CLIA Analyzers Installation Training Acceptance Report
Hospital Name
Instrument Admin Admin’s Phone
Instrument Model Instrument S.N.
Distributor Installed Date
If the following training contents are confirmed to be fully understood and correctly used by the
customer, please give approval (√ means executed).
Trainer Trainees Trainees
Training Contents
Confirm Confirm Signature
1. Structure of the instrument □ □
2. Working procedure □ □
3. Classification of the rack □ □
4. Specifications of the sample tube □ □
5. Reagent configuration □ □
6. Reagent preparation, loading and unloading □ □
7. Calibration and QC procedure □ □
8. Routine and Emergency sample test □ □
9. Results review/search/transmit □ □
10. Sample rerun/dilute/check □ □
11. Consumables loading and replacement □ □
12. Substrate loading and unloading □ □
13. Alarm analysis and handling □ □
14. Equipment maintenance □ □
15. Machine switch operation on holidays □ □
16. Precautions □ □
17. Operation demonstration □ □
18. Q&A □ □
Suggestions
Assessment □ Excellent □ Good □ Acceptable □ Unsatisfied
Date Finished Time
Trainer Signature Phone Lab Director
Page 1 of 1