0% found this document useful (0 votes)
264 views1 page

CLIA Analyzer Training Report

This document is a training acceptance report for installing CLIA analyzers at a hospital. It details the training contents covered and requires signatures from the trainer and trainees to confirm the training was fully understood and the equipment can be correctly used.

Uploaded by

Ajun Junaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
264 views1 page

CLIA Analyzer Training Report

This document is a training acceptance report for installing CLIA analyzers at a hospital. It details the training contents covered and requires signatures from the trainer and trainees to confirm the training was fully understood and the equipment can be correctly used.

Uploaded by

Ajun Junaidi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

CLIA Analyzers Installation Training Acceptance Report

Hospital Name

Instrument Admin Admin’s Phone

Instrument Model Instrument S.N.

Distributor Installed Date


If the following training contents are confirmed to be fully understood and correctly used by the
customer, please give approval (√ means executed).

Trainer Trainees Trainees


Training Contents
Confirm Confirm Signature
1. Structure of the instrument □ □

2. Working procedure □ □

3. Classification of the rack □ □

4. Specifications of the sample tube □ □

5. Reagent configuration □ □

6. Reagent preparation, loading and unloading □ □

7. Calibration and QC procedure □ □

8. Routine and Emergency sample test □ □

9. Results review/search/transmit □ □

10. Sample rerun/dilute/check □ □

11. Consumables loading and replacement □ □

12. Substrate loading and unloading □ □

13. Alarm analysis and handling □ □

14. Equipment maintenance □ □

15. Machine switch operation on holidays □ □

16. Precautions □ □

17. Operation demonstration □ □

18. Q&A □ □

Suggestions

Assessment □ Excellent □ Good □ Acceptable □ Unsatisfied

Date Finished Time

Trainer Signature Phone Lab Director

Page 1 of 1

You might also like