Hospital Name Instrument Admin Admin’s Phone Instrument Model Instrument S.N. Distributor Installed Date If the following training contents are confirmed to be fully understood and correctly used by the customer, please give approval (√ means executed).
Trainer Trainees Trainees
Training Contents Confirm Confirm Signature
General 1. Introduction to the whole instrument structure and buttons □ □
Introduction 2. Check before startup and switch on / off operation □ □
3. Instrument operation: sample registration, different operation
□ □ mode, result review, sample loading and unloading 4. Pre-analytical Precautions: sample collection process, □ □ placing time, preparation before operation. 5. Usage and setting of software: host software, DMU, CMU □ □ *, slide maker and stainer* General 6. Reagent replacement: reagent replacement process on Operation analyzer, reagent and slide replacement process of slide □ □ maker and stainer* 7. Result Check: introduction to sample check process, meaning of alarm flags, meaning of scatter chart and □ □ histogram, handling of abnormal samples. 8. Re-exam rules introduction: implementation method, setting □ □ method and modification. 9. Quality control: L-J QC setting (special number setting), QC QC target value and SD establishment, QC operation and □ □ Operation precautions,QC result viewing 10. QC out of control judgment and handling methods □ □
11. Detection principle of instruments: principle of each
Working □ □ detection channel;Reagent function principle 12. Clinical significance: report parameters, research parameters □ □
13. Simple troubleshooting □ □
Maintenance 14. Maintenance: daily maintenance of analytical instrument, □ □ daily maintenance of slide maker and stainer*
Suggestions
Assessment □ Excellent □ Good □ Acceptable □ Unsatisfied
Date Finished Time
Trainer Signature Phone Lab
第1页 共2页 Director Note: * For CAL series user training only