www.smartgridindonesia.com
PV Technology
1. Silicon Solar Cells
• thin-film solar cells because they are made from very thin layers
of semiconductor material, such as cadmium telluride or copper
indium gallium diselenide. The thickness of these cell layers is
only a few micrometers—
Induction Generator
Synchronous Generator
POTENSI ENERGI BAYU ONSHORE
INDONESIA
KOMPOSISI KAPASITAS TERPASANG
s.d Juni 2020
163.32;
131.07;
78.08;
442; 1%0%0%
0%
4706.93; 8% Pembangkit MW % MW MWh CF
PLT PLTU 31.466 50,2% 86.907.418 63,9%
2442.68; 4% Non EBT
PLTU MT
PLTGU 11.942 19,1% 17.618.132 34,2%
4510.72; 7% PLTG/MG 6.761 10,8% 7.869.584 26,9%
PLTD 4.511 7,2% 3.456.018 17,7%
PLT EBT PLTP 2.443 3,9% 7.775.205 73,7%
PLTA 4.707 7,5% 9.721.405 47,8%
PLTM 442 0,7% 995.396 52,1%
6760.65; 11% 31465.63; 50% PLTS 78 0,1% 61.421 18,2%
PLTB 131 0,2% 176.922 31,2%
PLT Bio/Sa 163 0,3% 150.059 21,3%
Bauran Energi EBT PLT AL
2020 : 14,02 % TOTAL 62.643 100,0% 134.731.565 49,8%
(Tanpa B20)
Pembangkit MW % MW MWh % MWh
18 50.8
16 50.6
14 50.4
12
50.2
10
50
8
49.8
6
49.6
4
2 49.4
0 49.2
6:01 6:19 6:37 6:55 7:13 7:31 7:49 8:07 8:25 8:43 9:01 9:19 9:37 9:55 10:1310:3110:4911:0711:2511:4312:0112:1912:3712:5513:1313:3113:4914:0714:2514:4315:0115:1915:3715:5516:1316:3116:4917:0717:2517:43
-2 49
PLTS (MW) Freq Sys
Pembebanan bergantung Hunting beban dengan nilai perubahan Hunting beban dengan nilai perubahan
Output tidak maksimal (kendala
pada cuaca (Hunting beban turun 15.85 MW pada Pukul 11:36 naik 5.54 MW pada Pukul 12:20 menjadi
cuaca) dan berbeda jauh dari
di pagi Hari) menjadi 4.67 MW pada Pukul 11:40 15.95 MW pada Pukul 12:24 (2.60
perkiraan (forecasting)
(2.79 MW/Min) dengan perubahan MW/Min) dengan perubahan frekuensi
frekuensi sistem 50.09 menjadi 49.52 sistem 49.98 menjadi 50.46 (Ramping-
(Tidak menyebabkan UFR) up tidak diatur)
www.pln.co.id | 5
System Freq vs Wind Turbine Load (Tolo & Sidrap)
(sample captured: Oct 10th, 2019)
Coincidence Factor yang baik antara lokasi PLTB Sidrap dan Tolo
50.600 90.000
Highest Ramp Highest Ramp
up/down : up/down :
80.000
50.400 10,4 MW/mnt 6,2 MW/mnt
70.000
50.200
60.000
50.000 50.000
MW
HZ
49.800 40.000
30.000
49.600
20.000
49.400
10.000
49.200 0.000
00:02:0002:23:0004:44:0007:05:0009:26:0011:47:0014:08:0016:29:0018:50:0021:11:0023:32:00
www.pln.co.id |
Membedakan Resiliensi dengan Reliability
• Resiliensi didefinisikan sebagai kemampuan untuk menghindari dan mempertahankan layanan terhadap suatu keadaan yang mengganggu
integritas jaringan dengan cara beradaptasi secara terencana sehingga dapat meminimalkan dampak buruk dari kejadian.
• Resiliensi lebih cenderung menghadapi ancaman yang bersifat “low probability but high impact” dibandingkan dengan reliability yang
merupakan ukuran response terhadap “high probability but low impact”
• Resiliensi merupakan buah karya pengelola jaringan dengan pelanggan dan pemangku kepentingan lainnya, sedangkan reliability
merupakan karakter dari jaringan dan pengelolanya
www.smartgridindonesia.com
Upaya Mencapai Sistem Kelistrikan Yang Fleksibel
• Grid Hardening;
• upaya menambah jaringan baru, rekonduktoring, , menambah kapasitas Gardu Induk dan trafo2 dsb.
• Implementasi FACTS ( Flexible AC Transmission System ) dan
• RACDS ( Resilient AC Distribution System )
• Grid Smartening;
Upaya meningkatkan Sistim Kendali Jaringan dengan cara
• menambah sensor,
• memperpendek interval pengambilan data dan
• latency pengiriman data,
• meningkatkan visibility dan controllability dari operator system.
• Implementasi WAMPACS ( Wide Area Monitoring and Protection System ).
• Generation and Load Forecasting
• Responsive Demand ; Pembentukan kluster2 yang mampu mencukupi kebutuhannya sendiri
dalam situasi gangguan.
www.smartgridindonesia.com
Grid Hardening (1)
Flexible AC Transmission System (FACTS)
www.smartgridindonesia.com
Grid Hardening (2)
Resilient AC Distribution System (RACDS)
www.smartgridindonesia.com
Grid Smartening (1)
Adding Advance Meter
www.smartgridindonesia.com
C 20 Grid Smartening (2)
WAMPACS – Wide area Monitoring and Control System
PMU resolution is much higher than SCADA Higher Resolution (typically 25 samples/second
compared to 4 to 10 seconds/sample of SCADA
Benefits of Forecasting
• Better planning and grid stability.
• Real Time Monitoring of every individual
WTGs i.e. Turbine /Inverter Status.
• Geophysical parameter such as wind speed,
Wind direction can be visualized from dash -
board.
• Actual Performance curve, Actual
generation, Break even and all the revised
schedule of WTGs can be visualized.
• Help to manage the WTGs/Solar Panels
maintenance time resulting in reduction
losses, which will ultimately will lead to also
Increase in revenue
Services To Capture Different Kinds Of Demand Flexibility
• Priority pricing (Chao and Wilson, 1987), where higher-priority tasks pay more;
• Interruptible electrical power (Tan and Varaiya, 1991), where more reliable service costs more;
• Demand response (FERC, 2011a), where demand reduction below a baseline is incentivized;
• Price-responsive demand (Chao, 2010), where real-time price equals marginal cost;
• Deadline-differentiated service (Bitar and Low, 2012), where deferrable tasks pay less; and
• Duration-differentiated energy service, with fixed power, flexible time, and different durations,
where, for example, a consumer can purchase 1 kilowatt for any number of hours within a preset
window.
|Indeks Kekuatan Sistem 2019 & 2020 Sistem Sulutgo
2019 2020
25
kW
20 25,000
20,000
15
f(x) = 12.91 x + 3.73 15,000
5,000
5
-
0.00 200.00 400.00 Hz 600.00 800.00 1000.00 1200.00
-
0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85
• Estimasi Indeks Kekuatan Sistem Sulbagut 2019 : 16,64 • Estimasi Indeks Kekuatan Sistem Sulbagut 2020 : 18,24
MW/Hz MW/Hz
• Data 1 Jan – 31 Des 2019 • Data 1 Jan – 31 Jul 2020
www.pln.co.id | 01
Dampak Pembebanan Pembangkit Akibat Operasi PLTS
Langgam Beban Sistem Sulbagut, Kondisi Dengan beroperasinya PLTS
(Terjadi Penurunan CF PLTU PLN dan LMVPP Amurang Gas)
www.pln.co.id |
Dampak terhadap Frekuensi Sistem
Saat Regulasi Frekuensi Primer Aktif
Fluktuasi PLTS di response oleh Droop Mode (Free Governor) LMVPP Amurang
18 50.6
16
50.4
14
12 50.2
10
50
8
49.8
6
4 49.6
2
49.4
0
4/20/2020 09:00:304/20/2020 09:30:304/20/2020 10:00:304/20/2020 10:30:304/20/2020 11:00:304/20/2020 11:30:304/20/2020 12:00:304/20/2020 12:30:304/20/2020 13:00:304/20/2020 13:30:30
-2 49.2
Pukul 11:55 beban PLTS Isimu turun dari 10 MW ke 0 MW dan 2 menit kemudian beban naik dengan cepat ke 12 MW,
sehingga pukul 12:00 dicurtail pada beban 5 MW.
www.pln.co.id |
Langkah-Langkah Mitigasi
Untuk menghilangkan dampak PLTS ke operasi sistem Sulutgo
www.pln.co.id |
Cadangan Putar Yang Diperlukan
www.pln.co.id | 4
Perubahan sebaran frekuensi sistem menjadi tantangan utama operasi sistem
Rentang ekskursi frekuensi sebelum dan sesudah PLTB beroperasi
Before Wind Penetration With Sidrap (70 MW) With Sidrap (70 MW) + Tolo (60 MW)
www.pln.co.id |
Forecasting yang akurat sangat penting untuk operasi sistem
yang aman dan andal
Learning curve yang sulit namun dapat dikuasai dalam waktu setahun
4:30:00 PM
6:30:00 PM
00:30:00
1:30:00 PM
2:30:00 PM
3:30:00 PM
5:30:00 PM
7:30:00 PM
8:30:00 PM
9:30:00 PM
11:30:00 PM
12:30:00 PM
10:30:00 PM
8:30:00 AM
1:30:00 AM
2:30:00 AM
3:30:00 AM
4:30:00 AM
5:30:00 AM
6:30:00 AM
7:30:00 AM
9:30:00 AM
www.pln.co.id |
Dengan beberapa langkah improvement, Sulawesi masih dapat
menerima lebih banyak pembangkit intermitten
www.smartgridindonesia.com
Persyaratan PLTS & PLTB di Sistim Jawa Bali
Rekomendasi 5pesifikasi Teknis Pembangkit EBT intermitten (PL T5 dan PLTB) Dari PT. PLN (Persero) Pusat Pengatur Beban
www.smartgridindonesia.com
KESIMPULAN :
www.smartgridindonesia.com
www.smartgridindonesia.com
www.smartgridindonesia.com