements.
Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S –Surveillance R –Review

9
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: CONCRETE WORKS HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
2.4.7 Concrete vibration shall be Construction drawings W S
performed in accordance with Construction procedures
of civil engineering
construction specification and design
requirements.

2.4.8 Concrete shall be cured with Construction drawings W S


Construction procedures HFY-Checklist-3-2-1
methods required by contract. curing of civil engineering
HFY-Checklist-3-2-2
for 7 days.
CL-C-01

Construction drawings
2.5 2.5.1 Underground part of concrete Construction procedures H S
Foundation shall be painted bitumen anticorrosion of civil engineering
Coating layer.

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

10
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: FENCE AND GATE HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
3 fence and gate 3.1.1 All material for fence and Construction drawings W W
3 3.1Material gate shall be according to design Construction procedures
of civil engineering
requirements.

W S
Construction drawings
3.1.2 Surface which metallic Construction procedures HFY-Checklist-3-7
members are in contact with soil of civil engineering CR-C-05
shall be corrosion protective.

Construction drawings
3.2Construction 3.2.1 Construction drawings shall be Construction procedures W S
the latest approved edition. of civil engineering

Definitions of Inspection & Test plan Symbols: H –Hold W –Witness Point S –Surveillance R –Review

11
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: FENCE AND GATE HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
3.2.2 Post Installation with Construction drawings W S
Concrete Foundation as per design Construction procedures
of civil engineering
drawing.

3.2.3 Chain link fencing. Construction drawings W S


A)Tension wires shall be correctly Construction procedures
of civil engineering
installed and properly tightened. HFY-Checklist-3-7
B)Wire mesh for chain-link fencing
shall be properly tensioned and shall CR-C-05
be of correct height.

Construction drawings
3.2.4 Installation of Barbed Construction procedures W S
Wire, Razor Wire & Top Rail of civil engineering
shall conform the design drawing
and specification.

Definitions of Inspection & Test plan Symbols: H –Hold W –Witness Point S –Surveillance R –Review

12
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE INSPECTION
DISCIPLINE:CIVIL DESCRIPTION OF WORK: FENCE AND GATE HFY3-3720-CIV-ITP-0001
& TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT

Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY


ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
3.2.5 Blast Cleaning, Painting & Construction drawings W S
Installation of Gate shall conform to Construction procedures
of civil engineering
design requirements.

3.2.6 Galvanized corrugated plate


fencing Construction drawings
Construction procedures
of civil engineering
a) Posts erection shall conform to HFY-Checklist-3-7
design requirements. CR-C-05 W S

b) Corrugated plate shall be securely


fixed to the posts in plumb and level.
A certain space shall be required
between bottom of plate and ground.

Construction drawings
3.2.7 Final walk down should Construction procedures
W S
be performed. of civil engineering

Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

13
PROVISION OF EPCC FOR WATER INJECTION STATION
BOOSTING UPGRADE CIVIL INSPECTION AND TEST

CPECC WATER INJECTION BOOSTING STATION UPGRADE


SITE
DISCIPLINE:CIVIL DESCRIPTION OF WORK: GROUTING INSPECTION & HFY3-3720-CIV-ITP-0001
TEST PLAN
Date: Prepared By: CPECC QC DEPARTMENT Approved By: CPECC QC DEPARTMENT
Item Inspection Activity and Specific Acceptance Criteria, Verifying RESPONSIBILITY
ACTIVITY
No. Check Point Area Code & Standard Document CONTRACTOR PMC
4.1 Ensure the material for grouting as per W R
the project specification and approved by
the OWNER. Material certificate attached.
4.2 Ensure the Formwork (water-tight) for W W
grouting is in good condition as
requirement.
4.3 Ensure the equipment/anchor bolts is R
installed as per the approved drawings, and W
4 4 Grouting accepted by QC and the OWNER/PMC HFY-Checklist-003-9
before grouting. Construction drawings CR-C-05
4.4 Ensure the area/pockets for grouting is Construction procedures
clean and fully wet for cement grouting of civil engineering W R
material without any foreign materials. The
surface is prepared as per the specification
as applicable.
4.5 Ensure the grouting is mixed and W R
placed as per the vendor recommendation
and specification.
4.6 Ensure a good curing is maintained. W R
4.7 Cube Casting & Curing
Cube Crushing for 7 days & 28 days. W R
Definitions of Inspection & Test plan Symbols: H -Hold W -Witness Point S -Surveillance R –Review

14
,QVSHFWLRQ&KHFNOLVW
($57+:25.(;&$9$7,21
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ/LQH $UHD/RFDWLRQ
6SHF5HIHUHQFH+)<*(1&,963([FDYDWLRQ%DFNILOO &RPSDFWLRQ

,QVSHFWRU V&KHFNOLVW
6U ,QVSHFWRU V2EVHUYDWLRQ
'HVFULSWLRQRI$FWLYLW\
 5HFRUGWKH'DWD

 Yes No
$YDLODELOLW\RI':*
 $)&GUDZLQJ 6SHFDYDLODEOHDWVLWH

6XUYH\LQJ
 6XUYH\VHWWLQJRXWGRQHDQGH[FDYDWHGDUHDPDUNHG  Yes EŽ
6XUYH\UHSRUWDWWDFKHG 

([LVWLQJ8QGHUJURXQG)DFLOLWLHV
5HIHUULQJWRVLWHJHQHUDOVXUYH\DQGUHFRUGGRFXPHQWVLV  Yes No
WKHUHDQ\H[LVWLQJ8*IDFLOLWLHV"
 ,I\HV2QH$OORIWKHIROORZLQJDFWLRQKDVEHHQ Yes No Explain:
WDNHQ8*IDFLOLWLHVZHUHGHWHFWHGH[SRVHGE\PDQXDO ……………………………………………….
H[FDYDWLRQSURWHFWHGDQGRUUHORFDWHG

:DWHU/RJJLQJ
 $UHDSUHYHQWHGIURPVXUIDFHZDWHU
 Yes EŽ

%DUULFDWLRQ 6DIHW\6LJQV
 %DUULHUVDQGVDIHW\VLJQVSURYLGHGDURXQG([FDYDWLRQ  Yes EŽ
DUHD

'HFLVLRQRI'XPSLQJ$UHD
 'XPSLQJ$UHDIRUH[FDYDWHGPDWHULDOVGHFLGHGDQG  Yes EŽ
DFFHSWHG

4XDUDQWLQH8Q6XLWDEOH6RLO
 6XLWDEOHDQG8QVXLWDEOHVRLOVHSDUDWHGDQGVWRFNHGDW  Yes No NA
WKHGHVLJQDWHGDUHDV

15
'H:DWHULQJ
'HZDWHULQJV\VWHPLQVWDOOHGDQGJURXQGZDWHUGLVFKDUJHG
  Yes No NA
WRDSSURYHGDUHD

'HSWK 3URILOH  Yes No


 ([FDYDWLRQGRQHDFFRUGLQJWRWKHGHSWKVDQGSURILOHV
VKRZQLQWKH'UDZLQJ

2YHU([FDYDWLRQ
2YHUH[FDYDWLRQWUHDWHGDVSHUVSHFLILFDWLRQ
 )LOOZLWKDSSURYHGPDWHULDOLQOD\HUVDQGGR  Yes No NA
FRPSDFWLRQ22 5
)LOOEOLQGLQJIRUVWUXFWXUHV

 Yes No NA
3URWHFWLRQGXULQJ'HHS([FDYDWLRQ
3URWHFWLRQIRUGHHSH[FDYDWLRQSURYLGHGLQFOXGHRQH
 DOORIWKHIROORZLQJ Speci fy Wha t Acti on Ta ken:

6ORSH6LGH%UDFLQJ6KHHW3LOH …………………………………………………………

6XIILFLHQW([FDYDWLRQ
([FDYDWLRQVIRUVWUXFWXUHVVKDOOEHH[WHQGHGIRUD 
 VXIILFLHQWGLVWDQFHUHTXLUHGIRUSODFLQJDQGUHPRYLQJRI Yes No NA

VKXWWHULQJVFDIIROGLQJDQGIRULQVSHFWLRQ

+6(3UHFDXWLRQV
 (QVXUHWKDWDIWHUH[FDYDWLRQDUHDVKDOOEHFOHDQHGDQG  Yes No NA
DOO+6(SUHFDXWLRQVDUHWDNHQSODFH

1 R W H  &KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR&RQWUDFW
UHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU VUHFRPPHQGDWLRQV :KHUH
UHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

&RQWUDFWRU 30&
1DPH
'DWH

6LJQDWXUH

16
,QVSHFWLRQ&KHFNOLVW
($57+:25.%$&.),//,1*
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ/LQH $UHD/RFDWLRQ
6SHF5HIHUHQFH+)<*(1&,963([FDYDWLRQ%DFNILOO &RPSDFWLRQ

,QVSHFWRU V&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ :ULWH1$LI1RW$SSOLFDEOH

5HFRUGWKH'DWD

$YDLODELOLW\RI$)&':*
  Yes EŽ
$)&GUDZLQJ 6SHFDYDLODEOHDWVLWH

5HPRYDORI0XGG\6RLO
 0XGG\6OXVK\VRLOQHHGWREHUHPRYHG'H:DWHULQJPD\  Yes No NA
QHHGLIZDWHUWDEOHLVKLJK

 Yes No
(OHYDWLRQ (YHQQHVV
6XUYH\ZRUNVIRUDOLJQPHQWHYHQQHVVDQGHOHYDWLRQVRIWKH Speci fy a vera ge l a yer
 SUHYLRXVDQGQHZOD\HUVGRQHDQGFKHFNHG 6XUYH\UHSRUW
DWWDFKHG  THK:……………………………… mm.

&RPSDFWLRQRI3UHYLRXV/D\HU
 3UHYLRXVOD\HUFRPSDFWLRQWHVWGRQHDQGSDVVHG"  Yes EŽ
5HSRUWDWWDFKHG"

4XDOLILHG $FFHSWHG6RLO
*HQHUDOILOOLPSRUWHGIURPWHVWHGDQGDFFHSWHGERUURZSLWV 
 3URFWHUWHVWGRQH DQGIUHHIURPYHJHWDWLRQRUJDQLF
Yes No NA

PDWHULDOV UXEELVK

17
(QJLQHHULQJ)LOO
 (QJLQHHULQJILOOVWRFNHGLQEDWFKHVDUHSUHVHQWDWLYH  Yes No NA
VDPSOHWDNHQWHVWHGDQGDFFHSWHG 3URFWHUWHVWGRQH

7KHFRPSDFWHGILOOPL[HGZLWKDFOHDQZDWHUIUHHIURPRLO
  Yes EŽ
JUHDVHRUJDQLFDQGVXVSHQGHGILQH

0RLVWXUH&RQWHQWV
  Yes EŽ
7KHILOOPRLVWHUZHOOFRQWUROOHGZLWKLQWKHRSWLPXP0&

(TXLSPHQWIRU&RPSDFWLRQ
 $VXLWDEOHFRPSDFWRUVW\SHVYLEUDWRU\LIUHTXLUHGWREH  Yes EŽ
XVHGZLWKDVXIILFLHQWQXPEHURISDVVHV

 Yes No
)'7
 $)LHOG'HQVLW\7HVWFDUULHGRXWDVSHUVSHFLILFDWLRQ
Speci fy FDT : ……………………...

/RDG%HDULQJ7HVW
 /RDG%HDULQJ7HVWWREHFDUULHGRXWSULRUWRSURFHHGIRU  Yes EŽ
+HDY\)RXQGDWLRQV

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWV
REOLJDWLRQWR&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW
0DQXIDFWXUHU VUHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQ
EHDGGHGWRWKHFKHFNOLVW

&RQWUDFWRU 30&

1DPH
'DWH

6LJQDWXUH

18
,QVSHFWLRQ&KHFNOLVW
)RUPZRUN 5HLQIRUFLQJ6WHHO
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),1R
,QVSHFWLRQ7LPH 6WDUW )LQLVK ,QVSHFWLRQ'DWH
'ZJ/LQH /RFDWLRQ-RLQW
3&+6SHFLILFDWLRQ5HIHUHQFH1R+)<*(1&,963
,QVSHFWLRQ&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLWL 6WDWH1$LIQRWDSSOLFDEOH

5HFRUGWKH'DWD
5HLQIRUFLQJ6WHHO
පzĞƐ පEŽපEͬ
7HQVLOH7HVW
 7HQVLOH7HVWFRQGXFWHGUHLQIRUFLQJVWHHO"
Steel Gra de ...................................
:KDWLVWKHUHTXLUHGJUDGHRIUHLQIRUFLQJVWHHO"
Yi el d Stres s ..................................
&RQFUHWH&RYHU &OHDQOLQHVV
 (QVXUHWKHFRQFUHWHFRYHUDVSHUGUDZLQJVSHF පzĞƐ පEŽපEͬ
(QVXUHWKDWWKHUHEDUVDUHFOHDQDQGQRWUXVW\
5HEDU6L]H 6SDFLQJ
 ,VUHEDUVL]H VSDFLQJDVSHU$)&'ZJ" පzĞƐ පEŽපEͬ
,IQRW&RQWUDFWRUWRVKRZWKHGRFXPHQWZLWKDSSURYHGFKDQJHV

)RUPZRUN
%RUH+ROH7HVW *HR7HFKQLFDO6XUYH\
 %RUH+ROH7HVWV *HR7HFKQLFDO6XUYH\5HSRUWQHHGWREHUHYLHZHG පzĞƐ පEŽපEͬ
HVSHFLDOO\IRU+HDY\)RXQGDWLRQV
6XUIDFH&RQGLWLRQ
 )RUPVXUIDFHVKDOOEHVPRRWKFOHDQHGRIGLUWPRUWDUHWF පzĞƐ පEŽපEͬ
,UUHJXODULWLHVGDPDJHVLQIRUPVVKDOOQRWH[FHHGPP
'LPHQVLRQ7ROHUDQFH
 (QVXUHGLPHQVLRQVDUHDVSHU$)&'ZJDQGZLWKLQWROHUDQFHOLPLWV
පzĞƐ පEŽපEͬ

$OLJQPHQW 3OXPEQHVV
 (QVXUHWKDWKRUL]RQWDODOLJQPHQW 9HUWLFDOSOXPEQHVVDVSHUGUDZLQJ
පzĞƐ පEŽපEͬ

5LJLGLW\ $QFKRUDJHRI)RUPZRUN
)RUPZRUNLVULJLGO\DQFKRUHGZLWKVXSSRUWVEUDFLQJWLHURGVDQG
 VFDIIROGLQJWRSUHYHQWPRYHPHQWGXULQJFRQFUHWHSRXULQJ පzĞƐ පEŽපEͬ
)RUPZRUNVXIILFLHQWO\WLJKWWRSUHYHQWOHDNDJH
7LHURGKROHVVKDOOEHILOOHGZLWKDSSURYHGPDWHULDOWRILOO
FRPSOHWHGGHSWK
&KDPIHU
 $OO(GJHV &RUQHUVVKDOOKDYHFKDPIHU PP[°
පzĞƐ පEŽපEͬ

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR&RQWUDFW
UHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU VUHFRPPHQGDWLRQV :KHUH
UHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

&2175$&725 30&
1DPH
'DWH
6LJQDWXUH 19
,QVSHFWLRQ&KHFNOLVW
&RQFUHWH3RXULQJ
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),1R
,QVSHFWLRQ7LPH 6WDUW )LQLVK ,QVSHFWLRQ'DWH
'ZJ /RFDWLRQ-RLQW1$
3&+6SHFLILFDWLRQ5HIHUHQFH1R+)<*(1&,963&RQFUHWH 5HLQIRUFLQJ6WHHO

,QVSHFWLRQ&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ 6WDWH1$LIQRWDSSOLFDEOH

5HFRUGWKH'DWD
0L['HVLJQ %DWFK3ODQW&RQWURO පĂ ƚĐŚWů Ă Ŷƚsŝ Ɛ ŝ ƚĞĚ
(QVXUHWKDWWKHVXSSOLHGFRQFUHWHLVDVSHUDSSURYHGPL[GHVLJQ
1 $QGWKHEDWFKSODQWGHYLFHVDUHFDOLEUDWHG
පĂ ƚĐŚWů Ă ŶƚEŽƚsŝ Ɛ ŝ ƚĞĚ
%DWFK3ODQW9LVLWGRQH"

Speci fy the s l ump & tempera ture ra nge:


&RQFUHWH7HPSHUDWXUHLQ+RW:HDWKHU
2 &KHFN&RQFUHWH7HPSHUDWXUHVKRXOGQRWEHPRUHWKDQ GHJUHH 1. Concrete Temperature : …... ° C

2. weather Temperature : Ma x. Mi n

&RQGXLWV&RQGXFWRU3LSH RWKHU(PEHGGHG,WHPV
3 (PEHGGHG,WHPVRIRWKHUGLVFLSOLQHV FRQGXLWVJURXQGLQJHWF KDYH පzĞƐ පEŽපEͬ
EHHQFKHFNHGE\UHODWHGGLVFLSOLQHHQJLQHHUV

6OXPS s l ump:
4 0RQLWRULQJZRUNDELOLW\RIFRQFUHWHDQGZDWHUFHPHQWUDWLR VOXPS
from to
WHVW

)UHTXHQF\RI&RPSUHVVLYH6WUHQJWK7HVW
(DFKWHVWVKDOOFRQVLVWRI&XEHVIRUGD\V IRUGD\V How ma ny cubes ca s ted? :
0LQLPXP2QHWHVWIRUHDFK&XELF0HWHUSODFHG
5 0LQLPXP2QHWHVWIRUHDFKW\SHRIFRQFUHWHSODFHGRQDQ\GD\
…………………………………………..
0LQLPXPRQHWHVWIRUVWUXFWXUDOFRPSRQHQWVSRXUHGE\RQHEDWFK
RIFRQFUHWH

20
Delivery Time : Roughly how much ave. time to deliver the
6 Concrete mus t be del i vered a nd poured from the truck mi xer or a gi ta tor truck concrete?
wi thi n 45 mi n hr a fter mi xi ng of wa ter, cement a nd a ggrega te. ……………… Minutes
Pouring Height / Segregation:
7 Concrete mus t be poured wi th proper equi pment a nd pouri ng hei ght s ha l l not පK<පEŽƚK<
be more tha n 2 meters to a voi d a ny s egrega ti on.
Vibrators:
^ƉĞĐŝĨLJƚŚĞEŽ͘ŽĨsŝďƌĂƚŽƌƐƵƐĞĚ͗
8 Ens ure tha t concrete i s properl y vi bra ted.
………………………………………………………
Check how ma ny workable vi bra tors contra ctor ha s a rra nged.

&RQFUHWH)LQLVK
9 &RQFUHWHVKDOOEHJLYHQDVXUIDFHIORDW)LQLVKDVSHUGUDZLQJVSHFV පzĞƐපEŽපEͬ
,QKRWZHDWKHUVKDOOEHVWDUWHGDVVRRQDVSRXULQJLVFRPSOHWH

Burlap & Plastic Sheet Covering:


Specify the material used to cover the
1. Immedi a tel y cover the concrete wi th burl a p.
10 2. Spri nkl e s pra y wa ter on burl a p
concrete:
……………………………………………………
3. Cover burl a p wi th pl a s ti c s heeti ng to protect from eva pora ti on

Note : Checklist is not all inclusive and must not relieve Contractor of its obligation to Contract requirements (Specifications, Codes and Standards,
Equipment Manufacturer's recommendations). Where relevant or applicable, other activities can be added to the checklist.

&2175$&725 30&
1DPH
'DWH
6LJQDWXUH

21
,QVSHFWLRQ&KHFNOLVW
$QFKRU%ROWV (PEHGGHG,WHPV
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),1R
,QVSHFWLRQ7LPH 6WDUW )LQLVK ,QVSHFWLRQ'DWH
'ZJ /RFDWLRQ
3&+6SHFLILFDWLRQ5HIHUHQFH1R+)<*(1&,963

0DWHULDO&KHFN 6SHFLI\WKH*UDGHRIVXSSOLHGPDWHULDO
&KHFNWKH$QFKRU%ROWV (PEHGGHG,WHPVDUHRIDSSURYHGPDWHULDO
$QFKRU%ROWVVKDOOFRQIRUPWR $QFKRU%ROWVĂĂĂĂĂĂ
1 $670) Ă

2WKHU(PEHGGHGLWHPVVKDOOFRQIRUPWR$670$ (PEHGGHG,WHPVĂĂĂĂĂĂĂ
6L]Hƶ2.
7\SH 6L]H ƶ1RW2.
2 9HULI\WKH6L]H 6KDSHRIDQFKRUEROWVDUHDVSHUGUDZLQJ
6KDSHƶ2.
7KUHDG3URWHFWLRQ Speci fy wha t i s us ed for threa d protecti on:
3 &KHFNWKH*UHDVH3ODVWLF&DSKDVEHHQDSSOLHGRQWKHWKUHDGVRI ප'ƌĞĂ Ɛ ĞĚŽƌ
$QFKRU%ROWV පWů Ă Ɛ ƚŝ ĐŽǀĞƌ

5LJLGLW\ $QFKRUDJHRI(PEHGGHG,WHPV
(QVXUHDOOHPEHGGHGLWHPVDUHVHFXUHO\DQFKRUHGVRWKDWQR
4 PRYHPHQWGXULQJFRQFUHWHSRXULQJ පK<පEŽƚK<
$QFKRU%ROWVVKDOOEHULJLGO\VHFXUHGZLWKWHPSODWHDWWRS
$QFKRU%ROWVVKDOODOVREHVHFXUHO\IDVWHQHGDWERWWRP

'LPHQVLRQDO&KHFN
5 &KHFNWKH(OHYDWLRQ&RRUGLQDWLRQ 3URMHFWLRQRI$QFKRU%ROWVDV පK<පEŽƚK<
SHUGUDZLQJ

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWV
REOLJDWLRQWR&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW
0DQXIDFWXUHU VUHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQ
EHDGGHGWRWKHFKHFNOLVW

&2175$&7254& 30&

1DPH
'DWH

6LJQDWXUH

22
,QVSHFWLRQ&KHFNOLVW
)HQFH *DWH
' RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5 ),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ $UHD/RFDWLRQ
3&+6SHFLILFDWLRQ5HIHUHQFH1R+)<*(1&,963&)HQFH *DWH

,QVSHFWRU V&KHFNOLVW
6U ,QVSHFWRU V2EVHUYDWLRQ
'HVFULSWLRQRI$FWLYLW\
 5HFRUGWKH'DWD
(QVXUHWKDW)HQFH)DEULF3RVWV7RS5DLOV&RXSOLQJ
 ([WHQVLRQ$UPV7UXVV5RGV6WUHWFKHU%DUV1XWV%ROWV7LH පK<පEŽƚK<
:LUH%DQGV )LWWLQJVVKDOOEH+RW'LSSHU*DOYDQL]HG

(QVXUHWKDW)DEULFVKDOOEH&KDLQ/LQNW\SHPPPHVK
 ZRYHQZLWK1RJDXJHZLUH
පK<පEŽƚK<

3LSHIRU7RS5DLO 7UXVV5RGVVKDOOEHJDOYDQL]HGPPGLH
 SLSH
පK<පEŽƚK<

%DUGHG:LUHVKDOOEHWZLVWHGSDLURI1RJDXJHDOXPLQLXP
 FRDWHGZLUH
පK<පEŽƚK<

(QVXUHWKDW5D]RU:LUH&RLOVKDOOQRWWRRPXFKVWUHWFKHG
 &RQWUDFWRUPD\ZDQWWRVDYHWKHUD]RUZLUH
පK<පEŽƚK<

(QVXUHWKDW3RVWVDUHSOXPEHGDQGDUHULJLGZLWKFRQFUHWH
 IRXQGDWLRQ
පzĞƐ පEŽ

*URXQGLQJ
$OOSRVWVDQGEDUEHGZLUHVVKDOOEHJURXQGHGDVSHU
IROORZLQJ
 JUHHQLQVXODWHGFRQGXFWRUVDWWDFKHGWRPP/[ පzĞƐ පEŽ
PP'GULYHQJURXQGURG
3RVWVDQGEDUEHGZLUHVVKDOOEHERQGHGE\DSSURYHG
HOHFWULFDODWWDFKPHQW

1 RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR
&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU V
UHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKH
FKHFNOLVW

&2175$&7254& 30&

1 DPH
' DWH

6LJQDWXUH 23
,QVSHFWRU V'DLO\5HSRUW
*URXWLQJ:RUNV
'RFXPHQW++ )<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ $UHD/RFDWLRQ
6SHF5HIHUHQFH+)<*(1&,9636SHFLILFDWLRQIRU*URXWLQJ

,QVSHFWRU V&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ 5HFRUGWKH'DWD
 6SHFLI\1$,I1RW$SSOLFDEOH

0DWHULDO,QVSHFWLRQ ƶ<HV
 ,VWKH*URXW0DWHULDO$SSURYHG ƶ1RW

':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
$YDLODELOLW\RI$)&':* ĂĂĂĂ
 (QVXUH,)&'UDZLQJVDYDLODEOHDWVLWH

$SSURYDORI'LVFLSOLQH(QJLQHHU3ULRUWR*URXW
3ODFHPHQW
ƶ<HV
 ,QVWDOODWLRQRI6WDWLRQDU\5RWDWLQJ(TXLSPHQW%DVH3ODWHV
ƶ1RW
(OHFWULFDO(PEHGPHQW
,VLW&KHFNHGDQGVLJQHGE\GLVFLSOLQH(QJ"

/DLWDQFH5HPRYDO
ƶ2.
 6XUIDFHLVFKLSSHGWRUHPRYHODLWDQFHDQGH[SRVHWKH
ƶ1RW2.
DJJUHJDWH

+U6RDNLQJ &OHDQOLQHVV
6RDNLQJපK<පEŽƚK<
(QVXUHWKHDUHDSRFNHWVIRUJURXWLQJLV&OHDQDQGIXOO\
 6RDNHGIRU+UV'RXEOH&KHFNPDQXIDFWXUHULQVWUXFWLRQVIRU
ů ĞĂ Ŷŝ ŶŐ͗පK<පEŽƚK<
VRDNLQJWLPH

:DWHU7LJKW)RUPZRUN
:DWHU7LJKWපK<පEŽƚK<
 &KHFN)RUPZRUN:RUNLV:DWHU7LJKW
ŚĂ ŵĨĞƌ͗පK<පEŽƚK<
$&KDPIHUPP;LIUHTXLUHG

7HPSHUDWXUH&KHFN
&KHFN$PELHQW *URXW7HPSHUDWXUHLV2.DVSHU0DQXIDFWXUHU $PELHQW7HPSĂĂĂĂĂĂĂ
 5HFRPPHQGDWLRQV 9HQGRU VUHFRP7HPSĂĂĂĂĂĂĂ
,FHVKDOOEHXVHGWRFRROWKHZDWHULQKRWZHDWKHU

24
6SHFLI\WKHJURXWWKDWKDVEHHQXVHG
0L[LQJ5DWLR
 (QVXUHWKH0L[LQJ5DWLR *URXW3ODFHPHQWDVSHU0DQXIDFWXUHU
ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
7HFKQLFDO/LWHUDWXUH ĂĂ

3URWHFWLRQGXULQJ&XULQJ
ƶ2.
 (QVXUHWKHJURXWLQJDUHDLVSURWHFWHGIURPDQ\GDPDJHGXULQJ
ƶ1RW2.
FXULQJSHULRG

&XULQJ +RZPDQ\GD\VFXULQJWREHFRQWLQXHG"
(QVXUHFXULQJLVPDLQWDLQHGDVSHU9HQGRU7HFKQLFDO
 /LWHUDWXUH ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
(QVXUHWRFRYHUHGZLWKKRVVDLQEXUODS ĂĂĂ

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR&RQWUDFW
UHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU VUHFRPPHQGDWLRQV :KHUH
UHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

&RQWUDFWRU 30&
1DPH
'DWH
6LJQDWXUH

25
,QVSHFWLRQ&KHFNOLVW
'RRUV:LQGRZV
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ/LQH /RFDWLRQ-RLQW
6SHF5HIHUHQFH
,QVSHFWRU V&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ 6WDWH1$LIQRWDSSOLFDEOH

5HFRUGWKH'DWD
':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
$YDLODELOLW\RI$)&':* ĂĂĂĂĂĂ
 $UH$)&'UDZLQJVDYDLODEOHDWVLWH"

ƶ<HV
0DWHULDO,QVSHFWLRQ
ƶ1R
 $OOWKHPDWHULDOVWREHXVHGIRUFRQVWUXFWLRQDUHDVSHU
VSHFLILFDWLRQVDQGGUDZLQJVDQGDSSURYHGE\RZQHU30&
5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
0HWDO)UDPHLQVWDOODWLRQ
ƶ1R
 7KHPHWDOIUDPHVVKDOOEHFKHFNHGDJDLQVGDPDJHVEHIRUHEXLOW
LQWRZDOOVDQGDUHLQVWDOOHGWUXHWRFRUUHFWSOXPEOHYHO
5HPDUNV
ƶ<HV
&RUUHFW:DOO7KLFNQHVV
ƶ1R
 7KLFNQHVVJDXJHDQGW\SHRIGRRUVDQGZLQGRZDUHFKHFNHG
5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
*ODVV )O\6FUHH
ƶ1R
 7KLFNQHVVDQGW\SHRIJOD]LQJ GRXEOHJODVV LVFKHFNHGDQG
DSSURYHGIO\VFUHHQVDUHLQVWDOOHG
5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
&KHFN'RRU/RFNV/DWFKHV+DQGOHV+LQJHV:HDWKHU6WULSSLQJ ƶ1R
 DQG'RRU6WRSSHUVVKDOOUHTXLUHDSSURYDO
5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
$OORSHQLQJVHFWLRQVWRGRRUVDQGZLQGRZVDUHILWWHGZLWK ƶ1R
 DSSURYHGZHDWKHUVHDOVDQGFKHFNHGIRUZDWHUDLUWLJKWQHVV
5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR
&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU V
UHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

&2175$&725 30&
1DPH
'DWH

6LJQDWXUH 26
,QVSHFWLRQ&KHFNOLVW
5RRI:DWHU3URRILQJ
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ/LQH /RFDWLRQ-RLQW
6SHF5HIHUHQFH

,QVSHFWRU V&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ 6WDWH1$LIQRWDSSOLFDEOH

5HFRUGWKH'DWD

':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
$YDLODELOLW\RI$)&':*
 $UH$)&'UDZLQJVDYDLODEOHDWVLWH"
ĂĂĂĂĂĂ

ƶ<HV
0DWHULDO,QVSHFWLRQ
ƶ1R
 $OOWKHPDWHULDOVWREHXVHGIRUFRQVWUXFWLRQDUHDVSHU
VSHFLILFDWLRQVDQGGUDZLQJVDQGDSSURYHGE\RZQHU30& 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

6ORSH 7KLFNQHVVRI6FUHHG
ƶ<HV
(QVXUHFRQFUHWHVFUHHGOD\HULVFRPSOHWHGLQ
ƶ1R
 DFFRUGLQJWRWKHGUDZLQJVDQGWKHVORSHQRWOHVVWKDQ
7KHVFUHHGWKLFNQHVVVKDOOQRWEHOHVVWKDQPP 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

ƶ<HV
%LWXPHQ&RDW
ƶ1R
 (QVXUHWZROD\HUVRIELWXPHQFRDWVDVSHUGUDZLQJVLV
DSSOLHGRYHUWKHURRIVFUHHG 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

,QVXODWLQJ%RDUG ƶ<HV
(QVXUHWKHSRO\VW\UHQHWKHUPDOLQVXODWLRQERDUGVDUH ƶ1R
 SURSHUPDNHDQGDUHLQVWDOOHGDVSHUGUDZLQJVDQG
PDQXIDFWXUHU VUHFRPPHQGDWLRQV 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

ƶ<HV
0RUWDU0L[
ƶ1R
 (QVXUHFHPHQWDQGVDQGPRUWDUOHYHOOLQJFRXUVHUDWH
 DVSHUGUDZLQJLVPLQPPWKLFNQHVV 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

(3'0:DWHU3URRI0HPEUDQH
(QVXUHWKHKLJKSRO\PHUPRGLILHGELWXPLQRXVZDWHUSURRI ƶ<HV
PHPEHU (3'0 ZLWKPLQLPXPWKLFNQHVVPPDUH ƶ1R
 LQVWDOOHGDVSHUGUDZLQJVDQGPDQXIDFWXUHU V
UHFRPPHQGDWLRQVDQGFKHFNHGIRUKROORZQHVVEXEEOHV 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
HWF
27
6FUHHGWR3URWHFW0HPEUDQH ƶ<HV
3URWHFWLRQOD\HULVVSUHDGRYHUWKH(3'0ZDWHUSURRI ƶ1R
 PHPEHUDQGLVHQVXUHGWKDWLWSHQHWUDWHVDQGVHDOVWKH
VXUIDFHSURSHUO\ 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

ƶ<HV
)ORRG7HVW ƶ1R
 7KHURRIVWUXFWXUHLVIORRGWHVWHGDQGOHDNLQJ VORSH
DUHDVDUHFRUUHFWO\UHSDLUHG 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR
&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU V
UHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

&2175$&725 30&
1DPH
'DWH

6LJQDWXUH

28
, QVSHFWLRQ&KHFNOLVW
3DLQWLQJDQG'HFRUDWLRQ
'RFXPHQW+)<&KHFNOLVW
5HSRUW 35,' 3URMHFW1DPH &RQWUDFWRU
5),
,QVSHFWLRQ
6WDUW )LQLVK ,QVSHFWLRQ'DWH
7LPH
'ZJ /RFDWLRQ
6SHF5HIHUHQFH1LO

,QVSHFWRU V&KHFNOLVW
,QVSHFWRU V2EVHUYDWLRQ
6U
'HVFULSWLRQRI$FWLYLW\ 6WDWH1$LIQRWDSSOLFDEOH

5HFRUGWKH'DWD

0DWHULDO,QVSHFWLRQ3DLQW
$OOWKHSDLQWLQJPDWHULDODUHDFFRUGLQJWRVSHFLILFDWLRQV ':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
DQGGUDZLQJVDQGDSSURYHGE\RZQHU30&(QVXUHDOO ĂĂĂĂĂĂ
 PDWHULDOVDUHVWRUHGDVRZQHUDSSURYHGPDQXIDFWXUHUV
UHFRPPHQGDWLRQVDQGDOOGDPDJHGRURXWRIVSHFLILFDWLRQ 6SHFĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
PDWHULDOVDUHTXDUDQWLQHGDVSHU3&+3URFHGXUH+)<)& ĂĂĂĂĂĂĂ
303'

':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
0DWHULDO,QVSHFWLRQ7LOHV
ĂĂĂĂĂĂ
$OOWKHWLOHVPDWHULDOVDUHDFFRUGLQJWRVSHFLILFDWLRQV
 GUDZLQJVDQGWLOHVVDPSOHVDOUHDG\DSSURYHGE\ 6SHFĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
RZQHU30& ĂĂĂĂĂĂĂ

':*ĂĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
ĂĂĂĂĂĂ
$YDLODELOLW\RI$)&':*V
 $UH$)&'UDZLQJVLVDYDLODEOHDWVLWH"
6SHFĂĂĂĂĂĂĂĂĂĂĂĂĂĂ
ĂĂĂĂĂĂĂ
ƶ<HV
$SSURYDORISURFHGXUH
ƶ1R
 7LOHVLQVWDOODWLRQSURFHGXUHLVDOUHDG\DSSURYHGE\
RZQHU30& 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

&RORU&RGLQJ ƶ<HV
(QVXUHWKDWWKHRZQHUFRORUFRGLQJVSHFLILFDWLRQVLV ƶ1R
 IROORZHGE\FRQWUDFWRUDQG30&DSSURYHGWKHW\SHRI
SDLQWLQJ 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
1RRI&RDWV
ƶ1R
 &KHFNDQGFRQILUPWKHUHTXLUHGQXPEHUVRISDLQWFRDWV
DSSOLHG
5HPDUNV
6XUIDFH3UHSDUDWLRQ 3URWHFWLRQRIVXUURXQGLQJV ƶ<HV
(QVXUHDOOVXUIDFHVWRUHFHLYHGHFRUDWLYHILQLVKHVDUH ƶ1R
 SUHSDUHGFRUUHFWO\DQGDOOVXUURXQGLQJQRQGHFRUDWLYH
DUHDVDUHSURWHFWHG 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

ƶ<HV
0RUWDU0L[5DWLR
ƶ1R
 0RUWDUVDQGFHPHQWUDWLRDQGWKLFNQHVVRIWKHPRUWDUEHG
DUHDVSHUGUDZLQJV
29 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
7LOH3DWWHUQ ƶ1R
 &KHFNDQGFRQILUPWKH3DWWHUQRIWLOHVLV2.IRUOD\LQJ
5HPDUNV
ƶ<HV
+ROORZ6RXQG7HVW
ƶ1R
 +ROORZ6RXQG7HVWVKDOOEHFDUULHGGXULQJLQVSHFWLRQRI
WLOHVZRUNV 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
)DOVH&HLOLQJ +DQJHU5RGV$SSURYDO
ƶ1R
 &KHFNWKHW\SHRIIDOVHFHLOLQJKDQJHUURGVDUHDV
SHUDSSURYHGGUDZLQJ 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB
ƶ<HV
2ZQHU,QVSHFWLRQDW)LQDO6WDJH
ƶ1R
 (QVXUHWKDWDILQDORZQHU30&LQVSHFWLRQRIGHFRUDWLYH
ILQLVKLQJLVFDUULHGRXW 5HPDUNVBBBBBBBBBBBBBBBBBBBBBBBBB

1RWH&KHFNOLVWLVQRWDOOLQFOXVLYHDQGPXVWQRWUHOLHYH&RQWUDFWRURILWVREOLJDWLRQWR
&RQWUDFWUHTXLUHPHQWV 6SHFLILFDWLRQV&RGHVDQG6WDQGDUGV(TXLSPHQW0DQXIDFWXUHU V
UHFRPPHQGDWLRQV :KHUHUHOHYDQWRUDSSOLFDEOHRWKHUDFWLYLWLHVFDQEHDGGHGWRWKHFKHFNOLVW

& 2175$&725 30&

1DPH
'DWH

6LJQDWXUH

30
Check List of Foundation Coating
CL-C-01

Project No: Record No.:


Job Name: Location:
Drawing No.: Date:
ITEM ACTIVITY YES NO
Before the construction, the first grass on the surface of the
1 gray skin with a knife to remove, with a broom to dust, sand
and other debris clean.
If oil, apply wire brush and sandpaper to brush off.
2 The base surface must be flat, the depression should be filled
with cement putty.
When painted bitumen, the temperature of concrete surface
3 should be satisfy vendor request.
Anti-coating without a drum, cracking, Alice and other
4 defects.
REMARKS:

Contractor PMC Engineer


Name
Signature
Date

31
Level Record
CR-C-01
Drawing No. Record No.
Project Work Area
Control Point No. Control Point Elevation
Elevation ±0.000 Survey Instrument
Date Climate sunny
Backsight Foresight Elevation Backsight Foresight Elevation
No. Remark No. Remark
mm mm m mm mm m
1
2
3
4
5
6
7
8
SKETCH

Engineer QC Engineer PMC Engineer


Name

Signature

Date

32
Coordinate Record
CR-C-02

Project Record No.


Subject Work Area
Control Point East (m) North(m) Constructor
Survey
Instrument
Date
Climate
Drawing Number

North Azimuth
Point No. East (m) Distance (m) Remarks
(m) o ` "
SKETCH

Engineer QC Engineer PMC Engineer


Name
Signature
Date

33
PROVISION OF EPCC FOR WATER INJECTION BOOSTING STATION
UPGRADE CIVIL INSPECTION AND TEST PLAN

Trench Excavation Record


CR-C-03
Project Record No.
Trench Parameter Trench Parameter
Point No. Point No.
Depth (m) Width (m) Distance From Start Point Depth (m) Width (m) Distance From Start Point

Remarks:

Engineer QC Engineer PMC Engineer


Name
Signature
Date

34
PROVISION OF EPCC FOR WATER INJECTION BOOSTING STATION
UPGRADE CIVIL INSPECTION AND TEST PLAN

Foundation Survey Record


CR-C-04

Project Record No.


Subdivision Works
Drawing No.: Work Area: Name:
Controlling Point Controlling Point
Elevation ±0.00 :
Stake No.: Elevation:
Survey Electronic total Actual
instrument Climate:
Instrument: Leveling instrument surveying date:
Designed Actual Coordinate Elevation REMARK
Coordinate Stiff
Coordinate Difference Difference
(concrete plate
(concrete center) (mm) Designed Measured (mm)
Ite Surveying
Point No. Elevation Elevation Yes/No
ms
(m) (m)
N E N E + ˉ
ᶭN ᶭE

Engineer QC Engineer PMC Engineer

Name

Signature

Date

34
3 4
PROVISION OF EPCC FOR WATER INJECTION BOOSTING STATION
UPGRADE CIVIL INSPECTION AND TEST PLAN

Material Inspection Record CR-C-05


Project Record No.
Material Grade/ Mill Test Inspection Result
Item Material Description Pages MFG No.
Manufacturer Certificate No Dimension Quantity Physical Accept Reject Hold

Remarks:

Engineer QC Engineer PMC Engineer