You are on page 1of 30

Republic of the Philippine

Department of the Interior and Local G


BUREAU OF FIRE PROTECT

PERFORMANCE MONITORING AND CO


PERFORMANCE PERIOD JULY TO DEC

SESSION
DATE/ TIME OUTPUT/s REALITY
NO.

Every after
3. OPLAN PAALALA:
conduct of Conducted upon schedule
IWAS PAPUTOK
activity

1 Every after
3. OPLAN PAALALA:
conduct of Conducted upon schedule
IWAS PAPUTOK
activity

Every fire calls Response to fire calls


responded from time fire incident is
within the 1. Fire Calls Response reported to the station.
second
semester.
Every Safe and effective
emergency emergency medical and
medical and rescue response.
2 rescue services 1. Emergency Medical and
call within Rescue Services
second
semester.

BFP-QSF-ADMN-011 Rev. 00 (02.28.19) Page 1of30


Every Safe and effective other
emergency emergency response.
medical and
rescue services
call within 2. Other Emergency calls
second
semester.

3
Every Safe and effective
emergency response to vehicular
medical and accident.
rescue services
call within
3. Vehicular Accident
second
semester.

Every request Conducted flushing and


and as to order decontamination activities
within second within the specified time
semester frame.
4 5. Flushing and
decontamination

Signature:
Coachee
Name: F01 Brixine B Acangan
Designation: CRO/ Operation Crew
Date: 31 December 2021

BFP-QSF-ADMN-011 Rev. 00 (02.28.19) Page 2of30


Republic of the Philippines
ment of the Interior and Local Government
BUREAU OF FIRE PROTECTION

MONITORING AND COACHING JOURNAL


RMANCE PERIOD JULY TO DECEMBER 2021

OPTIONS WRAP-UP

Inspect the vicinity where the firework display


will happen. Inspect the vicinity and brief the
Inspect the vicinity and brief the concern people concern people on the safety protocols
on the safety protocols before the conduct of fire before the conduct of fire work display.
work display.

Inspect the vicinity where the firework display


will happen. Inspect the vicinity and brief the
concern people on the safety protocols
Inspect the vicinity and brief the concern people
before the conduct of fire work display.
on the safety protocols before the conduct of fire
work display.
Responded immediately. Verifiy the call and respond with
complete PPE.
Verifiy the call and respond with complete PPE.

Responded immediately. Verifiy the call and respond with


complete PPE.

Verifiy the call and respond with complete PPE.

BFP-QSF-ADMN-011 Rev. 00 (02.28.19) Page 3of30


Responded immediately. Verifiy the call and respond with
complete PPE.

Verifiy the call and respond with complete PPE.

Responded immediately. Verifiy the call and respond with


complete PPE.

Verifiy the call and respond with complete PPE.

Conducted flushing and decontamination


activities.

Conducted flushing and


Conducted flushing and decontamination decontamination activities with
activities with complete PPE within the specified complete PPE within the specified time
time frame. frame.

Signature:
Coach
Name: SFO2 Rodelio S Manuel
Designation: Shift Supervisor
Date: 31 December 2021

BFP-QSF-ADMN-011 Rev. 00 (02.28.19) Page 4of30


Republic of the Philippines
Department of the Interior and Local Government
BUREAU OF FIRE PROTECTION
Telefax Number: (02) 426 - 4399
Email Address: pas_nhq@yahoo.com

INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)


(District/ City/ Municipal Fire Station)

I, F02 Jethro P Vizcara, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period JULY TO DECEMBER 2022.

________________________________
Ratee's Signature
Date: 15 June 2022
Designation:DPO/FSL/FAI
Effective Date of Designation: 09 December 2020
Bureau Order No:Office Order Number: DSG-2020-048
TARGETS APPROVED BY:
R 5 - Outstanding
Rater's Signature a 4 - Very Satisfactory
t
3 - Satisfactory
Name: SF04 Mario P Bosongan i
2 - Unsatisfactory
n
1- Poor
Position: Sub Station Commander g

Date: 15 June 2022

SUCCESS INDICATOR
(TARGETS + MEASURES)
RATING
OUTPUTs Actual Accomplishments REMARKS
(NOTE: Please add rows for success indicators if necessary) Q E T Average
GENERAL ADMINISTRATION AND SUPERVISION
A.I.a General Management and Supervision
A.II Operations
A.II.a Fire Prevention Management Program
A.II.a.1 Enforcement of Fire Safety Laws, Rules,
Regulations and other
A.II.a.2 Information, Education, and Communication
(IEC) Activities
1.OPLAN Kaluluwa Q-100% effective delivery of basic information safety, rescue,
and emergency medical services during the conduct of Oplan
Kaluluwa (Undas) T- OPLAN KALULUWA
(UNDAS) conduted on specified time and date.
2. OPLAN Paghalasa
Q-100% effective delivery of basic information safety, rescue,
and emergency medical services during the conduct of Oplan
Paghalasa T- OPLAN PAGHALASA conducted
on specified time and date.
3.OPLAN Iwas Paputok
E- 100% of fireworks standby acted upon safely and
effectively within the specified schedules.

4. OPLAN Ligtas Pamayanan


Q-100% effective delivery of basic information safety, rescue,
and emergency medical services during the conduct of OPLAN
Ligtas Pamayanan T- OPLAN Ligtas
Pamayanan conducted on specified time and date.

5. Intensive Lecture Q - Intensive lecture was conducted to 100% of targeted


participants within the zone T - Intensive lecture was
conducted within the zone during 2nd semester.
A.II.b Fire and Emergency Management Program
A.II.b.1 Fire Operations Activities
1.Fire Calls Q- 100% safe and effective fire call response

E-100% fire calls responded within the semester


T-seven minutes and below responding
time from the time fire incident is reported to the station

BFP-QSF-ADMN-003 Rev. Ø2 (06.08.20) Page 5 of 30


SUCCESS INDICATOR
(TARGETS + MEASURES)
RATING
OUTPUTs Actual Accomplishments REMARKS
(NOTE: Please add rows for success indicators if necessary) Q E T Average
A.II.b.2 Fire Investigation Activities
Q- Sufficient and realiable information of fire incidents.
E - 100% of arson fire
1. Arson Cases cases filed in court against total no. of arson fires.
T- submits reportial requirements based
on scheduled indicated SOP
Q - Accurate and sufficient Spot investigation report
E - 100% of all
2. Spot Investigation Report fire incident will be investigated.
T- spot investigation report
submitted to City Fire Marshal copy furnished higher offices
within
Q 24 hours
- Accurate andafter the occurrence
sufficient Progress of fire incident.
investigation report
E - 100% of all fire
3. Progress Investigation Report incident will be investigated.
T - progress investigation report submitted to Fire Marshal
copy furnished higher offices within 7 to 15 days from the
Q - Accurate andinception
sufficientof the investigation.
Progress investigation report
E - 100% of all
4. Final Investigation Report fire incident will be investigated.
T - final investigation report
submitted to Fire Marshal copy furnished higher offices within
30 to 45 days from the inception of the investigation.
A.II.b.3 Non-Fire Response Activities
1.Emergency Calls Q- 100% safe and effective emergency medical rescue
response E- 100%
emergency call responded within the semester
T- ten minutes and below responding time from the
time emergency medical and rescue is reported to the station
3. Flushing/ Decontamination Activities Q- Proper Flushing/ Decontamination activities conducted
T-Conducted on a specific
time
4. Disaster and Rescue Operation Q- 100% safe and effective disaster and rescue operation
E- 100% disaster and rescue
operation responded within the semester

FINAL AVERAGE RATING

ADJECTIVAL RATING

The above rating has been discussed with me by my immediate Supervisor/ City/ Municipal Fire Marshal/ Section/ Division Chief Final Rating by Office Director/ Provincial/ District Fire Marshal:

Signature: Signature: Signature:


Name of Ratee: F02 Jethro P Vizcara Name of Rater: Name:
Position: DPO/FSL/FAI Position: Position:
Date: 15 June 2022 Date: Date:

BFP-QSF-ADMN-003 Rev. Ø2 (06.08.20) Page 6 of 30


RATING MATRIX FORM (RMF)
(District/ City/ Municipal Fire Station)

OUTPUTS QUALITY EFFICIENCY TIMELINESS


GENERAL ADMINISTRATION AND SUPERVISION
A.I.a General Management and Supervision
A.II Operations
A.II.a Fire Prevention Management Program
A.II.a.1 Enforcement of Fire Safety Laws,
Rules, Regulations and other
A.II.a.2 Information, Education, and
Communication (IEC) Activities
5-100% effective delivery of basic 5- OPLAN KALULUWA (UNDAS) conduted
information safety, rescue, and on specified time and date.
emergency medical services during the 4- n/a
conduct of Oplan Kaluluwa (Undas) 3- n/a
4- n/a 2- n/a
3- n/a 1-OPLAN OPLAN KALULUWA (UNDAS)
2- n/a conduted 1 day after the specified time and
1. OPLAN KALULUWA (UNDAS) 1- ineffective delivery of basic information date.
safety, rescue, and emergency medical
services during the conduct of Oplan
Kaluluwa (Undas)

5- 100% of fireworks standby acted upon


safely and effectively within the specified
schedules.
4- 91%-99%of fireworks standby acted
upon safely and effectively within the specified
schedules
2. OPLAN PAALALA: IWAS PAPUTOK
3- 90% and below of fireworks
standby acted upon safely and effectively
within the specified schedules
2- N/A
1- N/A

A.II.b Fire and Emergency Management


Program
A.II.b.1 Fire Operations Activities

BFP-QSF-ADMN-004 Rev. Ø1 (05.10.19) Page 7 of 30


OUTPUTS QUALITY EFFICIENCY TIMELINESS
5-seven minutes and below responding time
from the time fire incident is reported to the
station
5- 100% of fire calls responded by the end of 4- 8-10 minutes responding time from the
5- 100% safe and effective fire call
first sem time fire incident is reported to the station
response
4- 89% to 99% of fire calls responded by
4 - n/a
the end of first sem 3- 11-13 minutes responding time from the
1. Fire Calls Response 3- n/a
3- 88% and below of fire calls responded by time fire incident is reported to the station
2- n/a
the end of first sem 2- 14-15 minutes
1- unsafe and ineffective fire call
2- N/A responding time from the time fire incident is
response
1- N/A reported to the station
1- 16 minutes and above responding time
from the time fire incident is reported to the
station
A.II.b.2 Fire Investigation Activities
5 - Sufficient and reliable information of 5-100% of arson fire cases filed in court 5- submits reportial requirements before the
fire incidents. against total no. of arson fires. scheduled indicated SOP.
4 - n/a 4- 99% - 90% of 4- submits reportial
3- n/a arson fire cases filed in court against total no. requirements based on scheduled indicated
1. Arson Cases 2- n/a of arson fires 3- 89% and SOP
1-insufficient and below of arson fire cases filed in court against 3- N/A
unreliable information of fire incidents total no. of arson fires. 2- N/A
2- N/A
1- N/A 1-submits
5- spot investigation report submitted to City
Fire Marshal copy furnished to higher offices
within 24 hours after the occurrence of fire
incident.
4- spot investigation report submitted to
City Fire Marshal copy furnished to higher
5- 100% of all fire incidents will be offices within 25-26 hours after the
5- Accurate and sufficient Spot
investigated. occurrence of fire incident.
investigation report
4-99%-90% of all fire incidents will be 3- spot
4 - n/a
investigated investigation report submitted to City Fire
2. Spot Investigation Report 3- n/a
3-89% and below of all fire Marshal copy furnished to higher offices
2- n/a
incidents will be investigated within 27-28 hours after the occurrence of
1- inaccurate
2- N/A fire incident.
and insufficient spot investigation report.
1- N/A 3- N/A
2- N/A

1- spot investigation report submitted to


City Fire Marshal copy furnished to higher
offices within 29 hoursand above after the
occurrence of fire incident.
5- progress investigation report submitted to
Fire Marshal copy furnished higher offices
5- 100% of all fire incidents will be within 7 to 15 days from the inception of the
5- Accurate and sufficient progress investigation.
investigated.
investigation report 4 - n/a
4-99%-90% of all fire incidents will be
4 - n/a 3- n/a
investigated
3. Progress Investigation Report 3- n/a
3-89% and below of all 2- n/a
2- n/a 1- progress
fire incidents will be investigated
1- inaccurate and investigation report submitted to Fire Marshal
2- N/A
insufficient progress investigation report. copy furnished higher offices within 16 days
1- N/A
and above from the inception of the
investigation.

BFP-QSF-ADMN-004 Rev. Ø1 (05.10.19) Page 8 of 30


OUTPUTS QUALITY EFFICIENCY TIMELINESS
5- final investigation report submitted to Fire
Marshal copy furnished higher offices within
5- 100% of all fire incidents will be
30 to 45 days from the inception of the
5- Accurate and sufficient final investigated.
investigation.
investigation report 4-99%-90% of all fire incidents will be
4 - n/a
4 - n/a investigated
3- n/a
4. Final Investigation Report 3- n/a 3-89% and below of
2- n/a
2- n/a all fire incidents will be investigated
1- final
1- inaccurate 2- N/A
investigation report submitted to Fire Marshal
and insufficient final investigation report.
copy furnished higher offices within 46 days
1- N/A
and above from the inception of the
investigation.
A.II.b.3 Non-Fire Response Activities

5- 100% safe and effective emergency 5- 100% of fire calls responded by the end of 5- ten minutes and below responding time
medical rescue response 2nd sem from the time emergency medical and rescue
4 - n/a 4- 89% to 99% of fire calls responded by is reported to the station
3- n/a the end of 2nd sem
2- n/a 3- 88% of fire calls responded by the end of 4-11-15 minutes responding time from the
1- unsafe and ineffective fire call 2nd sem time emergency medical and rescue is
1. Emergency Calls response 2- 51% to 87% of fire call responded by the reported to the station
end of 2nd sem
1-50% or below of fire call responded by the 3- 15 minutes and below responding time
end of 2nd sem from the time emergency medical and rescue
is reported to the station
2- N/A
5- 100% of disaster and rescue operation 1- N/A
responded by the end of first sem
4- 89% to 99%
of disaster and rescue operation responded
5- 100% safe and effective response to
by the end of first sem
disaster and rescue operation
3- 88% of disaster and rescue operations
4 - n/a
responded by the end of first sem
2.Disaster and Rescue Operation 3- n/a
2- n/a
2- 51% to 87% of disaster and rescue
1- unsafe and ineffectiveresponse to
operation responded by the end of first sem
other disaster and rescue operation
1-50% or below of disaster and rescue
operation responded by the end of first sem

5 - 100% safe and effective conduct of


flushing and decontamination activities within
the specified time frame.
4- 99% - 90% safe and effective
conduct of flushing and decontamination
3. Flushing and decontamination activities within the specified time frame 3-
89% and below safe and effective conduct of
flushing and decontamination activities within
the specified time frame
2- N/A
1- N/A

Discussed and agreed upon:

________________________________ ________________________________
Ratee's Signature Rater's Signature
Name of Ratee: F02 Jethro P Vizcara Name of Rater: SF04 Mario P Bosongan
Date: 15 June 2022 Date: 15 June 2022
Position: DPO/FSL/FAI Position: Sub Station Commander
BFP-QSF-ADMN-004 Rev. Ø1 (05.10.19) Page 9 of 30
Republic of the Philippines
Department of the Interior and Local Government
BUREAU OF FIRE PROTECTION

REGIONAL CONSOLIDATED STANDARD OUTPUTS

SUCCESS INDICATOR Description


DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Administered the SALN
Q - Administered the SALN of Administered the SALN of Administered the SALN of
of Provincial Office
Provincial Office personnel with Quality (Q) n/a Provincial Office personnel n/a Provincial Office personnel
personnel with no error or
no error or lapses. with minimal error or lapses. with major error or lapses.
lapses.
1. Statement of Assets,
Liabilities and Net Worth 100% of the collated 90-99% of the collated 80-89% of the collated SALN 70-79% of the collated 69% and below of the
(SALN) Efficiency (E)
E-100% of the collated SALN SALN with complete SALN with complete with complete entries SALN with complete entries collated SALN with
with complete entries submitted entries submitted entries submitted submitted submitted complete entries submitted
T - 100% of the collated SALN SALN forwarded to higher
forwarded to higher office forwarded to higher office 1st
forwarded to higher office 1st Timeliness (T) n/a n/a office after 1st week of
last week of February. week of March.
week of March. March.
Complete and accurate Incomplete content of Failed to submit Monthly
Quality (Q) Monthly Report of n/a Monthly Report of Changes n/a Report of Changes for Unit
Q- Complete and accurate Changes for Unit Code for Unit Code Code
Monthly Report of Changes for
Unit Code E 100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly NO monthly report of
- 100% of the monthly report of report of changes for unit report of changes for unit report of changes for unit report of changes for unit changes for unit code
2. Monthly Report of
changes for unit code Efficiency (E) code forwarded to higher code forwarded to higher code forwarded to higher code forwarded to higher forwarded to higher office
PROVINCIAL FIRE Changes for Unit Code forwarded to higher office on office on 20th working office on 20th working day office on 20th working day of office on 20th working day on 20th working day of the
MARSHAL 20th working day of the of the day of the of the month. of the of the month. the of the month. of the of the month. of the month.
month T-
Submitted before the deadline Failed to submit Monthly
Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the Report of Changes for Unit
20th day of the month deadline target date Submitted more than 3 days Code

Q- Complete and accurate Quality (Q) Complete and accurate n/a n/a n/a Failed to submit Monthly
Monthly Report of Changes for Monthly Report of Report of Changes for
Pensioners Changes for Pensioners Pensioners
100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report 60% to 79% of the monthly NO monthly report of
3. Monthly Report of report of changes for report of changes for report of changes for
of changes for pensioners report of changes for changes for pensioners
Changes for Pensioners forwarded to higher office on pensioners forwarded to pensioners forwarded to pensioners forwarded to
Efficiency (E) pensioners forwarded to forwarded to higher office
higher office on 15th higher office on 15th higher office on 15th
15th working day of the of the higher office on 15th working on 15th working day of the
working day of the of the working day of the of the working day of the of the
month. day of the of the month. of the month.
month. month. month.

T- Submitted before the Timeliness (T) Submitted on the 15th Submitted 1 day after the Submitted 2 days after the
deadline day of the working month deadline target date Submitted more than 3 days Failed to submit
Complete and accurate
Quality (Q) Monthly Report of n/a n/a n/a Failed to submit Monthly
Q- Complete and accurate
Accountability for Report of Accountability for
Monthly Report of
Accountable Forms Accountable Forms
Accountability for Accountable
Forms E - 100%
of the monthly report of
4. Monthly Report of
accountability for accountable
Accountability for
forms forwarded to higher
Accountable Forms
office on 5th working day of the
following month covering the
report
T- Submitted before Page 10 of 30
Q- Complete and accurate Description
SUCCESS INDICATOR
DESIGNATION OUTPUTS Monthly Report of Variables
(TARGETS + MEASURES) 5 4 3 2 1
Accountability for Accountable
Forms E - 100%
of the monthly report of 100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly NO monthly report of
4. Monthly Report of 60% to 79% of the monthly
accountability for accountable report of accountability report of accountability for report of accountability for accountability for
Accountability for report of accountability for
forms forwarded to higher for accountable forms accountable forms accountable forms accountable forms
Accountable Forms accountable forms forwarded
office on 5th working day of the Efficiency (E) forwarded to higher office forwarded to higher office
to higher office on 5th
forwarded to higher office forwarded to higher office
following month covering the on 5th working day of the on 5th working day of the on 5th working day of the on 5th working day of the
working day of the following
report following month covering following month covering following month covering the following month covering the
month covering the report.
T- Submitted before the report. the report. report. report.
the deadline
Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit
Complete and accurate
Q- Complete and accurate Quality (Q) Monthly Report on n/a n/a n/a Failed to submit Monthly
Monthly Report on Summary of Summary of Collections Report on Summary of
Collections and Deposits and Deposits Collections and Deposits
PROVINCIAL FIRE
MARSHAL
100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
5. Monthly Report on E - 100% of the monthly report NO monthly report on
report on summary of report on summary of report on summary of report on summary of
Summary of Collections on summary of collections and collections and deposits collections and deposits collections and deposits collections and deposits
summary of collections and
and Deposits deposits forwarded to higher deposits forwarded to higher
Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office on forwarded to higher office
office on 5th working day of the office on 5th working day of
on 5th working day of the on 5th working day of the 5th working day of the on 5th working day of the
following month covering the the following month covering
following month covering following month covering following month covering the following month covering the
report. the report.
the report. the report. report. report.

T- Submitted before the Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline deadline target date Submitted more than 3 days Failed to submit
Q - 100% ratio of Fire Code 100% ratio of Fire Code 95% to 99% ratio of Fire 90% to 94% ratio of Fire 85% to 89% ratio of Fire Below 85% ratio of Fire
Fees collection vis-à-vis actual Fees collection vis-à-vis Code Fees collection vis- Code Fees collection vis-à- Code Fees collection vis-à- Code Fees collection vis-à-
Quality (Q)
remittance to the Bureau of actual remittance to the à-vis actual remittance to vis actual remittance to the vis actual remittance to the vis actual remittance to the
Treasury. Bureau of Treasury. the Bureau of Treasury. Bureau of Treasury. Bureau of Treasury. Bureau of Treasury.
6. Fire Code Fees E - 2% increase of fire code Above 2% increase of fire 2% increase of fire code Below 2% increase of fire
revenues from the preceding Efficiency (E) code revenues from the n/a revenues from the preceding code revenues from the n/a
year. preceding year. year. preceding year.
T- Submitted before the Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline deadline target date Submitted more than 3 days Failed to submit
Administered the
Quality (Q) implementation of Oplan n/a n/a n/a
Ligtas na Pamayanan
Q- Complete and accurate activities No OLP activities conducted
monthly reports
E - 100% of the monthly
monitoring reports for OPLAN 100% of the monthly 80% to 99% of the monthly
60% to 79% of the monthly 10% to 59% of the monthly
LIGTAS NA PAMAYANAN monitoring reports for monitoring reports for NO monthly monitoring
7. OPLAN LIGTAS NA monitoring reports for OPLAN monitoring reports for
forwarded to higher office on OPLAN LIGTAS NA OPLAN LIGTAS NA reports for OPLAN LIGTAS
PAMAYANAN LIGTAS NA PAMAYANAN OPLAN LIGTAS NA
2nd working day of the PAMAYANAN forwarded PAMAYANAN forwarded NA PAMAYANAN forwarded
Efficiency (E) forwarded to higher office on PAMAYANAN forwarded to
following month covering the to higher office on 2nd to higher office on 2nd to higher office on 2nd
2nd working day of the higher office on 2nd working
report. working day of the working day of the working day of the following
following month covering the day of the following month
T- Submitted before the following month covering following month covering month covering the report.
report. covering the report.
deadline the report. the report.

Timeliness (T) Conducted the activities n/a Re-schedule due to other n/a
on the target schedule matters Failed to conduct
Administered the
Q- Administered the Quality (Q) implementation of CFPP n/a n/a n/a No CFPP activities
implementation of CFPP activities conducted
activities
E - 100% ratio of
PROVINCIAL FIRE Community Fire Protection
MARSHAL 8. Community Fire Plan (CFPP) formulated by the
Protection Plan (CFPP) operating units in 1st Quarter Page 11 of 30
vis-à-vis target barangays
SUCCESS INDICATOR
Q- Administered the Description
DESIGNATION OUTPUTS Variables
(TARGETS + of
implementation MEASURES)
CFPP 5 4 3 2 1
activities
E - 100% ratio of 100% ratio of Community 95% to 99% ratio of 85% to 89% ratio of Below 85% ratio of
PROVINCIAL FIRE 90% to 94% ratio of
Community Fire Protection Fire Protection Plan Community Fire Protection Community Fire Protection Community Fire Protection
MARSHAL Community Fire Protection
8. Community Fire Plan (CFPP) formulated by the Efficiency (E) (CFPP) formulated by the Plan (CFPP) formulated by Plan (CFPP) formulated by Plan (CFPP) formulated by
Plan (CFPP) formulated by
Protection Plan (CFPP) operating units in 1st Quarter operating units vis-à-vis the operating units vis-à- the operating units vis-à-vis the operating units vis-à-vis
the operating units vis-à-vis
vis-à-vis target barangays target barangays within vis target barangays within target barangays within target barangays within
target barangays within AOR.
within AOR. AOR. AOR. AOR. AOR.
T- Conducted the
activities on the target
schedule Timeliness (T) Conducted the activities n/a Re-schedule due to other n/a
on the target schedule matters Failed to conduct
Administered the
Q- Administered the Quality (Q) implementation of CFAG n/a n/a n/a No CFAG activities
implementation of CFAG activities activities conducted

100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
E - 100% ratio of Community
9. Community Fire Fire Auxiliary Group Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary
Fire Auxiliary Group
Auxiliary Group (CFAG) established and trained by the Efficiency (E) established and trained Group established and Group established and Group established and Group established and
by the operating units vis- trained by the operating trained by the operating units trained by the operating trained by the operating
operating units vis-à-vis target
à-vis target barangays units vis-à-vis target vis-à-vis target barangays units vis-à-vis target units vis-à-vis target
barangays within AOR.
within AOR. barangays within AOR. within AOR. barangays within AOR. barangays within AOR.

T- Conducted the activities on Timeliness (T) Conducted the activities n/a Re-schedule due to other n/a
the target schedule on the target schedule matters Failed to conduct
100% of fire calls not 89% to 99% of fire calls 51% to 87% of fire calls not 50% or below of fire calls
Q - 100% of fire calls not 88% of fire calls not
exceeding 300,000 not exceeding 300,000 exceeding 300,000 not exceeding 300,000
exceeding 300,000 estimated exceeding 300,000 estimated
Quality (Q) estimated property estimated property estimated property damage estimated property damage
property damage out of the property damage out of the
damage out of the total damage out of the total out of the total number of out of the total number of
total number of fire calls. total number of fire calls.
number of fire calls. number of fire calls. fire calls. fire calls.
100% of fire, emergency 89% to 99% of fire,
E - 100% of fire, emergency 51% to 87% of fire, 50% or below of fire,
and rescue calls emergency and rescue 88% of fire, emergency and
and rescue calls responded emergency and rescue calls emergency and rescue calls
responded (fire related) calls responded (fire rescue calls responded (fire
(fire related) against total Efficiency (E) responded (fire related) responded (fire related)
10. Fire Calls Response number of fire EMS and rescue against total number of related) against total related) against total number
against total number of fire against total number of fire
fire EMS and rescue calls number of fire EMS and of fire EMS and rescue calls
calls EMS and rescue calls EMS and rescue calls
rescue calls

100% of fire calls and 91% to 99% of fire calls 51% to 89% of fire calls and 50% or below of fire calls
T - 100% of fire calls and 90% of fire calls and related
related emergencies and related emergencies related emergencies and related emergencies
related emergencies emergencies responded
responded within seven responded within seven (7) responded within seven (7) responded within seven (7)
PROVINCIAL FIRE responded within seven (7) Timeliness (T) within seven (7) minutes
(7) minutes (from receipt minutes (from receipt of minutes (from receipt of call minutes (from receipt of call
MARSHAL minutes (from receipt of call (from receipt of call until
of call until arrival on the call until arrival on the fire until arrival on the fire until arrival on the fire
until arrival on the fire scene) arrival on the fire scene)
fire scene) scene) scene) scene)
Incomplete entries in the
Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports revision No report submitted
Q- Complete and accurate
monthly reports 100% of the monthly fire
E - 100% of the 99% to 80% of the monthly 79% to 60% of the monthly 59% to 10% of the monthly NO monthly fire incident
incident monitoring
11. Monthly Fire Incident monthly fire incident monitoring fire incident monitoring fire incident monitoring fire incident monitoring monitoring reports
reports forwarded to
Monitoring Report reports forwarded to higher reports forwarded to higher reports forwarded to higher reports forwarded to higher forwarded to higher office
Efficiency (E) higher office on 1st
office on 1st working day of the office on 1st working day office on 1st working day of office on 1st working day of on 1st working day of the
working day of the
following month covering the of the following month the following month covering the following month covering following month covering the
following month covering
report. covering the report. the report. the report. report.
the report.

Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit

Page 12 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Incomplete entries in the
Q- Complete and accurate Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports monthly reports revision No report submitted

100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly NO monthly report of
1. Monthly Report of E - 100% of the monthly report
report of changes for unit report of changes for unit report of changes for unit report of changes for unit changes for unit code
Changes for Unit Code of changes for unit code
Efficiency (E) code consolidated on code consolidated on 20th code consolidated on 20th code consolidated on 20th consolidated on 20th
consolidated on 20th working
20th working day of the working day of the of the working day of the of the working day of the of the working day of the of the
day of the of the month.
of the month. month. month. month. month.

Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit
Incomplete entries in the
Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports revision No report submitted

E - 100% of the monthly report 100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly NO monthly report of
2. Monthly Report of of changes for pensioners report of changes for report of changes for report of changes for report of changes for changes for pensioners
Changes for Pensioners consolidated on 15th working Efficiency (E) pensioners consolidated pensioners consolidated pensioners consolidated on pensioners consolidated on consolidated on 15th
day of the of the month. on 15th working day of on 15th working day of the 15th working day of the of the 15th working day of the of working day of the of the
PROVINCIAL the of the month. of the month. month. the month. month.
CHIEF,
ADMINISTRATIVE Submitted before the Submitted 1 day after the Submitted 2 days after the
SECTION Timeliness (T)
deadline deadline target date Submitted more than 3 days Failed to submit
Incomplete entries in the
Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports revision No report submitted
E - 100% of the applied/ filed 100% of the applied/ filed 80% to 99% of the 60% to 79% of the 10% to 59% of the
3. Leave Form leave were acted upon within NO applied/filed leave were
leave were acted upon applied/filed leave were applied/filed leave were acted applied/filed leave were
fifteen (15) minutes. Efficiency (E) acted upon within fifteen
within fifteen (15) acted upon within fifteen upon within fifteen (15) acted upon within fifteen
(15) minutes.
minutes. (15) minutes. minutes. (15) minutes.

Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit
Incomplete entries in the
Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports revision No report submitted
E - 100% of the requested 100% of the requested 80% to 99% of the 60% to 79% of the requested 10% to 59% of the
4. Service Record service record were acted upon NO requested service
service record were requested service record service record were acted requested service record
within fifteen (15) minutes. Efficiency (E) record were acted upon
acted upon within fifteen were acted upon within upon within fifteen (15) were acted upon within
within fifteen (15) minutes.
(15) minutes. fifteen (15) minutes. minutes. fifteen (15) minutes.

Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit
Incomplete entries in the
Quality (Q) Complete and accurate n/a reports and returned for n/a
monthly reports revision No report submitted

100% of the requested 80% to 99% of the 60% to 79% of the requested 10% to 59% of the
5. Service Rendered NO requested service
service rendered were requested service service rendered were acted requested service rendered
Efficiency (E) rendered were acted upon
acted upon within fifteen rendered were acted upon upon within fifteen (15) were acted upon within
within fifteen (15) minutes.
(15) minutes. within fifteen (15) minutes. minutes. fifteen (15) minutes.

Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline target date Submitted more than 3 days Failed to submit
Q - Collated SALN forwarded Collated SALN forwarded Collated SALN forwarded to Collated SALN forwarded to
to higher office has zero (0) Quality (Q) to higher office has zero n/a higher office has minimal (1- n/a higher office has major or
error. (0) error. 2) errors. more than 2 errors.
6. Statement of Assets,
Liabilities and Net Worth Page 13 of 30
PROVINCIAL (SALN)
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
6. Statement of Assets, 100% of the collated
Liabilities and Net Worth E - 100% of the collated SALN SALN forwarded to
100% of the collated SALN 100% of the collated SALN
PROVINCIAL (SALN) forwarded to higher office 1st Efficiency (E) n/a forwarded to higher office 1st n/a forwarded to higher office
higher office last week of
CHIEF, week of March. week of March. after 1st week of March.
February.
ADMINISTRATIVE
SECTION T- Submitted before the Timeliness (T) Submitted before the Submitted 1 day after the Submitted 2 days after the
deadline deadline deadline target date Submitted more than 3 days Failed to submit
100% of the 90% to 99% of the 70% to 89% of the 50% to 69% of the Below 50% of the
Q - 100% of the
memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
memoranda/letters/
Quality (Q) communications communications approved communications approved by communications approved communications approved
communications approved by
approved by superior by superior upon 1st superior upon 1st by superior upon 1st by superior upon 1st
superior upon 1st submission.
upon 1st submission. submission. submission. submission. submission.
100% of the 90% to 99% of the
7. Memoranda/ Letters/ E - 100% of the 70% to 89% of the 50% to 69% of the Below 50% of the
memoranda/letters/ memoranda/ letters/
Communications memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
Efficiency (E) communications acted communications acted
communications acted upon communications acted upon communications acted upon communications acted upon
upon within fifteen (15) upon within fifteen (15)
within fifteen (15) minutes. within fifteen (15) minutes. within fifteen (15) minutes. within fifteen (15) minutes.
minutes. minutes.

T- Acted upon receipt of the Timeliness (T) Acted upon receipt of the Acted more than 2 days Acted more than a week n/a Failed to comply
Memorandum/ Letters/ Memorandum/ Letters/
Communications Communications
Maintained an UPDATED Maintained summary of
Q - Maintained an updated
summary of information information of all personnel
summary of information of all Quality (Q) n/a n/a n/a
of all personnel within within AOR but failed to
personnel within AOR.
AOR. update.
8. Summary of
Information (SOI) E- 100% consolidation of 100% consolidation of 90-99% consolidation of 80-89% consolidation of 70-79% consolidation of 100% consolidation of
Efficiency (E) Summary of Information Summary of Information Summary of Information Summary of Information Summary of Information
Summary of Information (SOI)
(SOI) (SOI) (SOI) (SOI) (SOI)
T- Submitted before the Submitted before the Submitted 1 day after the Submitted 2 days after the
Timeliness (T)
deadline deadline deadline target date Submitted more than 3 days Failed to submit
PROVINCIAL Q - Summary of the IPCR's Summary of the IPCR's Summary of the IPCR's
CHIEF, rating matrix of personnel rating matrix of personnel rating matrix of personnel
Quality (Q) n/a n/a n/a
ADMINISTRATIVE within AOR prepared without within AOR prepared within AOR prepared with
SECTION error. without error. error.
100% consolidation of 90-99% consolidation of 80-89% consolidation of 70-79% consolidation of 100% consolidation of
E- 100% consolidation of Efficiency (E) Summary of Information Summary of Information Summary of Information Summary of Information Summary of Information
9. Individual
IPCRs (SOI) (SOI) (SOI) (SOI) (SOI)
Performance
Commitment and Review
T - Summary of the IPCR's Summary of the IPCR's Summary of the IPCR's
(IPCR)
rating matrix of personnel rating matrix of personnel rating matrix of personnel
within AOR forwarded to higher within AOR forwarded to within AOR forwarded to
Timeliness (T) n/a n/a n/a
office every 1st day of the higher office on 1st day higher office after the 1st
month following the covered of the month following the day of the month following
semester. covered semester. the covered semester.

100% of the 90% to 99% of the 70% to 89% of the 50% to 69% of the Below 50% of the
Q - 100% of the memoranda/
memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
letters/ communications
Quality (Q) communications communications approved communications approved by communications approved communications approved
approved by superior upon 1st
approved by superior by superior upon 1st superior upon 1st by superior upon 1st by superior upon 1st
submission.
upon 1st submission. submission. submission. submission. submission.
PROVINCIAL
1. Memoranda/ Letters/ 100% of the 90% to 99% of the 50% to 69% of the Below 50% of the
CHIEF, E - 100% of the memoranda / 70% to 89% of the
Communications memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
OPERATIONS letters/ communications acted memoranda/ letters/
Efficiency (E) communications acted communications acted communications acted communications acted
upon within fifteen (15) communications acted upon
upon receipt and filed upon receipt and filed upon receipt and filed upon receipt and filed
minutes. receipt and filed accordingly
accordingly accordingly accordingly accordingly
T- acted upon within fifteen Timeliness (T) acted upon within fifteen acted upon within fifteen acted upon within fifteen (31- acted upon more than an
(15) minutes. (15) minutes. (16-30) minutes. 60) minutes. hour acted upon more than a day
Page 14 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
100% of fire calls not 89% to 99% of fire calls 51% to 87% of fire calls not 50% or below of fire calls
Q - 100% of fire calls not 88% of fire calls not
exceeding 300,000 not exceeding 300,000 exceeding 300,000 not exceeding 300,000
exceeding 300,000 estimated exceeding 300,000 estimated
Quality (Q) estimated property estimated property estimated property damage estimated property damage
property damage out of the property damage out of the
damage out of the total damage out of the total out of the total number of out of the total number of
total number of fire calls. total number of fire calls.
number of fire calls. number of fire calls. fire calls. fire calls.
100% of fire, emergency 89% to 99% of fire,
E - 100% of fire, emergency 51% to 87% of fire, 50% or below of fire,
and rescue calls emergency and rescue 88% of fire, emergency and
and rescue calls responded emergency and rescue calls emergency and rescue calls
responded (fire related) calls responded (fire rescue calls responded (fire
(fire related) against total Efficiency (E) responded (fire related) responded (fire related)
2. Fire Calls Response against total number of related) against total related) against total number
number of fire EMS and rescue against total number of fire against total number of fire
fire EMS and rescue calls number of fire EMS and of fire EMS and rescue calls
calls EMS and rescue calls EMS and rescue calls
rescue calls

100% of fire calls and 91% to 99% of fire calls 51% to 89% of fire calls and 50% or below of fire calls
T - 100% of fire calls and 90% of fire calls and related
related emergencies and related emergencies related emergencies and related emergencies
PROVINCIAL related emergencies emergencies responded
responded within seven responded within seven (7) responded within seven (7) responded within seven (7)
CHIEF, responded within seven (7) Timeliness (T) within seven (7) minutes
(7) minutes (from receipt minutes (from receipt of minutes (from receipt of call minutes (from receipt of call
OPERATIONS minutes (from receipt of call (from receipt of call until
of call until arrival on the call until arrival on the fire until arrival on the fire until arrival on the fire
SECTION until arrival on the fire scene) arrival on the fire scene)
fire scene) scene) scene) scene)
Certified the correctness Certified the correctness of Certified the correctness of
Q - Certified the correctness of
of monthly fire incident monthly fire incident monthly fire incident
monthly fire incident monitoring Quality (Q) n/a n/a
monitoring reports with monitoring reports with monitoring reports with more
reports with no error.
no error. minimal (1-2) errors. than two (2) errors.
100% of the monthly fire
3. Monthly Fire Incident 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly NO monthly fire incident
E - 100% of the monthly fire incident monitoring
Monitoring Report fire incident monitoring fire incident monitoring fire incident monitoring monitoring reports
incident monitoring reports reports forwarded to
reports forwarded to higher reports forwarded to higher reports forwarded to higher forwarded to higher office
forwarded to higher office on Efficiency (E) higher office on 1st
office on 1st working day office on 1st working day of office on 1st working day of on 1st working day of the
1st working day of the following working day of the
of the following month the following month covering the following month covering following month covering the
month covering the report. following month covering
covering the report. the report. the report. report.
the report.
Timeliness (T)
Certified the correctness of
Q - Certified the correctness of Certified the correctness Certified the correctness of
monthly report on EMRS
monthly report on EMRS with Quality (Q) of monthly report on n/a monthly report on EMRS with n/a
with more than two (2)
no error. EMRS with no error. minimal (1-2) errors.
errors.

4. Monthly Report on 100% of the monthly 80% to 99% of the monthly


Emergency Medical and E - 100% of the monthly report report on EMRS report on EMRS forwarded
60% to 79% of the monthly 10% to 59% of the monthly NO monthly report on
Rescue Services on EMRS forwarded to higher report on EMRS forwarded to report on EMRS forwarded EMRS forwarded to higher
forwarded to higher office to higher office on 1st
office on 1st working day of the Efficiency (E) higher office on 1st working to higher office on 1st office on 1st working day of
on 1st working day of the working day of the
following month covering the day of the following month working day of the following the following month covering
following month covering following month covering
report. covering the report. month covering the report. the report.
the report. the report.
PROVINCIAL
CHIEF, Timeliness (T)
OPERATIONS Certified the correctness of
SECTION Q - Certified the correctness of Certified the correctness Certified the correctness of
the after activity report for
the after activity report for the of the after activity report the after activity report for the
the OPLAN SUMVAC/
OPLAN SUMVAC/ LAKBAY Quality (Q) for the OPLAN SUMVAC/ n/a OPLAN SUMVAC/ LAKBAY n/a
LAKBAY ALALAY with
ALALAY with no lapses or LAKBAY ALALAY with no ALALAY with minimal lapses
major lapses or more than
5. OPLAN SUMMER revision. lapses or revision. or one revision.
one revision.
VACATION/ LAKBAY
ALALAY Efficiency (E)
Implemented OPLAN Implemented OPLAN
T - Implemented OPLAN
SUMVAC/ LAKBAY SUMVAC/ LAKBAY
SUMVAC/ LAKBAY ALALAY
Timeliness (T) ALALAY on date n/a n/a n/a ALALAY earlier or later than
on date specified by the
specified by the National the specified date by the
National Office.
Office. National Office.

Page 15 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Certified the correctness
Certified the correctness of Certified the correctness of
Q - Certified the correctness of of the after activity report
the after activity report for the the after activity report for
the after activity report for the for the OPLAN
Quality (Q) n/a OPLAN KALULUWA n/a the OPLAN KALULUWA
OPLAN KALULUWA (UNDAS) KALULUWA (UNDAS)
(UNDAS) with minimal lapses (UNDAS) with major lapses
with no lapses or revision. with no lapses or
or one revision. or more than one revision.
6. OPLAN KALULUWA revision.
(UNDAS) Efficiency (E)
Implemented OPLAN Implemented OPLAN
T - Implemented OPLAN
OPLAN KALULUWA OPLAN KALULUWA
KALULUWA (UNDAS) on date
Timeliness (T) (UNDAS) on date n/a n/a n/a (UNDAS) earlier or later
specified by the National
PROVINCIAL specified by the National than the specified date by
Office.
CHIEF, Office. the National Office.
OPERATIONS Certified the correctness Certified the correctness of
SECTION Q - Certified the correctness of Certified the correctness of
of the after activity report the after activity report for
the after activity report for the the after activity report for the
for the OPLAN the OPLAN PAALALA:
OPLAN PAALALA: IWAS Quality (Q) n/a OPLAN PAALALA: IWAS n/a
PAALALA: IWAS IWAS PAPUTOK with major
PAPUTOK with no lapses or PAPUTOK with minimal
PAPUTOK with no lapses lapses or more than one
revision. lapses or one revision.
7. OPLAN PAALALA: or revision. revision.
IWAS PAPUTOK Efficiency (E)
Implemented OPLAN Implemented OPLAN
T - Implemented OPLAN
OPLAN KALULUWA OPLAN KALULUWA
KALULUWA (UNDAS) on date
Timeliness (T) (UNDAS) on date n/a n/a n/a (UNDAS) earlier or later
specified by the National
specified by the National than the specified date by
Office.
Office. the National Office.

Monitored the submission Failed to monitor the on time


of final investigation submission of final
Quality (Q) n/a n/a n/a
PROVINCIAL Q - Monitored the submission report of the operating investigation report of the
CHIEF, of final investigation report of units within AOR operating units within AOR.
INTELLIGENCE 1. Final Investigation the operating units within AOR.
AND Report within AOR 100% of the FIR were Failed to monitor the on time
INVESTIGATION submitted to higher offices on submission of final
SECTION time. Efficiency (E) . 100% of the FIR were n/a n/a n/a
investigation report of the
submitted to higher operating units within AOR.
offices on time.
Timeliness (T)
Certified the correctness
Q - Certified the correctness of Certified the correctness of
of the consolidated
the consolidated monthly fire the consolidated monthly
Quality (Q) monthly fire incident n/a n/a n/a
incident monitoring report with fire incident monitoring
monitoring report with no
no lapses. report with lapses.
lapses.

2. Monthly Fire Incident 100% of the monthly fire 80% to 99% of the monthly 10% to 59% of the monthly
Monitoring Report E - 100% of the monthly fire 60% to 79% of the monthly NO monthly fire incident
incident reports fire incident reports fire incident reports
incident reports submitted to fire incident reports submitted reports submitted to higher
submitted to higher office submitted to higher office submitted to higher office on
higher office on 1st working Efficiency (E) to higher office on 1st office on 1st working day of
on 1st working day of the on 1st working day of the 1st working day of the
day of the following month working day of the following the following month covering
PROVINCIAL following month covering following month covering following month covering the
covering the report. month covering the report. the report.
CHIEF, the report. the report. report.
INTELLIGENCE
AND Timeliness (T)
INVESTIGATION
SECTION 100% of the fire incident 80% to 99% of the fire 60% to 79% of the fire 10% to 59% of the fire Below 10% of the fire
Q - 100% of the fire incident
cases within level of incident cases within level incident cases within level of incident cases within level of incident cases within level of
cases within level of authority Quality (Q)
authority with final of authority with final authority with final authority with final authority with final
with final investigation report.
investigation report. investigation report. investigation report. investigation report. investigation report.

3. Fire Investigation
Page 16 of 30
SECTION

SUCCESS INDICATOR Description


DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
3. Fire Investigation
E - 100% final investigation 100% final investigation 80% to 99% final 60% to 79% final 10% to 59% final Below 10% final
report submitted to higher report submitted to higher investigation report investigation report submitted investigation report investigation report
Efficiency (E)
offices within reglementary offices within submitted to higher offices to higher offices within submitted to higher offices submitted to higher offices
period. reglementary period. within reglementary period. reglementary period. within reglementary period. within reglementary period.

Timeliness (T)
Monitored arson cases
Q - Monitored arson cases
within AOR and level of Failed to monitor arson
PROVINCIAL within AOR and level of Quality (Q) n/a n/a n/a
authority up to final cases.
CHIEF, authority up to final resolution.
resolution.
INTELLIGENCE
4. Arson Cases E - 100% of arson cases filed 80% to 100% of arson
AND 23% to 79% of arson 22% of arson cases filed in 21% and below of arson
INVESTIGATION in court against total number of cases filed in court
Efficiency (E) cases filed in court against court against total number of cases filed in court against n/a
SECTION arson fires within AOR and against total number of
total number of arson fires. arson fires. total number of arson fires.
level of authority. arson fires.
Timeliness (T)
Quality (Q)

100% of the monthly 80% to 99% of the monthly


E - 100% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
monitoring reports for monitoring reports for NO monthly monitoring
monitoring reports for OPLAN monitoring reports for OPLAN monitoring reports for
OPLAN LIGTAS NA OPLAN LIGTAS NA reports for OPLAN LIGTAS
LIGTAS NA PAMAYANAN LIGTAS NA PAMAYANAN OPLAN LIGTAS NA
1. OPLAN LIGTAS NA PAMAYANAN forwarded PAMAYANAN forwarded NA PAMAYANAN forwarded
forwarded to higher office on Efficiency (E) forwarded to higher office on PAMAYANAN forwarded to
PAMAYANAN to higher office on 2nd to higher office on 2nd to higher office on 2nd
2nd working day of the 2nd working day of the higher office on 2nd working
working day of the working day of the working day of the following
following month covering the following month covering the day of the following month
following month covering following month covering month covering the report.
report. report. covering the report.
PROVINCIAL FIRE the report. the report.
SAFETY
ENFORCEMENT Timeliness (T)
SECTION Quality (Q)
100% ratio of
E - 100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Community Fire
Fire Protection Plan (CFPP) Community Fire Protection Community Fire Protection Community Fire Protection Community Fire Protection
Protection Plan (CFPP)
2. Community Fire formulated by the operating Plan (CFPP) formulated by Plan (CFPP) formulated by Plan (CFPP) formulated by Plan (CFPP) formulated by
Efficiency (E) formulated by the
Protection Plan (CFPP) units in 1st Quarter vis-à-vis the operating units vis-à- the operating units vis-à-vis the operating units vis-à-vis the operating units vis-à-vis
operating units vis-à-vis
total number of target vis total number of target total number of target total number of target total number of target
total number of target
barangays within AOR. barangays within AOR. barangays within AOR. barangays within AOR. barangays within AOR.
barangays within AOR.
Timeliness (T)
100% Community Fire
95% to 99% Community 90% to 94% Community Fire 85% to 89% Community Below 85% Community Fire
Auxiliary Group
Fire Auxiliary Group Auxiliary Group established Fire Auxiliary Group Auxiliary Group established
Q - Community Fire Auxiliary established and trained
established and trained by and trained by the operating established and trained by and trained by the operating
Group established and trained Quality (Q) by the operating units
the operating units vis-à- units vis-à-vis total number the operating units vis-à-vis units vis-à-vis total number
3. Community Fire vis-à-vis total number of
by the operating units vis-à-vis vis total number of target of target barangays within total number of target of target barangays within
Auxiliary Group (CFAG) target barangays within
total number of target barangays within AOR. AOR. barangays within AOR. AOR.
barangays within AOR. AOR.
Efficiency (E)
Timeliness (T)
Quality (Q)

100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly NO monthly report of
E - 100% of the monthly report 60% to 79% of the monthly
report of accountability report of accountability for report of accountability for accountability for
of accountability for report of accountability for
PROVINCIAL FIRE 4. Monthly Report of accountable forms forwarded to
for accountable forms accountable forms
accountable forms forwarded
accountable forms accountable forms
SAFETY Accountability for Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office forwarded to higher office
higher office on 5th working to higher office on 5th
ENFORCEMENT Accountable Forms day of the following month
on 5th working day of the on 5th working day of the
working day of the following
on 5th working day of the on 5th working day of the
SECTION following month covering following month covering following month covering the following month covering the
covering the report. month covering the report.
the report. the report. report. report.

Timeliness (T)
Page 17 of 30
SECTION

SUCCESS INDICATOR Description


DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Quality (Q)

100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report on
report on summary of report on summary of report on summary of report on summary of
on summary of collections and summary of collections and
5. Monthly Report on collections and deposits collections and deposits collections and deposits collections and deposits
deposits forwarded to higher deposits forwarded to higher
Summary of Collections Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office on forwarded to higher office
office on 5th working day of the office on 5th working day of
and Deposits on 5th working day of the on 5th working day of the 5th working day of the on 5th working day of the
following month covering the the following month covering
following month covering following month covering following month covering the following month covering the
report. the report.
the report. the report. report. report.

Timeliness (T)
Q - 100% ratio of Fire Code 100% ratio of Fire Code 95% to 99% ratio of Fire 90% to 94% ratio of Fire 85% to 89% ratio of Fire Below 85% ratio of Fire
Fees collection vis-à-vis actual Fees collection vis-à-vis Code Fees collection vis- Code Fees collection vis-à- Code Fees collection vis-à- Code Fees collection vis-à-
Quality (Q)
PROVINCIAL FIRE remittance to the Bureau of actual remittance to the à-vis actual remittance to vis actual remittance to the vis actual remittance to the vis actual remittance to the
SAFETY Treasury. Bureau of Treasury. the Bureau of Treasury. Bureau of Treasury. Bureau of Treasury. Bureau of Treasury.
6. Fire Code Fees
ENFORCEMENT E - 2% increase of fire code Above 2% increase of fire 2% increase of fire code Below 2% increase of fire
SECTION revenues from the preceding Efficiency (E) code revenues from the n/a revenues from the preceding code revenues from the n/a
year. preceding year. year. preceding year.
Timeliness (T)
Q - Administered the SALN of Administered the SALN Administered the SALN of Administered the SALN of
personnel with no error or Quality (Q) of personnel with no error n/a personnel with minimal error n/a personnel with major error
lapses. or lapses. or lapses. or lapses.
1. Statement of Assets, Efficiency (E)
Liabilities and Net Worth
(SALN) 100% of the collated
T - 100% of the collated SALN 100% of the collated SALN 100% of the collated SALN
SALN forwarded to
forwarded to higher office Timeliness (T) n/a forwarded to higher office n/a forwarded to higher office
higher office 1st week of
midweek of February. midweek of February. after midweek of February.
CITY/ MUNICIPAL February.
FIRE MARSHAL Quality (Q)

E - 100% of the monthly report 100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly NO monthly report of
of changes for unit code report of changes for unit report of changes for unit report of changes for unit report of changes for unit changes for unit code
2. Monthly Report of
forwarded to higher office on Efficiency (E) code forwarded to higher code forwarded to higher code forwarded to higher code forwarded to higher forwarded to higher office
Changes for Unit Code
15th working day of the of the office on 15th working office on 15th working day office on 15th working day of office on 15th working day on 15th working day of the
month. day of the of the month. of the of the month. the of the month. of the of the month. of the month.

Timeliness (T)
Quality (Q)
100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report 60% to 79% of the monthly NO monthly report of
report of changes for report of changes for report of changes for
of changes for pensioners report of changes for changes for pensioners
3. Monthly Report of pensioners forwarded to pensioners forwarded to pensioners forwarded to
forwarded to higher office on Efficiency (E) pensioners forwarded to forwarded to higher office
Changes for Pensioners higher office on 14th higher office on 14th higher office on 14th
14th working day of the of the higher office on 14th working on 14th working day of the
working day of the of the working day of the of the working day of the of the
month. day of the of the month. of the month.
month. month. month.
Timeliness (T)
Quality (Q)

100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly NO monthly report of
E - 100% of the monthly report 60% to 79% of the monthly
report of accountability report of accountability for report of accountability for accountability for
of accountability for report of accountability for
4. Monthly Report of for accountable forms accountable forms accountable forms accountable forms
accountable forms forwarded to accountable forms forwarded
Accountability for Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office forwarded to higher office
CITY/ MUNICIPAL Accountable Forms higher office on 3rd working to higher office on 3rd
on 3rd working day of the on 3rd working day of the on 3rd working day of the on 3rd working day of the
FIRE MARSHAL day of the following month working day of the following
following month covering following month covering following month covering the following month covering the
covering the report. month covering the report.
the report. the report. report. report.

Timeliness (T)
Quality (Q)

E - 100% of the monthly report Page 18 of 30


on summary of collections and
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1

100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report on
report on summary of report on summary of report on summary of report on summary of
on summary of collections and summary of collections and
5. Monthly Report on collections and deposits collections and deposits collections and deposits collections and deposits
deposits forwarded to higher deposits forwarded to higher
Summary of Collections Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office on forwarded to higher office
office on 3rd working day of the office on 3rd working day of
and Deposits on 3rd working day of the on 3rd working day of the 3rd working day of the on 3rd working day of the
following month covering the the following month covering
following month covering following month covering following month covering the following month covering the
report. the report.
the report. the report. report. report.

Timeliness (T)
Q - 100% ratio of Fire Code 100% ratio of Fire Code 95% to 99% ratio of Fire 90% to 94% ratio of Fire 85% to 89% ratio of Fire Below 85% ratio of Fire
Fees collection vis-à-vis actual Fees collection vis-à-vis Code Fees collection vis- Code Fees collection vis-à- Code Fees collection vis-à- Code Fees collection vis-à-
Quality (Q)
remittance to the Bureau of actual remittance to the à-vis actual remittance to vis actual remittance to the vis actual remittance to the vis actual remittance to the
Treasury. Bureau of Treasury. the Bureau of Treasury. Bureau of Treasury. Bureau of Treasury. Bureau of Treasury.
6. Fire Code Fees
E - 2% increase of fire code Above 2% increase of fire 2% increase of fire code Below 2% increase of fire
revenues from the preceding Efficiency (E) code revenues from the n/a revenues from the preceding code revenues from the n/a
year. preceding year. year. preceding year.
Timeliness (T)
Quality (Q)

100% of the monthly 80% to 99% of the monthly


60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly monitoring reports for monitoring reports for NO monthly monitoring
monitoring reports for OPLAN monitoring reports for
CITY/ MUNICIPAL monitoring reports for OPLAN OPLAN LIGTAS NA OPLAN LIGTAS NA reports for OPLAN LIGTAS
LIGTAS NA PAMAYANAN OPLAN LIGTAS NA
FIRE MARSHAL 7. OPLAN LIGTAS NA LIGTAS NA PAMAYANAN
Efficiency (E)
PAMAYANAN forwarded PAMAYANAN forwarded
forwarded to higher office on PAMAYANAN forwarded to
NA PAMAYANAN forwarded
PAMAYANAN forwarded to higher office on to higher office on 1st to higher office on 1st to higher office on 1st
1st working day of the higher office on 1st working
1st working day of the following working day of the working day of the working day of the following
following month covering the day of the following month
month covering the report. following month covering following month covering month covering the report.
report. covering the report.
the report. the report.

Timeliness (T)
Quality (Q)
100% Community Fire 95% to 99% Community
8. Community Fire E - Community Fire Protection 90% to 94% Community Fire 85% to 89% Community Below 85% Community Fire
Protection Plan (CFPP) Fire Protection Plan
Protection Plan (CFPP) Plan (CFPP) formulated in 1st Protection Plan (CFPP) Fire Protection Plan (CFPP) Protection Plan (CFPP)
Efficiency (E) formulated vis-à-vis total (CFPP) formulated vis-à-
*note breakdown to Quarter vis-à-vis total number formulated vis-à-vis total formulated vis-à-vis total formulated vis-à-vis total
number of target vis total number of target
QT of target barangays. number of target barangays. number of target barangays. number of target barangays.
barangays. barangays.
Timeliness (T) within the 1st quarter
100% Community Fire 95% to 99% Community 85% to 89% Community
90% to 94% Community Fire Below 85% Community Fire
Auxiliary Group Fire Auxiliary Group Fire Auxiliary Group
Q - Community Fire Auxiliary Quality (Q) Auxiliary Group established Auxiliary Group established
established and trained established and trained established and trained vis-
9. Community Fire Group established and trained and trained vis-à-vis total and trained vis-à-vis total
vis-à-vis total number of vis-à-vis total number of à-vis total number of target
Auxiliary Group (CFAG) vis-à-vis total number of target number of target barangays. number of target barangays.
target barangays. target barangays. barangays.
barangays.
Efficiency (E)
Timeliness (T)
100% of fire calls not 89% to 99% of fire calls 51% to 87% of fire calls not 50% or below of fire calls
Q - 100% of fire calls not 88% of fire calls not
exceeding 300,000 not exceeding 300,000 exceeding 300,000 not exceeding 300,000
exceeding 300,000 estimated exceeding 300,000 estimated
Quality (Q) estimated property estimated property estimated property damage estimated property damage
property damage out of the property damage out of the
damage out of the total damage out of the total out of the total number of out of the total number of
total number of fire calls. total number of fire calls.
number of fire calls. number of fire calls. fire calls. fire calls.
100% of fire, emergency 89% to 99% of fire,
E - 100% of fire, emergency 51% to 87% of fire, 50% or below of fire,
and rescue calls emergency and rescue 88% of fire, emergency and
and rescue calls responded emergency and rescue calls emergency and rescue calls
responded (fire related) calls responded (fire rescue calls responded (fire
(fire related) against total Efficiency (E) responded (fire related) responded (fire related)
10. Fire Calls Response number of fire EMS and rescue against total number of related) against total related) against total number
CITY/ MUNICIPAL against total number of fire against total number of fire
fire EMS and rescue calls number of fire EMS and of fire EMS and rescue calls
FIRE MARSHAL calls EMS and rescue calls EMS and rescue calls
rescue calls

Page 19 of 30
10. Fire Calls Response
CITY/ MUNICIPAL
SUCCESS INDICATOR Description
FIRE MARSHAL
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
100% of fire calls and 91% to 99% of fire calls 51% to 89% of fire calls and 50% or below of fire calls
T - 100% of fire calls and 90% of fire calls and related
related emergencies and related emergencies related emergencies and related emergencies
related emergencies emergencies responded
responded within seven responded within seven (7) responded within seven (7) responded within seven (7)
responded within seven (7) Timeliness (T) within seven (7) minutes
(7) minutes (from receipt minutes (from receipt of minutes (from receipt of call minutes (from receipt of call
minutes (from receipt of call (from receipt of call until
of call until arrival on the call until arrival on the fire until arrival on the fire until arrival on the fire
until arrival on the fire scene) arrival on the fire scene)
fire scene) scene) scene) scene)
Quality (Q)
100% of the monthly fire
99% to 80% of the monthly 79% to 60% of the monthly 59% to 10% of the monthly NO monthly fire incident
E - 100% of the monthly fire incident monitoring
fire incident monitoring fire incident monitoring fire incident monitoring monitoring reports
incident monitoring reports reports forwarded to
11. Monthly Fire Incident reports forwarded to higher reports forwarded to higher reports forwarded to higher forwarded to higher office
forwarded to higher office on Efficiency (E) higher office on 1st
Monitoring Report office on 1st working day office on 1st working day of office on 1st working day of on 1st working day of the
1st working day of the following working day of the
of the following month the following month covering the following month covering following month covering the
month covering the report. following month covering
covering the report. the report. the report. report.
the report.
Timeliness (T)
Quality (Q)
100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report of
report of changes for unit report of changes for unit report of changes for unit report of changes for unit
1. Monthly Report of of changes for unit code changes for unit code
Efficiency (E) code prepared on 15th code prepared on 15th code prepared on 15th code prepared on 15th
Changes for Unit Code prepared on 15th working day prepared on 15th working
working day of the of the working day of the of the working day of the of the working day of the of the
of the of the month. day of the of the month.
month. month. month. month.
Timeliness (T)
Quality (Q)
100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report of
report of changes for report of changes for report of changes for report of changes for
2. Monthly Report of of changes for pensioners changes for pensioners
Efficiency (E) pensioners prepared on pensioners prepared on pensioners prepared on 14th pensioners prepared on
Changes for Pensioners prepared on 14th working day prepared on 14th working
14th working day of the 14th working day of the of working day of the of the 14th working day of the of
CHIEF, of the of the month. day of the of the month.
of the month. the month. month. the month.
ADMINISTRATIVE
UNIT Timeliness (T)
Quality (Q)
100% of the applied/ filed 80% to 99% of the 60% to 79% of the 10% to 59% of the
E - 100% of the applied/filed NO applied/filed leave were
leave were acted upon applied/filed leave were applied/filed leave were acted applied/filed leave were
3. Leave Form leave were acted upon within Efficiency (E) acted upon within fifteen
within fifteen (15) acted upon within fifteen upon within fifteen (15) acted upon within fifteen
fifteen (15) minutes. (15) minutes.
minutes. (15) minutes. minutes. (15) minutes.
Timeliness (T)
Quality (Q)
100% of the requested 80% to 99% of the 60% to 79% of the requested 10% to 59% of the
E - 100% of the requested NO requested service
service record were requested service record service record were acted requested service record
4. Service Record service record were acted upon Efficiency (E) record were acted upon
acted upon within fifteen were acted upon within upon within fifteen (15) were acted upon within
within fifteen (15) minutes. within fifteen (15) minutes.
(15) minutes. fifteen (15) minutes. minutes. fifteen (15) minutes.
Timeliness (T)
Quality (Q)

E - 100% of the requested 100% of the requested 80% to 99% of the 60% to 79% of the requested 10% to 59% of the
NO requested service
service rendered were acted service rendered were requested service service rendered were acted requested service rendered
5. Service Rendered Efficiency (E) rendered were acted upon
upon within fifteen (15) acted upon within fifteen rendered were acted upon upon within fifteen (15) were acted upon within
within fifteen (15) minutes.
minutes. (15) minutes. within fifteen (15) minutes. minutes. fifteen (15) minutes.

Timeliness (T)
Q - Administered the SALN of Administered the SALN Administered the SALN of Administered the SALN of
personnel with no error or Quality (Q) of personnel with no error n/a personnel with minimal error n/a personnel with major error
lapses. or lapses. or lapses. or lapses.
6. Statement of Assets, Efficiency (E)
Liabilities and Net Worth
(SALN)

Page 20 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS
6. Statement of Assets, Variables
(TARGETS + MEASURES) 5 4 3 2 1
Liabilities and Net Worth
(SALN) 100% of the collated
T - 100% of the collated SALN 100% of the collated SALN 100% of the collated SALN
SALN forwarded to
forwarded to higher office Timeliness (T) n/a forwarded to higher office n/a forwarded to higher office
higher office 1st week of
midweek of February. midweek of February. after midweek of February.
February.
CHIEF,
ADMINISTRATIVE 100% of the 90% to 99% of the 70% to 89% of the 50% to 69% of the Below 50% of the
Q - 100% of the
UNIT memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
memoranda/letters/
Quality (Q) communications communications approved communications approved by communications approved communications approved
communications approved by
approved by superior by superior upon 1st superior upon 1st by superior upon 1st by superior upon 1st
superior upon 1st submission.
upon 1st submission. submission. submission. submission. submission.
7. Memoranda/ Letters/
Communications 100% of the 90% to 99% of the
E - 100% of the 70% to 89% of the 50% to 69% of the Below 50% of the
memoranda/letters/ memoranda/ letters/
memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
Efficiency (E) communications acted communications acted
communications acted upon communications acted upon communications acted upon communications acted upon
upon within fifteen (15) upon within fifteen (15)
within fifteen (15) minutes. within fifteen (15) minutes. within fifteen (15) minutes. within fifteen (15) minutes.
minutes. minutes.
Timeliness (T)
Maintained an UPDATED Maintained summary of
summary of information information of all personnel
Q - Maintained an updated Quality (Q) n/a n/a n/a
8. Summary of of all personnel within within AOR but failed to
summary of information of all AOR. update.
Information (SOI)
personnel within AOR.
Efficiency (E)
Timeliness (T)
Q - Summary of the IPCR's Summary of the IPCR's Summary of the IPCR's
rating matrix of personnel rating matrix of personnel rating matrix of personnel
Quality (Q) n/a n/a n/a
within AOR prepared without within AOR prepared within AOR prepared with
error. without error. error.
9. Individual Efficiency (E)
CHIEF,
Performance
ADMINISTRATIVE
Commitment and Review T - Summary of the IPCR's Summary of the IPCR's Summary of the IPCR's
UNIT rating matrix of personnel rating matrix of personnel rating matrix of personnel
(IPCR)
within AOR forwarded to higher within AOR forwarded to within AOR forwarded to
Timeliness (T) n/a n/a n/a
office every 1st day of the higher office on 1st day higher office after the 1st
month following the covered of the month following the day of the month following
semester. covered semester. the covered semester.

100% of the 90% to 99% of the 70% to 89% of the 50% to 69% of the Below 50% of the
Q - 100% of the memoranda/
memoranda/letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
letters/ communications
Quality (Q) communications communications approved communications approved by communications approved communications approved
approved by superior upon 1st
approved by superior by superior upon 1st superior upon 1st by superior upon 1st by superior upon 1st
submission.
CHIEF, upon 1st submission. submission. submission. submission. submission.
1. Memoranda/ Letters/
OPERATIONS 100% of the 90% to 99% of the
Communications E - 100% of the memoranda / 70% to 89% of the 50% to 69% of the Below 50% of the
UNIT memoranda/letters/ memoranda/ letters/
letters/ communications acted memoranda/ letters/ memoranda/ letters/ memoranda/ letters/
Efficiency (E) communications acted communications acted
upon within fifteen (15) communications acted upon communications acted upon communications acted upon
upon within fifteen (15) upon within fifteen (15)
minutes. within fifteen (15) minutes. within fifteen (15) minutes. within fifteen (15) minutes.
minutes. minutes.
Timeliness (T)
100% of fire calls not 89% to 99% of fire calls 51% to 87% of fire calls not 50% or below of fire calls
Q - 100% of fire calls not 88% of fire calls not
exceeding 300,000 not exceeding 300,000 exceeding 300,000 not exceeding 300,000
exceeding 300,000 estimated exceeding 300,000 estimated
Quality (Q) estimated property estimated property estimated property damage estimated property damage
property damage out of the property damage out of the
damage out of the total damage out of the total out of the total number of out of the total number of
total number of fire calls. total number of fire calls.
number of fire calls. number of fire calls. fire calls. fire calls.

2. Fire Calls Response

CHIEF, Page 21 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
100% of fire, emergency 89% to 99% of fire,
E - 100% of fire, emergency 51% to 87% of fire, 50% or below of fire,
and rescue calls emergency and rescue 88% of fire, emergency and
and rescue calls responded emergency and rescue calls emergency and rescue calls
responded (fire related) calls responded (fire rescue calls responded (fire
(fire related) against total Efficiency (E) responded (fire related) responded (fire related)
2. Fire Calls Response against total number of related) against total related) against total number
number of fire EMS and rescue against total number of fire against total number of fire
fire EMS and rescue calls number of fire EMS and of fire EMS and rescue calls
calls EMS and rescue calls EMS and rescue calls
rescue calls
CHIEF,
OPERATIONS 100% of fire calls and 91% to 99% of fire calls 51% to 89% of fire calls and 50% or below of fire calls
T - 100% of fire calls and 90% of fire calls and related
UNIT related emergencies and related emergencies related emergencies and related emergencies
related emergencies emergencies responded
responded within seven responded within seven (7) responded within seven (7) responded within seven (7)
responded within seven (7) Timeliness (T) within seven (7) minutes
(7) minutes (from receipt minutes (from receipt of minutes (from receipt of call minutes (from receipt of call
minutes (from receipt of call (from receipt of call until
of call until arrival on the call until arrival on the fire until arrival on the fire until arrival on the fire
until arrival on the fire scene) arrival on the fire scene)
fire scene) scene) scene) scene)
Quality (Q)
89% to 99% of the 51% to 87% of the 50% or below of the
E - 100% of the emergency 100% of the emergency 88% of the emergency
emergency medical and emergency medical and emergency medical and
3. Emergency Medical medical and rescue calls medical and rescue calls medical and rescue calls
Efficiency (E) rescue calls responded rescue calls responded rescue calls responded
and Rescue Services responded within seven (7) responded within seven responded within seven (7)
within seven (7) minutes within seven (7) minutes within seven (7) minutes
minutes arrival time. (7) minutes arrival time. minutes arrival time.
arrival time. arrival time. arrival time.
Timeliness (T)
Certified the correctness of
Q - Certified the correctness of Certified the correctness Certified the correctness of
the after activity report for
the after activity report for the of the after activity report the after activity report for the
the OPLAN SUMVAC/
OPLAN SUMVAC/ LAKBAY Quality (Q) for the OPLAN SUMVAC/ n/a OPLAN SUMVAC/ LAKBAY n/a
LAKBAY ALALAY with
ALALAY with no lapses or LAKBAY ALALAY with no ALALAY with minimal lapses
major lapses or more than
4. OPLAN SUMMER revision. lapses or revision. or one revision.
one revision.
VACATION/ LAKBAY
ALALAY Efficiency (E)
Implemented OPLAN Implemented OPLAN
T - Implemented OPLAN
SUMVAC/ LAKBAY SUMVAC/ LAKBAY
SUMVAC/ LAKBAY ALALAY
Timeliness (T) ALALAY on date n/a n/a n/a ALALAY earlier or later than
on date specified by the
specified by the National the specified date by the
CHIEF, National Office.
Office. National Office.
OPERATIONS
UNIT Certified the correctness
Certified the correctness of Certified the correctness of
Q - Certified the correctness of of the after activity report
the after activity report for the the after activity report for
the after activity report for the for the OPLAN
Quality (Q) n/a OPLAN KALULUWA n/a the OPLAN KALULUWA
OPLAN KALULUWA (UNDAS) KALULUWA (UNDAS)
(UNDAS) with minimal lapses (UNDAS) with major lapses
with no lapses or revision. with no lapses or
or one revision. or more than one revision.
5. OPLAN KALULUWA revision.
(UNDAS) Efficiency (E)
Implemented OPLAN Implemented OPLAN
T - Implemented OPLAN
OPLAN KALULUWA OPLAN KALULUWA
KALULUWA (UNDAS) on date
Timeliness (T) (UNDAS) on date n/a n/a n/a (UNDAS) earlier or later
specified by the National
specified by the National than the specified date by
Office.
Office. the National Office.
Certified the correctness Certified the correctness of
Q - Certified the correctness of Certified the correctness of
of the after activity report the after activity report for
the after activity report for the the after activity report for the
for the OPLAN the OPLAN PAALALA:
OPLAN PAALALA: IWAS Quality (Q) n/a OPLAN PAALALA: IWAS n/a
PAALALA: IWAS IWAS PAPUTOK with major
PAPUTOK with no lapses or PAPUTOK with minimal
PAPUTOK with no lapses lapses or more than one
revision. lapses or one revision.
6. OPLAN PAALALA: or revision. revision.
IWAS PAPUTOK Efficiency (E)
CHIEF,
OPERATIONS
UNIT

Page 22 of 30
6. OPLAN PAALALA: SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
IWAS PAPUTOK (TARGETS + MEASURES) 5 4 3 2 1
CHIEF, Implemented OPLAN Implemented OPLAN
OPERATIONS T - Implemented OPLAN
OPLAN KALULUWA OPLAN KALULUWA
UNIT KALULUWA (UNDAS) on date
Timeliness (T) (UNDAS) on date n/a n/a n/a (UNDAS) earlier or later
specified by the National
specified by the National than the specified date by
Office.
Office. the National Office.

8. OPLAN Maintained an UPDATED Maintained contingency


Quality (Q) n/a n/a n/a
PAGHAHANDA LABAN Q - Maintained an UPDATED contingency plan. plan but failed to update.
SA SAKUNA contingency plan.
(PAGHALASA) Efficiency (E)
Timeliness (T)
Spot report prepared and
Q - Spot report prepared and Spot report prepared and Spot report prepared and
submitted to Fire Marshal
submitted to Fire Marshal with Quality (Q) submitted to Fire Marshal n/a submitted to Fire Marshal n/a
with more than two (2)
no error. with no error. with minimal (1-2) errors.
errors.
CHIEF,
INTELLIGENCE 100% of the spot report 80% to 99% of the spot 60% to 79% of the spot 10% to 59% of the spot Below 10% of the spot
1. Spot Investigation E - 100% of the spot report
AND submitted to Fire Marshal report submitted to Fire report submitted to Fire report submitted to Fire report submitted to Fire
Report submitted to Fire Marshal copy
INVESTIGATION copy furnished higher Marshal copy furnished Marshal copy furnished Marshal copy furnished Marshal copy furnished
UNIT furnished higher offices within Efficiency (E)
offices within the higher offices within the higher offices within the higher offices within the higher offices within the
the reglementary period
reglementary period reglementary period reglementary period reglementary period reglementary period
(24hours).
(24hours). (24hours). (24hours). (24hours). (24hours).
Timeliness (T)
Certified the correctness
Q - Certified the correctness of Certified the correctness of
of the consolidated
the consolidated monthly fire the consolidated monthly
Quality (Q) monthly fire incident n/a n/a n/a
incident monitoring report with fire incident monitoring
monitoring report with no
no lapses. report with lapses.
lapses.

2. Monthly Fire Incident 100% of the monthly fire 80% to 99% of the monthly 10% to 59% of the monthly
Monitoring Report E - 100% of the monthly fire 60% to 79% of the monthly NO monthly fire incident
incident reports fire incident reports fire incident reports
incident reports submitted to fire incident reports submitted reports submitted to higher
submitted to higher office submitted to higher office submitted to higher office on
higher office on 1st working Efficiency (E) to higher office on 1st office on 1st working day of
on 1st working day of the on 1st working day of the 1st working day of the
day of the following month working day of the following the following month covering
following month covering following month covering following month covering the
covering the report. month covering the report. the report.
the report. the report. report.

Timeliness (T)

Q - fire incident cases within fire incident cases within fire incident cases within fire incident cases within level fire incident cases within fire incident cases within
CHIEF, level of authority with final Quality (Q) level of authority with level of authority with final of authority with final level of authority with final level of authority with final
INTELLIGENCE investigation report. final investigation report. investigation report. investigation report. investigation report. investigation report.
AND
INVESTIGATION E - 100% final investigation 100% final investigation 80% to 99% final 60% to 79% final 10% to 59% final Below 10% final
UNIT 3. Fire Investigation
report submitted to higher report submitted to higher investigation report investigation report submitted investigation report investigation report
Efficiency (E)
offices within reglementary offices within submitted to higher offices to higher offices within submitted to higher offices submitted to higher offices
period. reglementary period. within reglementary period. reglementary period. within reglementary period. within reglementary period.

Timeliness (T) n/a n/a


Submitted within 24 hours Submitted after 2 days Failed to submit
Monitored arson cases
Q - Monitored arson cases
within AOR and level of Failed to monitor arson
within AOR and level of Quality (Q) n/a n/a n/a
authority up to final cases.
authority up to final resolution.
resolution.

4. Arson Cases E - 100% of arson cases filed 80% to 100% of arson


23% to 79% of arson 22% of arson cases filed in 21% and below of arson
in court against total number of cases filed in court
Efficiency (E) cases filed in court against court against total number of cases filed in court against n/a
arson fires within AOR and against total number of
total number of arson fires. arson fires. total number of arson fires.
level of authority. arson fires.

Page 23 of 30
4. Arson Cases
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Timeliness (T) n/a n/a
Submitted within 24 hours Submitted after 2 days Failed to submit
Quality (Q)

100% of the monthly 80% to 99% of the monthly


60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly monitoring reports for monitoring reports for NO monthly monitoring
monitoring reports for OPLAN monitoring reports for
monitoring reports for OPLAN OPLAN LIGTAS NA OPLAN LIGTAS NA reports for OPLAN LIGTAS
LIGTAS NA PAMAYANAN OPLAN LIGTAS NA
1. OPLAN LIGTAS NA LIGTAS NA PAMAYANAN PAMAYANAN forwarded PAMAYANAN forwarded NA PAMAYANAN forwarded
Efficiency (E) forwarded to higher office on PAMAYANAN forwarded to
PAMAYANAN forwarded to higher office on to higher office on 1st to higher office on 1st to higher office on 1st
1st working day of the higher office on 1st working
1st working day of the following working day of the working day of the working day of the following
following month covering the day of the following month
month covering the report. following month covering following month covering month covering the report.
report. covering the report.
the report. the report.

Timeliness (T)

Quality (Q) Full implementation of n/a n/a n/a Failed to establish the CFAG in
CFPP in the target barangay the target barangay
E - 100% ratio of Formulated 95% to 99% ratio of
Community Fire Protection 100% ratio of Formulated 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
2. Community Fire Formulated Community
Plan (CFPP) vis-a-vis total Community Fire Formulated Community Fire Formulated Community Fire Formulated Community Fire
Protection Plan (CFPP) Fire Protection Plan
number of target barangays in Efficiency (E) Protection Plan (CFPP) Protection Plan (CFPP) vis-a- Protection Plan (CFPP) vis- Protection Plan (CFPP) vis-
(CFPP) vis-a-vis total
first (1st) quarter. vis-a-vis total number of vis total number of target a-vis total number of target a-vis total number of target
number of target
target barangays in first barangays in first (1st) barangays in first (1st) barangays in first (1st)
barangays in first (1st)
CHIEF, FIRE (1st) quarter. quarter. quarter. quarter.
quarter.
SAFETY
ENFORCEMENT Timeliness (T)
UNIT
Full implementation of
Quality (Q) Community Fire Auxiliary n/a n/a n/a
Group in the target Failed to establish the CFAG in
E - Community Fire Auxiliary barangay the target barangay
3. Community Fire Group established and trained 100% Community Fire 95% to 99% Community 85% to 89% Community
Auxiliary Group (CFAG) vis-à-vis total number of target 90% to 94% Community Fire Below 85% Community Fire
Auxiliary Group Fire Auxiliary Group Fire Auxiliary Group
barangays. Auxiliary Group established Auxiliary Group established
Efficiency (E) established and trained established and trained established and trained vis-
and trained vis-à-vis total and trained vis-à-vis total
vis-à-vis total number of vis-à-vis total number of à-vis total number of target
number of target barangays. number of target barangays.
target barangays. target barangays. barangays.
Timeliness (T) within the 1st quarter
Quality (Q)

100% of the monthly 80% to 99% of the monthly 10% to 59% of the monthly NO monthly report of
E - 100% of the monthly report 60% to 79% of the monthly
report of accountability report of accountability for report of accountability for accountability for
of accountability for report of accountability for
4. Monthly Report of for accountable forms accountable forms accountable forms accountable forms
accountable forms forwarded to accountable forms forwarded
Accountability for Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office forwarded to higher office
higher office on 5th working to higher office on 5th
Accountable Forms on 5th working day of the on 5th working day of the on 5th working day of the on 5th working day of the
day of the following month working day of the following
following month covering following month covering following month covering the following month covering the
covering the report. month covering the report.
the report. the report. report. report.

Timeliness (T)
Quality (Q)

100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report on
report on summary of report on summary of report on summary of report on summary of
on summary of collections and summary of collections and
5. Monthly Report on collections and deposits collections and deposits collections and deposits collections and deposits
deposits forwarded to higher deposits forwarded to higher
Summary of Collections Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office on forwarded to higher office
office on 5th working day of the office on 5th working day of
and Deposits on 5th working day of the on 5th working day of the 5th working day of the on 5th working day of the
following month covering the the following month covering
following month covering following month covering following month covering the following month covering the
report. the report.
CHIEF, FIRE the report. the report. report. report.
SAFETY
ENFORCEMENT Timeliness (T)
UNIT
Page 24 of 30
CHIEF, FIRE
SAFETY SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
ENFORCEMENT (TARGETS + MEASURES) 5 4 3 2 1
UNIT Q - 100% ratio of Fire Code 100% ratio of Fire Code 95% to 99% ratio of Fire 90% to 94% ratio of Fire 85% to 89% ratio of Fire Below 85% ratio of Fire
Fees collection vis-à-vis actual Fees collection vis-à-vis Code Fees collection vis- Code Fees collection vis-à- Code Fees collection vis-à- Code Fees collection vis-à-
Quality (Q)
remittance to the Bureau of actual remittance to the à-vis actual remittance to vis actual remittance to the vis actual remittance to the vis actual remittance to the
Treasury. Bureau of Treasury. the Bureau of Treasury. Bureau of Treasury. Bureau of Treasury. Bureau of Treasury.
6. Fire Code Fees
E - 2% increase of fire code Above 2% increase of fire 2% increase of fire code Below 2% increase of fire
revenues from the preceding Efficiency (E) code revenues from the n/a revenues from the preceding code revenues from the n/a
year. preceding year. year. preceding year.
Timeliness (T)
Quality (Q)
100% of fire incidents 71 to 99% of fire incidents 51 to 69% of fire incidents 50% and below of fire
E - 100% of fire incidents 70% of fire incidents
1. Fire Incident investigated against total investigated against total investigated against total incidents investigated
investigated against total no. of Efficiency (E) investigated against total no.
Investigation no. of fire incidents no. of fire incidents no. of fire incidents against total no. of fire
fire incidents responded. of fire incidents responded.
responded. responded. responded. incidents responded.
Fire Arson Timeliness (T)
Investigator Quality (Q)
100% of fire incidents 21% and below of arson
E - 100% of arson fire cases 23 to 79% of arson fire 22% of arson fire cases filed
investigated against total fire cases filed in court
2. Arson Cases filed in court against toal no. of Efficiency (E) cases filed in court against in court against toal no. of n/a
no. of fire incidents against toal no. of arson
arson fires. toal no. of arson fires. arson fires.
responded. fires.
Timeliness (T)
Spot investigation report Spot investigation report Spot investigation report
Q - Spot investigation report
prepared and submitted prepared and submitted to prepared and submitted to
prepared and submitted to Fire Quality (Q) n/a n/a
to Fire Marshal with no Fire Marshal with minimal (1- Fire Marshal with more than
Marshal with no error.
error. 2) errors. two (2) errors.
3. Spot Investigation
Report
100% of the spot 80-99% of the spot 10-59% of the spot Below 10% of the spot
E - 100% of the spot 60-79% of the spot
investigation report investigation report investigation report investigation report
investigation report submitted investigation report submitted
submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal
to Fire Marshal copy furnished to Fire Marshal copy
Efficiency (E) copy furnished higher copy furnished higher copy furnished higher copy furnished higher
higher offices within 24 hours furnished higher offices within
offices within 24 hours offices within 24 hours offices within 24 hours after offices within 24 hours after
after the occurrence of fire 24 hours after the occurrence
after the occurrence of after the occurrence of fire the occurrence of fire the occurrence of fire
incident. of fire incident.
fire incident. incident. incident. incident.

Timeliness (T)
Fire Arson
Investigator Progress investigation
Progress investigation Progress investigation report
Q - Progress investigation report prepared and
report prepared and prepared and submitted to
report prepared and submitted Quality (Q) n/a n/a submitted to Fire Marshal
submitted to Fire Marshal Fire Marshal with minimal (1-
to Fire Marshal with no error. with more than two (2)
with no error. 2) errors.
errors.

4. Progress Investigation E - 100% of the progress 100% of the progress 80-99% of the progress 10-59% of the progress Below 10% of the progress
60-79% of the progress
Report investigation report investigation report investigation report investigation report
investigation report submitted investigation report submitted
submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal
to Fire Marshal copy furnished to Fire Marshal copy
Efficiency (E) copy furnished higher copy furnished higher copy furnished higher copy furnished higher
higher offices within 7 to 15 furnished higher offices within
offices within 7 to 15 offices within 7 to 15 days offices within 7 to 15 days offices within 7 to 15 days
days from the inception of the 7 to 15 days from the
days from the inception from the inception of the from the inception of the from the inception of the
investigation. inception of the investigation.
of the investigation. investigation. investigation. investigation.

Timeliness (T)
Final investigation report Final investigation report Final investigation report
Q - Final investigation report
prepared and submitted prepared and submitted to prepared and submitted to
prepared and submitted to Fire Quality (Q) n/a n/a
to Fire Marshal with no Fire Marshal with minimal (1- Fire Marshal with more than
Marshal with no error.
error. 2) errors. two (2) errors.

Fire Arson 5. Final Investigation


Investigator Report
Page 25 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1

100% of the final 80-90% of the final 40-50%of the final Below 10% of the final
Fire Arson 5. Final Investigation E - 100% of the final 60-70% of the final
investigation report investigation report investigation report investigation report
Investigator Report investigation report submitted investigation report submitted
submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal submitted to Fire Marshal
to Fire Marshal copy furnished to Fire Marshal copy
Efficiency (E) copy furnished higher copy furnished higher copy furnished higher copy furnished higher
higher offices within 30 to 45 furnished higher offices within
offices within 30 to 45 offices within 30 to 45 days offices within 30 to 45 days offices within 30 to 45 days
days from the inception of the 30 to 45 days from the
days from the inception from the inception of the from the inception of the from the inception of the
investigation. inception of the investigation.
of the investigation. investigation. investigation. investigation.

Timeliness (T)
100% of fire calls not 89% to 99% of fire calls 51% to 87% of fire calls not 50% or below of fire calls
Q - 100% of fire calls not 88% of fire calls not
exceeding 300,000 not exceeding 300,000 exceeding 300,000 not exceeding 300,000
exceeding 300,000 estimated exceeding 300,000 estimated
Quality (Q) estimated property estimated property estimated property damage estimated property damage
property damage out of the property damage out of the
damage out of the total damage out of the total out of the total number of out of the total number of
total number of fire calls. total number of fire calls.
number of fire calls. number of fire calls. fire calls. fire calls.
100% of fire, emergency 89% to 99% of fire,
E - 100% of fire, emergency 51% to 87% of fire, 50% or below of fire,
and rescue calls emergency and rescue 88% of fire, emergency and
Driver - Pump and rescue calls responded emergency and rescue calls emergency and rescue calls
responded (fire related) calls responded (fire rescue calls responded (fire
Operator / (fire related) against total Efficiency (E) responded (fire related) responded (fire related)
1. Fire Calls Response against total number of related) against total related) against total number
Lineman / number of fire EMS and rescue against total number of fire against total number of fire
fire EMS and rescue calls number of fire EMS and of fire EMS and rescue calls
Nozzleman calls EMS and rescue calls EMS and rescue calls
rescue calls

100% of fire calls and 91% to 99% of fire calls 51% to 89% of fire calls and 50% or below of fire calls
T - 100% of fire calls and 90% of fire calls and related
related emergencies and related emergencies related emergencies and related emergencies
related emergencies emergencies responded
responded within seven responded within seven (7) responded within seven (7) responded within seven (7)
responded within seven (7) Timeliness (T) within seven (7) minutes
(7) minutes (from receipt minutes (from receipt of minutes (from receipt of call minutes (from receipt of call
minutes (from receipt of call (from receipt of call until
of call until arrival on the call until arrival on the fire until arrival on the fire until arrival on the fire
until arrival on the fire scene) arrival on the fire scene)
fire scene) scene) scene) scene)
Quality (Q)
9% and below of
100% of households in 11 to 99% of households 10% of households in
households in
disaster/calamity-affected in disaster/calamity- disaster/calamity-affected
disaster/calamity-affected
E - 100% of non-fire response barangays rendered with affected barangays barangays rendered with
2. Non-Fire Response barangays rendered with
activities rendered with Efficiency (E) assistance against total rendered with assistance assistance against total n/a
Activities assistance against total
assistance. households in against total households in households in
households in
disaster/calamity-affected disaster/calamity-affected disaster/calamity-affected
disaster/calamity-affected
barangays. barangays. barangays.
barangays.
Timeliness (T)
Quality (Q)
Driver - Pump 100% ratio of formulated
Operator / E - 100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Community Fire
Lineman / Fire Protection Plan (CFPP) formulated Community Fire formulated Community Fire formulated Community Fire formulated Community Fire
3. Community Fire Protection Plan (CFPP)
Nozzleman formulated in 1st Quarter vis- Efficiency (E) Protection Plan (CFPP) Protection Plan (CFPP) vis-a- Protection Plan (CFPP) vis- Protection Plan (CFPP) vis-
Protection Plan (CFPP) to total number of target
à-vis target barangays within vis-a-vis target barangays vis target barangays in first à-vis target barangays in a-vis target barangays in
barangays in first (1st)
AOR. in first (1st) quarter. (1st) quarter. first (1st) quarter. first (1st) quarter.
quarter.
Timeliness (T)

100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Q - 100% ratio of Community Fire Auxiliary Group Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary
Fire Auxiliary Group Quality (Q) established and trained Group established and Group established and Group established and Group established and
4. Community Fire vis-à-vis target trained vis-à-vis target trained vis-à-vis target trained vis-à-vis target trained vis-à-vis target
established and trained in the
Auxiliary Group (CFAG) barangays. barangays. barangays. barangays. barangays.
1st quarter vis-à-vis target
barangays within AOR.
Efficiency (E)
Timeliness (T)

Page 26 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
100% of targeted
Q - 100% of the targeted 80-90% of targeted Failed to survey and inspect
barangays within the
barangays within the zone Quality (Q) n/a barangays within the zone n/a the number of targeted
zone were surveyed and
5. House-to-house Fire were surveyed and inspected. were surveyed and inspected barangays within the zone
inspected
Safety Survey
T - Survey and inspection were Survey and inspection Failed to conduct survey
conducted during 2nd and 4th Timeliness (T) were conducted during n/a n/a n/a and inspection during 2nd
Driver - Pump quarter. 2nd and 4th quarter. and 4th quarter.
Operator /
Lineman / Intensive lecture was Lecture was conducted to
Q - Intensive lecture was Lecture was conducted to 60- Lecture was conducted to Lecture was conducted to 0-
Nozzleman conducted to 100% of 80-90% of targeted
conducted to 100% of targeted Quality (Q) 70% of targeted participants 40-50% of targeted 30% of targeted participants
targeted participants participants within the
participants within the zone within the zone participants within the zone within the zone
within the zone zone
6. Intensive Lecture
Intensive lecture was
T - Intensive lecture was Failed to conduct intensive
conducted within the
conducted within the zone Timeliness (T) n/a n/a n/a lecture within the zone
zone during 2nd and 4th
during 2nd and 4th quarter. during 2nd and 4th quarter.
quarter.
Quality (Q)

100% of the monthly 80% to 99% of the monthly


60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly monitoring reports for monitoring reports for NO monthly monitoring
monitoring reports for OPLAN monitoring reports for
monitoring reports for OPLAN OPLAN LIGTAS NA OPLAN LIGTAS NA reports for OPLAN LIGTAS
LIGTAS NA PAMAYANAN OPLAN LIGTAS NA
1. OPLAN LIGTAS NA LIGTAS NA PAMAYANAN PAMAYANAN forwarded PAMAYANAN forwarded NA PAMAYANAN forwarded
Efficiency (E) forwarded to higher office on PAMAYANAN forwarded to
PAMAYANAN forwarded to higher office on to higher office on 1st to higher office on 1st to higher office on 1st
1st working day of the higher office on 1st working
1st working day of the following working day of the working day of the working day of the following
following month covering the day of the following month
month covering the report. following month covering following month covering month covering the report.
report. covering the report.
the report. the report.
Staff, Community
Relations Unit
Timeliness (T)
Quality (Q)
100% ratio of formulated
E - 100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Community Fire
Fire Protection Plan (CFPP) formulated Community Fire formulated Community Fire formulated Community Fire formulated Community Fire
2. Community Fire Protection Plan (CFPP)
formulated in 1st Quarter vis- Efficiency (E) Protection Plan (CFPP) Protection Plan (CFPP) vis-a- Protection Plan (CFPP) vis- Protection Plan (CFPP) vis-
Protection Plan (CFPP) to total number of target
à-vis target barangays within vis-a-vis target barangays vis target barangays in first à-vis target barangays in a-vis target barangays in
barangays in first (1st)
AOR. in first (1st) quarter. (1st) quarter. first (1st) quarter. first (1st) quarter.
quarter.
Timeliness (T)

100% ratio of Community 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Q - 100% ratio of Community Fire Auxiliary Group Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary Community Fire Auxiliary
Fire Auxiliary Group Quality (Q) established and trained Group established and Group established and Group established and Group established and
3. Community Fire vis-à-vis target trained vis-à-vis target trained vis-à-vis target trained vis-à-vis target trained vis-à-vis target
established and trained in the
Auxiliary Group (CFAG) barangays. barangays. barangays. barangays. barangays.
1st quarter vis-à-vis target
barangays within AOR.
Efficiency (E)
Timeliness (T)
100% of targeted
Q - 100% of the targeted 80-90% of targeted Failed to survey and inspect
barangays within the
barangays within the zone Quality (Q) n/a barangays within the zone n/a the number of targeted
zone were surveyed and
were surveyed and inspected. were surveyed and inspected barangays within the zone
Staff, Community 4. House-to-house Fire inspected
Relations Unit Safety Survey T - Survey and inspection were Survey and inspection Failed to conduct survey
conducted during 2nd and 4th Timeliness (T) were conducted during n/a n/a n/a and inspection during 2nd
quarter. 2nd and 4th quarter. and 4th quarter.
Timeliness (T)
Intensive lecture was Lecture was conducted to
Q - Intensive lecture was Lecture was conducted to 60- Lecture was conducted to Lecture was conducted to 0-
conducted to 100% of 80-90% of targeted
conducted to 100% of targeted Quality (Q) 70% of targeted participants 40-50% of targeted 30% of targeted participants
targeted participants participants within the
participants within the zone within the zone participants within the zone within the zone
within the zone zone
5. Intensive Lecture
Page 27 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
5. Intensive Lecture
Intensive lecture was
T - Intensive lecture was Failed to conduct intensive
conducted within the
conducted within the zone Timeliness (T) n/a n/a n/a lecture within the zone
zone during 2nd and 4th
during 2nd and 4th quarter. during 2nd and 4th quarter.
quarter.
Order of Payment Slip Order of Payment Slip (OPS) Order of Payment Slip
Q - Order of Payment Slip
Quality (Q) (OPS) issued with no n/a issued with minimal (1-2) n/a (OPS) issued with more
(OPS) issued with no error.
error. errors. than 2 (>2) errors.
100% of the Order of 80%-99% of the Order of
E - 100% of the Order of 60%-79% of the Order of 10%-59% of the Order of Below 10% of the Order of
Assessor 1. Order of Payment Slip Payment Slip (OPS) issued Payment Slip (OPS) Payment Slip (OPS)
Payment Slip (OPS) issued Payment Slip (OPS) issued Payment Slip (OPS) issued
issued within 10 minutes issued within 10 minutes
within 10 minutes from receipt Efficiency (E) within 10 minutes from within 10 minutes from within 10 minutes from
from receipt of complete from receipt of complete
of complete documentary receipt of complete receipt of complete receipt of complete
documentary documentary
requirements. documentary requirements. documentary requirements. documentary requirements.
requirements. requirements.
Timeliness (T)

After inspection report After inspection report After inspection report


Q - After inspection report
submitted with submitted with appropriate submitted with appropriate
submitted with appropriate
Quality (Q) appropriate findings and n/a findings and n/a findings and
findings and recommendations
recommendations with no recommendations with minor recommendations with more
with no revision.
revision. (1-2) revisions. than 2 (>2) revisions.

Fire Safety Inspector 1. After Inspection Report E - After inspection report 100% of after inspection 80%-99% of after 60%-79% of after inspection 10%-59% of after inspection Below 10% after inspection
report submitted with inspection report submitted report submitted with report submitted with report submitted with
submitted with appropriate
appropriate findings and with appropriate findings appropriate findings and appropriate findings and appropriate findings and
findings and recommendations
Efficiency (E) recommendations within and recommendations recommendations within the recommendations within the recommendations within the
within the prescribed time
the prescribed time frame within the prescribed time prescribed time frame (3 1/2 prescribed time frame (3 1/2 prescribed time frame (3 1/2
frame (3 1/2 days) from the
(3 1/2 days) from the frame (3 1/2 days) from days) from the date of days) from the date of days) from the date of
date of application.
date of application. the date of application. application. application. application.

Timeliness (T)
100% ratio of Inspection 95% to 99%ratio of 85% to 89% ratio of Below 85% ratio of
Q - 100% ratio of Inspection 90% to 94% ratio of
order receipt vis-à-vis Inspection order receipt Inspection order receipt vis- Inspection order receipt vis-
order receipt vis-à-vis Quality (Q) Inspection order receipt vis-à-
inspected vis-à-vis inspected à-vis inspected à-vis inspected
inspected establishments. vis inspected establishments.
establishments. establishments. establishments. establishments.

Fire Safety E - 100% ratio of Inspection 100% ratio of Inspection 95% to 99% ratio of 90% to 94%ratio of 85% to 89% ratio of Below 85% ratio of
2. Inspection Order
Inspector order receipt vis-à-vis order receipt vis-à-vis Inspection order receipt Inspection order receipt vis- Inspection order receipt vis- Inspection order receipt vis-
inspected establishments Efficiency (E) inspected establishments vis-à-vis inspected à-vis inspected à-vis inspected à-vis inspected
within the prescribed time within the prescribed time establishments within the establishments within the establishments within the establishments within the
frame. frame. prescribed time frame. prescribed time frame. prescribed time frame. prescribed time frame.

Timeliness (T)

100% ratio of building Below 100% ratio of building


Q - 100% ratio of building plans
plans receipt for plans receipt for evaluation
receipt for evaluation vis-à-vis Quality (Q)
evaluation vis-à-vis total vis-à-vis total evaluated
total evaluated building plans.
evaluated building plans. building plans.
1. Building Plan
Evaluation Efficiency (E)

T - 100% ratio of building plans


receipt for evaluation vis-à-vis Timeliness (T) within 1 day within 2-3 days within 4-5 days more than 5 days
total evaluated building plans.

Building Plan
Evaluator

Page 28 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Building Plan
Evaluator 100% ratio of Inspection 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
Q - 100% ratio of Inspection
Order receipt vis-à-vis Inspection Order receipt Inspection Order receipt vis- Inspection Order receipt vis- Inspection Order receipt vis-
Order receipt vis-à-vis After Quality (Q)
After Inspection Report vis-à-vis After Inspection à-vis After Inspection Report à-vis After Inspection Report à-vis After Inspection Report
Inspection Report prepared.
prepared. Report prepared. prepared. prepared. prepared.

2. After Inspection Report 100% ratio of Inspection 95% to 99% ratio of 90% to 94% ratio of 85% to 89% ratio of Below 85% ratio of
E - 100% ratio of Inspection
Order receipt vis-à-vis Inspection Order receipt Inspection Order receipt vis- Inspection Order receipt vis- Inspection Order receipt vis-
Order receipt vis-à-vis After
Efficiency (E) After Inspection Report vis-à-vis After Inspection à-vis After Inspection Report à-vis After Inspection Report à-vis After Inspection Report
Inspection Report submitted
submitted within Report submitted within submitted within prescribed submitted within prescribed submitted within prescribed
within prescribed time.
prescribed time. prescribed time. time. time. time.

Timeliness (T)
Q - Offical Receipt (OR) issued Offical Receipt (OR) Offical Receipt (OR) issued Offical Receipt (OR) issued
Quality (Q) n/a n/a
with no error. issued with no error. with one error. with two or more error.

100% of Order of 90-99% of Order of


80-89% of Order of Payment 70-79% of Order of Below 69% of Order of
1. Official Receipt Payment Slip (OPS) Payment Slip (OPS)
E - 100% of Offical Receipt Slip (OPS) issued within 10 Payment Slip (OPS) issued Payment Slip (OPS) issued
issued within 10 minutes issued within 10 minutes
(OR) issued within 10 minutes Efficiency (E) minutes from receipt of within 10 minutes from within 10 minutes from
from receipt of complete from receipt of complete
upon receipt of payment. complete documentary receipt of complete receipt of complete
documentary documentary
requirements. documentary requirements. documentary requirements.
requirements. requirements.
Timeliness (T)
Quality (Q)
100% ratio of Fire Code Below 85% ratio of Fire
E - 100% ratio of Fire Code
Fees collection vis-à-vis Code Fees collection vis-à-
Fees collection vis-à-vis actual
2. Fire Code Fees Efficiency (E) actual remittance to the vis actual remittance to the
remittance to the Bureau of
Bureau of Treasury within Bureau of Treasury within
Treasury within the month.
the month. the month.
Timeliness (T)
Collecting Agent
100% of the monthly 100% of the monthly report
Q - 100% of the monthly report
report of accountability of accountability for
of accountability for
for accountable forms accountable forms
accountable forms forwarded to
Quality (Q) forwarded to higher office forwarded to higher office
higher office on the deadline of
before the deadline of the after the deadline of the
the following month covering
following month covering following month covering the
the report.
the report. report.
3. Monthly Report of
Accountability for Efficiency (E)
Accountable Forms
100% of the monthly 100% of the monthly report
T - 100% of the monthly report 100% of the monthly report of
report of accountability of accountability for
of accountability for accountability for accountable
for accountable forms accountable forms
accountable forms forwarded to forms forwarded to higher
Timeliness (T) forwarded to higher office forwarded to higher office
higher office on the deadline of office on the deadline of the
before the deadline of the after the deadline of the
the following month covering following month covering the
following month covering following month covering the
the report. report.
the report. report.

Page 29 of 30
SUCCESS INDICATOR Description
DESIGNATION OUTPUTS Variables
(TARGETS + MEASURES) 5 4 3 2 1
Quality (Q)

100% of the monthly 80% to 99% of the monthly 60% to 79% of the monthly 10% to 59% of the monthly
E - 100% of the monthly report NO monthly report on
report on summary of report on summary of report on summary of report on summary of
on summary of collections and summary of collections and
4. Monthly Report on collections and deposits collections and deposits collections and deposits collections and deposits
deposits forwarded to higher deposits forwarded to higher
Collecting Agent Summary of Collections Efficiency (E) forwarded to higher office forwarded to higher office forwarded to higher office on forwarded to higher office
office on 5th working day of the office on 5th working day of
and Deposits on 5th working day of the on 5th working day of the 5th working day of the on 5th working day of the
following month covering the the following month covering
following month covering following month covering following month covering the following month covering the
report. the report.
the report. the report. report. report.

Timeliness (T)

Prepared by: Noted by:

Head, RPMT Secretariat Chairperson, RPMT

Page 30 of 30

You might also like