KM Performance Summary Oman
KM Performance Summary Oman
Summary
Results:
• Drilled section in 1 run from shoe to TD, setting a new ROP field
record with 23.1m/hr
• Outperformed previous best field ROP, established in one of
closest offsets well-40, by ~42%
• Successful 12 ¼’’ TK66-D10, with Chainsaw configuration, 1st trial
12 ¼” TK66-D10-Z (s/n: E241440)
in the field (2nd field record of this design with PDO), proving
efficiency and durability in challenging vertical applications
• Exceeded ROP and drilled interval KPIs, fully satisfying the
customer
• While POOH, drill string got stuck due to formation collapse in
Shargi; multiple attempts were made to re-work this spot without
success. Decision was taken to side-track a new hole; making a dull
grading not possible for this trial run. LIH.
wt_reedhycalog@nov.com nov.com
© 2015 National Oilwell Varco. All Rights Reserved.