_PROMAG brcer inns Mh.
PROJECT EIGHTEEN - ISLAMABAD
‘Construction of Chster C&D Gray
Working Pakage: Structure Works including Embedded MEP
| INSPECTION REQUEST (i) Scene z
Rho: EUTETWAGLcaDSwaster
REY:
SECTONA
ALL NSPECTON REQUESTS 9HOULD BE SUBWETTED TO RESIENT ENGINEER. BY 18.6 Ws THEO
CT veentecar cw D1 Meehan General
| Osun TF seveturat Cletectrcat
Daserpton af Works tobe Inapoctod |
Inspection of PCC (1:8) Under SOG at vila #221 A) listo
‘Submited Oat:
Pouring / Activity Date
“Submited by:
Received by:
wsvecrororicis Concvele
sareeron fret
a lashes SertelZ
eh ana oma Bape mo EA
‘Gopy wih Seaton A completed by Conasior i be passed io Eagrear by 76.00 fre tha day before planned i
Original with Section B completed o be handed i Engineer ovat Insp
Engineer o compete Section C fasiarcanerttio. vA
‘hacking ans approval bythe Enger sa oa he Coir hs
PROMAG (PVT) LTD.Structural Level - Cluster C Villa 22 - 1 Kanal A
ove tr st2ibim 4
eg | Fewronerisssigeoim ¢PROMAG
ASTRAL
Work Package: Consruction of Guster C& D Grey Srocure Works coding
Embedded MEP Works
‘Contract No: 1-TECHISB-
Quality Management Procedure
Gen-a0s
Docarsen
Quality check for Concrete Works,
Torben
VeD2D
eee tinaler C7
sr. fo ‘uatty check care mea | Comacor | constant
cha ied a vc aa?
«fewest tre cots pment epee De
aia core co al
2 {handle the pour including a sufficient number of —
[vibrators and backups? 7 “ae
t
|All roquired tools, equipment and materials are of |
3 |appraved source and quality? Co eee
4 |altmateriats are available in required quantity? we wa
~ [tas the concrete mix design been approved by The
5 [ensinee = co -
6 | —
se? a“ ae
foe Avs Oy |
a a
owings AN Ne
> fetesrnsnd strc chrtg paves? | aa
i Rico 2
aoc Lae Ln
Ce abc Nfs Me | Nie
2 |ropeoved? Aly “py Afb
bea eave Hata gpe aca i,
1 |snamsonapamtng ts page eters
mon Nip th | Alyy
14 etn oth op suas bing roughed tr rope Pr
lbondage wit the newly poured concrete Nip No
aeons No BAC | n/n16 |e cnctetop tee vecringto the doings?
i c ae
17 pre resin ed at ste? | 2 -
he wna tones bang coated =
18 according to specifications? ae a
tp cone apart cncee der
49 | avaabe at ste? Mention stump of concrete ia a eet
ste empernaeofcncere wihinalowbie
20 This ¢} 4 F oll a
carr cn rg aed ry Yo
22 feo standards and specifications for 7 to 28 days co
|testing. ae
son et of cone beng maine
2 |fetween am om? ae fe
scons af conte ag doe repro
23 | avoid segregation? er oa a
24 |isvecor of used quantity of concrete bine kent? | ~~ C |
{Are records being kept forall eylinder/cube a
25 | strength test results? “| <—
26 {Is curing being done properly? ae
cana Far