NO. EQUIPMENT NAME MODEL inverter, auto transfer switch (ATS), and load device, thus it should be
Solar Power Generation Experiment equipped with controlling system devices.
KTE-7000SG (4) (Option) AUTO control adjusting part (SQ or PLC control)
Equipment
2. This equipment is composed of console type, so wherever it can be
I. IMAGE available in commercial power supply.
3. Device should be composed of banana plug contactor for saving circuit
configuration time.
4. The power conversion device and the control panel should be connected as
vertical type.
5. When over production of electric power, it should transmit power to
commercial electricity, when low production of electric power, it should get
transmit power from commercial electricity.
6. There should be the working textbook that contains step by step
experiment process, and the guide book that the teacher can refer to teach
with.
III. SPECIFICATION
Page 1 of 3
B1
NEW-RENEWABLE ENERGY EXPERIMENTAL EQUIPMENT
email: sales@issyam.com / pt.issyam@gmail.com
(5) Charging controller: 1EA 2. Solar powered generation system application training & experiment
1) Control function: Control charging or discharging curriculum
(6) Auto reversing switch: 1EA (1) Off-grid inverter system installation training
1) Main power: 190~240V (2) Load test of solar power module
2) Main frequency: 60Hz (3) Series and parallel control circuit composition and load power input
3) Auxiliary power: 0~240V circuit
4) Auxiliary frequency: Not monitored (4) Automatic transfer circuit configuration at electric discharge or
5) Auxiliary switching power: 180V power failure
6) Power reversing time: 20s (5) Grid-connected inverter circuit configuration
(7) Load device (6) Module efficiency test by variation of incidence angle
1) Lamp: more than LED 10W (7) Battery power input circuit training
(8) Control panel (8) Experiment of power output by Series & parallel circuit
1) Material: AL configuration
2) NFB 30A, Single 1A: 1EA (9) Real-time monitoring experiment
3) SMPS (24V 3.1A) (10) System connect inverter load operation experiment
4) Watt meter : 3EA (11) System connect inverter system PLC control training
5) Voltage meter: DC voltage 2EA, AC voltage 3EA (12) Termination voltage measurement experiment by discharge of
6) Current meter: DC Am meter 2EA, AC Am meter 3EA battery
B1
NEW-RENEWABLE ENERGY EXPERIMENTAL EQUIPMENT
email: sales@issyam.com / pt.issyam@gmail.com
(13) Charger controller overcharge prevention experiment inverter, off-gird inverter and power supply
(6) Data acquisition hardware instruction (14) Includes image capture & save of displayed diagram and graphs
(7) Introduction of solar powered electric conversion experiment (15) Can display selected voltage & current on the graph
equipment components (16) Compatible with Windows 2000, XP, Vista, 2008 and both 32bit &
64bit OS