You are on page 1of 9
site Details: Cluster G2 Purpose of Handing over: Const EIGHTEEN Islamabad Name of Supervision Consultant: Promag {pvt td ‘Name of Contractor: M/s Astral ontractor’s Acknowledgement/Confiemation The Contractor M/s Astral hereby acknowledge Taking ova Construction of villas (Grey Structure) at Cluster G2 (12 Villa thelr work without any interruption, subject purpose Le 3.2522 and they can stare The following are being shared as part ofthis Site Handing cori » Attachment 1: Site photos depicting the site cn > Attachmane 2 List of Current status of aach villa, + sitachment 3: Building Coordinates/ Affection Plan. Attachment # Attached Schedule for Benchmark Det (0/s Principal and The Supervision Consultane (ll acernazorst > Attachment 5: Drawings fr infrastructure & Roads design for coordination aura onsrah gloss signa hy oth the Controctor the Engineer ofice For any discrepancy or issue related to the shared Benchmarks, the Contracar shal in within 2 working days after the issuance ofthis certificate. Refer to the attachments as sted for required details regarding the site and ether provisions. Me i. Since the 1's in the enclosed Affection plan drawings are tentative. ferefore, the final EF of ‘may be check and proposed by the subject works Contractor in coordination with the Golf anc iris lavas and submit the same to the Engineer office for final aparoval i. Astral receive the site without any obstacles and this dated Sit a commencement date for construction ofthe 12 vil For and on behalf of M/s Astral Pvt. Ltd, Vill # 106 Page tof 4 Villa #88 Page 20f4 Villa #92 Page 3 of Villa # 109 Page 40f 4 Cluster 62-42 Villas (Handing over in asteal fen 20PL). Villa Murmber Villa category : _ c1e-088 ‘kana 18-080 ‘Kanal Twe8 Svat aocaren| one ~ Solumns done? 16-080 4 Kana Tyee 3 ttvaneconent | oe mast ot6.0s2 4 Kora Types facet (TEES coum 16-003 4 Kanal Type | Reng wal anereemeny soe |" Benerantcaunaa CLG-095 2 Kanal TyoeA | Retainieg wall reinforcement . a Baan Canine co. 2 Kana pee ‘anya raneonent | ‘ore Basenoni Colma ete.100 2 Kana ‘ype 8 a en Sosonan Calan dre] cte-108 2 Kanal “yea feta wal force | ove Satna Ca Tre] custo7 2 Kanal “ype fran wal etoconent [Fen one Sesonon Colin done] cic-108 2 Kanal ‘ype faring wal aororent ‘ove Gesonor Cour done? ct6-109 2 kena Type fering wal retoconent oe EIGHTEEN PROJE } CLUSTER "G" 1 LEVELS & COORDINATES SHEET PLAN CLUSTER "G" BENCH MARK EAST NORTH LeveL | NEAR PLOT 0 | | 3195949.088 | 1045909.577 | 524.593 3195982,652 | 1045791,396 | 519.653 6-034 _319994.323 | 1045687.764 | S21494 6-073,074 | at96085.491 | 1048705,750 | 520.072 G-047,048 4196113.111 | 1045709.204 | 521.318] 6016, Go29 6 | cp-04 | 3196132.054 | 1045640.553 | 520.201} 6-113, G-085 7 | cp-o5 | 3196193565 | 1045707.411 | 522418 | — G-l1, G-087 @ | cp-06 | 3196061.735 | 104se22.221 | $20812 | — G-002,6-018 9 | cp-o7 | 3196136.073 | 1045530.191 | 518.937 | 6123, 6124 qo | cp-o8 | 3196324.151 | 1045559.017 | 518920 | 6-097,6-100 ia | cp-o9 | 3196351.212 | 1045466150 | 518.010 G-097,6-150 qa | cp-10 | 3196255.818 | 1045390.269 | 515813 G-145,6-180 33 | cp-11 | 3196210.513 | 1045490.200 | 516973 G-154,6-172 44 | cP-42 9196122.522 4045609.642 | 525.181) 2ND SLAB=G-113 45 | cP-413 3196144.223 1045659.659 | 522.531 ‘STORE SLAB=¢ 085 | 16 o _ ; 7 ~ ‘APPROVED

You might also like