You are on page 1of 7
DETAILS OF INSPECTION {RL WSPECTON REQUESTS SHOULD BE SUBMITTED TO RESIENT ENGINEER BY 6.0 Ha THE DAY BEFORE THE PLANNED TNE OF RSPEGTION CA peetectut WH ca Co mecnanest (5) Gane Chserey sweat Di etectrcat ‘Deseription of Works tobe Inapected Inspection of days concrete compressive strength of yiners (900098) of SOG casted on 1307-25 in Vila #31/31A(0.5k ACB) Custer. \CocationClusier B Relevant Drawing Nos orerscem) | RWATION OF CONTRACTOR'S GATOC INSPECTION eatin of sodinan a onplne wih peer, spewed rah Neos Siena ad Gully CaP Os TO no Ne: nan Conformity andor reference toatlached Non Conformiy Repo NER) WA? [Signed by the Contractors QAIGC Engineer ‘i ENGINEERS INSPECTION COMMENTS: ‘euatuae ate nT soaane Pepe Mer innpeerar T_Accoptea —_ [Accepts subject to Commonts Oy wotaccoota [7 eae Date: ime ue Set fe te Sen Sa a IT crafalhSctn Doma wisest ep Sted nown sae coustniaa Gos anny ern nen boo Het enn pace one (Srniadtes npc, WGC We ane te a rapecton PROMAG ASTRAL AMAB CD survey sent etetteat | Relevant Orawing Nos Submitted Date: aus Pouring! Activity Dat ‘aul29 | Subd by Yasir Mehmood | Rosa by. o7Mee8 seh (CONFIRMATION OF CONTRACTOR'S QA/QC INSPECTION 2 onlimatin of perdaton and somone wi spucieatins, approved drawing, NatiodStaerer and val Cera ‘Signed by the Contractors GAIOC Engineer: “ENGINEERS INSPECTION COMMENTS: wngnouaw Concorde CBave PS) Paral clone. Peeled leigh ey Pr. hightltecd Ce EE ere) eee aR wwramvonee byt J and 28 — ee ir (corer Pb lesval badjom kee 7 asl 2 Pp qo “Copy ih Section A completo by Conracorto | Ofginal wth Sostion B complete to be handed t|Enginaer prior Inspection | | Engineer to compiataSocton Carcrtum to Contter—y .eys eh | Chackng an approval y he Sage shalt lo {150-THK. $LAB UIN.O Structural Level - Cluster D Villa 31 & 31A - 10 MARLAS plot EF 528.189 pana Ra FL 4828-140 nO FFL 55 140 gg fats 08140 7 — ta | Sei HICK Fey 2 oh | Astrat Work 7chage Canatucion of Custer =“€& 0 Grey Stare Wars aang Contac a: B-ECHSB> Quality Management Procedure Quality hack for Concrete Works nae. 7 Vid SYM a oni PO ERRMEL 4 Cowofi) FSC 2 mane the pour ila sulitert number of |voraorsandbackuss! Xe ify che Sis | contractor | constant : hc ce a [the schedulers equred to know the weather 4 [ovrastor the coereteglacement peaton cu no speraion eck tho weston orca ca 2 before plaoningcancret? [thar adequate monpowa and equpmant te 7 atrequred tots, equipment and marerals ar of Isaorove veces iy? | ___|fiasthe concrete mix design Geen approved by_ i + fosenaet i 7 larawings. an “ eowigs wige (acing o stnerean approved source ofbackup ready mix sea afterconeeting? 10 feancretainace he naering nto ising a [nachine matuntions? a have proper arrangements been made for hat 7 21 eather cavern? 4 isthe eintorenmant ane Frmworknepection o approves? a [embeded its ke water topper eects 13 [conduits and phambing ters plugged aa es proven colun starter prasent salt ee of honey 14 | ombing wen top surace beng raughed for proper bondage wth the newly poured concrete tg [ste plumb ofthe turn benacneekes Deore Ic PPesbeingused at? [tne wonany of conrete beng cantotes imesrez ch 3 ccoringto specfestions “ a Sslumocone appara cnet per a [ovate a ste? wertion sma cf concrete p_[Bihetammeaturof caer withinaowste [ve conreeeynde abe tana ea 2s [scoring te sandacts ane speciemion fo? 23a testa (stop eign of canerts beng manana 22 Teena seta 2m? Is compaction of concrete teinadone poner © ve sereraton? 24 |srocontof sea cuanaty of conrate ben kat? SIN IN IAN ININER IAT \ bre ecarseing kept fr al inderfebe frenes est esuts? 26 lscurngbeing done propery? ammo Tom ‘san ona ta 2 CONCRETE COMPRESSIVE STRENGTH ntasm caseaon) =~ PROMAG ASTRAL Project; Construction of Cluster ~ C & D Grey Structure Works including Embedded MEP Works Casting Date: 13-Jul-2023 IR No 07 days: 5161 Concrete Class: 3000|Psi _|IR No 28 days: ‘Structure SOG Villa # 31/31A Cluster # D Lab No: 735 Specimen Testing Age. eat Machine Comp.Strength NO. Date (Days) Guting | Reding (KN) (Psi) : 280 2,306 1 — 2 20-Jul-2023 z 182.4 295 7 298 Required Strength For 07 Days (70%) Achieved Average Strength For Days} 7 | 78% Remarks | Luo Srctisfactiny Contractor: Consultant: Signature Lab Tech: ‘Signature :

You might also like