You are on page 1of 47

Catálogo

1 apu.pdf ·························································································································································· 1
2 apu.pdf ·························································································································································· 5
3 apu.pdf ························································································································································ 15
4 apu.pdf ························································································································································ 17
5 apu.pdf ························································································································································ 19
6 apu.pdf ························································································································································ 22
7 apu.pdf ························································································································································ 23
8 apu.pdf ························································································································································ 24
9 apu.pdf ························································································································································ 44
10 apu.pdf ······················································································································································ 45
11 apu.pdf ······················································································································································ 46
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 001 OBRAS INICIALES Fecha presupuesto 30/09/2023
Partida 01.01.01.01 CARTEL DE OBRA 3.60X2.40 SEGUN MODELO INC. INSTALACION DE OBRA

Rendimiento glb/DIA MO. 0.5000 EQ. 0.5000 Costo unitario directo por : glb 400.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0409130007 SC CARTEL DE OBRA, INCLUYE PARANTES Y MARCO E glb 1.0000 400.00 400.00
INSTALACION
400.00

Partida 01.01.01.02 ALMACEN PROVISIONAL DE OBRA

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 969.13

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.3750 3.0000 16.40 49.20
0101010005 PEON hh 1.0000 8.0000 11.89 95.12
144.32
Materiales
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.5000 5.10 2.55
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.5000 5.10 2.55
0231010001 MADERA TORNILLO p2 55.0000 5.50 302.50
02310500010006 TRIPLAY DE 1.20X2.40 m X 4 mm und 0.0350 25.00 0.88
308.48
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 144.32 4.33
03010800030002 SIERRA CIRCULAR hm 8.0000 64.0000 8.00 512.00
516.33

Partida 01.01.01.03 CERCO DE PROTECCION CON ARPILLERIA INCL. INSTALACION

Rendimiento m/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : m 22.45

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 2.0000 0.0800 11.89 0.95
0.95
Materiales
0210030002 MALLA RASCHEL rll 0.1000 65.00 6.50
0263010001 POSTES DE MADERA und 1.0000 15.00 15.00
21.50

Partida 01.01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS

Rendimiento glb/DIA MO. EQ. Costo unitario directo por : glb 15,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
04240100010001 SC MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.0000 15,000.00 15,000.00
15,000.00

Partida 01.02.01 AGUA PARA LA CONSTRUCCION

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 150.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0423210002 SC AGUA PARA LA OBRA glb 1.0000 150.00 150.00
150.00

Partida 01.02.02 ENERGIA ELECTRICA PROVISIONAL

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 600.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 001 OBRAS INICIALES Fecha presupuesto 30/09/2023

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0423210003 SC ELECTRICIDAD PARA LA OBRA glb 1.0000 600.00 600.00
600.00

Partida 01.03.01 LIMPIEZA DEL TERRENO MANUAL

Rendimiento m2/DIA MO. 40.0000 EQ. 40.0000 Costo unitario directo por : m2 2.85

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.1000 0.0200 16.40 0.33
0101010005 PEON hh 1.0000 0.2000 11.89 2.38
2.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 2.71 0.14
0.14

Partida 01.03.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR

Rendimiento m2/DIA MO. 2,000.0000 EQ. 2,000.0000 Costo unitario directo por : m2 0.95

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 3.0000 0.0120 11.89 0.14
01010300000005 OPERARIO TOPOGRAFO hh 3.0000 0.0120 16.40 0.20
0.34
Materiales
02130600010001 OCRE ROJO kg 0.0200 6.00 0.12
0240020001 PINTURA ESMALTE gal 0.0060 25.00 0.15
0.27
Equipos
0301000002 NIVEL TOPOGRAFICO día 4.0000 0.0020 50.00 0.10
0301000009 ESTACION TOTAL día 4.0000 0.0020 120.00 0.24
0.34

Partida 01.03.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO

Rendimiento m2/DIA MO. 2,000.0000 EQ. 2,000.0000 Costo unitario directo por : m2 0.95

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 3.0000 0.0120 11.89 0.14
01010300000005 OPERARIO TOPOGRAFO hh 3.0000 0.0120 16.40 0.20
0.34
Materiales
02130600010001 OCRE ROJO kg 0.0200 6.00 0.12
0240020001 PINTURA ESMALTE gal 0.0060 25.00 0.15
0.27
Equipos
0301000002 NIVEL TOPOGRAFICO día 4.0000 0.0020 50.00 0.10
0301000009 ESTACION TOTAL día 4.0000 0.0020 120.00 0.24
0.34

Partida 01.04.01 CORTE DE MATERIAL SUELTO CON EQUIPO.

Rendimiento m3/DIA MO. 800.0000 EQ. 800.0000 Costo unitario directo por : m3 2.28

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 0.2000 0.0020 13.18 0.03
0101010005 PEON hh 2.0000 0.0200 11.89 0.24
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 001 OBRAS INICIALES Fecha presupuesto 30/09/2023
0.27
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 0.27 0.01
03011800020003 TRACTOR DE ORUGAS CAT D6D hm 1.0000 0.0100 200.00 2.00
2.01

Partida 01.04.02 EXCAVACION PARA ZAPATAS

Rendimiento m3/DIA MO. 3.0000 EQ. 3.0000 Costo unitario directo por : m3 32.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.6667 11.89 31.71
31.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 31.71 0.95
0.95

Partida 01.04.03 EXCAVACION MANUAL DE MURO CICLOPEO

Rendimiento m3/DIA MO. 3.0000 EQ. 3.0000 Costo unitario directo por : m3 32.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.6667 11.89 31.71
31.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 31.71 0.95
0.95

Partida 01.04.04 EXCAVACION MANUAL DE SARDINEL

Rendimiento m3/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : m3 24.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.0000 11.89 23.78
23.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 23.78 0.71
0.71

Partida 01.04.05 EXCAVACION MANUAL DE VEREDAS

Rendimiento m3/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : m3 24.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.0000 11.89 23.78
23.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 23.78 0.71
0.71

Partida 01.04.06 EXCAVACION MANUAL DE CIMIENTOS CORRIDOS

Rendimiento m3/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : m3 24.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.0000 11.89 23.78
23.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 23.78 0.71
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 001 OBRAS INICIALES Fecha presupuesto 30/09/2023
0.71

Partida 01.04.07 EXCAVACION MANUAL DE DADOS DE CONCRETO

Rendimiento m3/DIA MO. 3.0000 EQ. 3.0000 Costo unitario directo por : m3 32.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.6667 11.89 31.71
31.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 31.71 0.95
0.95

Partida 01.04.08 RELLENO CON MATERIAL PROPIO

Rendimiento m3/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m3 6.68

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 0.2500 0.1667 13.18 2.20
0101010005 PEON hh 0.2500 0.1667 11.89 1.98
4.18
Equipos
0301100003 COMPACTADORA DE PLANCHA día 0.5000 0.0417 60.00 2.50
2.50

Partida 01.04.09 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE DE 10M3

Rendimiento m3/DIA MO. 120.0000 EQ. 120.0000 Costo unitario directo por : m3 4.64

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 2.0000 0.1333 11.89 1.58
1.58
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.58 0.05
03012200040002 CAMION VOLQUETE DE 10 m3 hm 0.2500 0.0167 180.00 3.01
3.06
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
Partida 02.01.01 MURO CICLOPEO C:H - 1:10+30% P.G

Rendimiento m3/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m3 273.52

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.1999 0.7999 16.40 13.12
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
0101010005 PEON hh 6.0000 4.0000 11.89 47.56
69.47
Materiales
0201040001 PETROLEO D-2 gal 0.2286 16.00 3.66
0207010006 PIEDRA GRANDE DE 8" m3 0.4765 70.80 33.74
0207030001 HORMIGON m3 0.8563 82.60 70.73
0207070001 AGUA PUESTA EN OBRA m3 0.0860 12.00 1.03
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 3.5000 25.40 88.90
198.06
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 0.0749 0.0499 120.00 5.99
5.99

Partida 02.01.02 VEREDAS E=4" MEZCLA 1:12 CEMENTO-HORMIGON, BRUÑADO

Rendimiento m2/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : m2 35.51

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 8.0000 0.3200 16.40 5.25
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
0101010005 PEON hh 6.0000 0.2400 11.89 2.85
8.63
Materiales
0201040001 PETROLEO D-2 gal 0.0200 16.00 0.32
0207030001 HORMIGON m3 0.0800 82.60 6.61
0207070001 AGUA PUESTA EN OBRA m3 0.0860 12.00 1.03
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.7000 25.40 17.78
25.74
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0050 35.00 0.18
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.8000 0.0320 30.00 0.96
1.14

Partida 02.01.03 PISO SEMI PULIDO INTERIOR E=4" MEZCLA 1:12 C-H

Rendimiento m2/DIA MO. 180.0000 EQ. 180.0000 Costo unitario directo por : m2 37.80

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 8.0000 0.3556 16.40 5.83
0101010004 OFICIAL hh 1.0000 0.0444 13.18 0.59
0101010005 PEON hh 6.0000 0.2667 11.89 3.17
9.59
Materiales
0201040001 PETROLEO D-2 gal 0.0200 16.00 0.32
0207030001 HORMIGON m3 0.0800 82.60 6.61
0207070001 AGUA PUESTA EN OBRA m3 0.0860 12.00 1.03
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.7000 25.40 17.78
02130600010001 OCRE ROJO kg 0.2000 6.00 1.20
26.94
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0056 35.00 0.20
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.8000 0.0356 30.00 1.07
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
1.27

Partida 02.01.04 CONCRETO EN SARDINELES F'C=175 KG/CM2

Rendimiento m3/DIA MO. 20.0000 EQ. 20.0000 Costo unitario directo por : m3 365.93

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 2.0000 0.8000 16.40 13.12
0101010004 OFICIAL hh 1.0000 0.4000 13.18 5.27
0101010005 PEON hh 9.0000 3.6000 11.89 42.80
61.19
Materiales
0201030001 GASOLINA gal 0.2000 19.00 3.80
0207030001 HORMIGON m3 1.1300 82.60 93.34
0207070001 AGUA PUESTA EN OBRA m3 0.1700 12.00 2.04
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 7.5000 25.40 190.50
289.68
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 61.19 3.06
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.4000 30.00 12.00
15.06

Partida 02.01.05 CONCRETO CIMIENTOS CORRIDOS 1:10+30%P.G.

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 259.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 2.0000 0.5333 16.40 8.75
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 11.0000 2.9333 11.89 34.88
47.15
Materiales
0201040001 PETROLEO D-2 gal 0.2286 16.00 3.66
0207010006 PIEDRA GRANDE DE 8" m3 0.4800 70.80 33.98
0207030001 HORMIGON m3 0.8300 82.60 68.56
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 2.9000 25.40 73.66
179.86
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.2667 120.00 32.00
32.00

Partida 02.01.06 CONCRETO SOBRECIMIENTOS 1:8 + 25% P.M.

Rendimiento m3/DIA MO. 20.0000 EQ. 20.0000 Costo unitario directo por : m3 287.84

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4000 16.40 6.56
0101010004 OFICIAL hh 1.5000 0.6000 13.18 7.91
0101010005 PEON hh 9.5000 3.8000 11.89 45.18
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.4000 16.40 6.56
66.21
Materiales
0201040001 PETROLEO D-2 gal 0.2285 16.00 3.66
0207010005 PIEDRA MEDIANA m3 0.4000 80.00 32.00
0207030001 HORMIGON m3 0.8500 82.60 70.21
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 4.0000 25.40 101.60
209.63
Equipos
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.4000 30.00 12.00
12.00

Partida 02.01.07 CONCRETO EN CANAL PLUVIAL F'C=175 KG/CM2

Rendimiento m3/DIA MO. 22.0000 EQ. 22.0000 Costo unitario directo por : m3 359.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 2.0000 0.7273 16.40 11.93
0101010004 OFICIAL hh 1.0000 0.3636 13.18 4.79
0101010005 PEON hh 9.0000 3.2727 11.89 38.91
55.63
Materiales
0201030001 GASOLINA gal 0.2000 19.00 3.80
0207030001 HORMIGON m3 1.1300 82.60 93.34
0207070001 AGUA PUESTA EN OBRA m3 0.1700 12.00 2.04
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 7.5000 25.40 190.50
289.68
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 55.63 2.78
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.3636 30.00 10.91
13.69

Partida 02.02.01.01 CONCRETO ZAPATAS f'c=210 kg/cm2

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 429.61

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2667 16.40 4.37
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 6.0000 1.6000 11.89 19.02
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 2.0000 0.5333 16.40 8.75
35.66
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 90.00 76.50
02070200010002 ARENA GRUESA m3 0.4200 75.00 31.50
0207030001 HORMIGON m3 0.2500 82.60 20.65
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 25.40 247.40
378.21
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 35.66 1.07
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 1.0000 0.2667 25.00 6.67
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.2667 30.00 8.00
15.74

Partida 02.02.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 02.02.02.01 CONCRETO DADOS f'c=210 kg/cm2

Rendimiento m3/DIA MO. 35.0000 EQ. 35.0000 Costo unitario directo por : m3 422.28

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2286 16.40 3.75
0101010004 OFICIAL hh 1.0000 0.2286 13.18 3.01
0101010005 PEON hh 6.0000 1.3714 11.89 16.31
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 2.0000 0.4571 16.40 7.50
30.57
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 90.00 76.50
02070200010002 ARENA GRUESA m3 0.4200 75.00 31.50
0207030001 HORMIGON m3 0.2500 82.60 20.65
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 25.40 247.40
378.21
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 30.57 0.92
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 1.0000 0.2286 25.00 5.72
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.2286 30.00 6.86
13.50

Partida 02.02.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 02.02.03.01 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2

Rendimiento m3/DIA MO. 20.0000 EQ. 20.0000 Costo unitario directo por : m3 423.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4000 16.40 6.56
0101010004 OFICIAL hh 1.0000 0.4000 13.18 5.27
0101010005 PEON hh 6.0000 2.4000 11.89 28.54
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.4000 16.40 6.56
46.93
Materiales
0201030001 GASOLINA gal 0.0300 19.00 0.57
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.2500 82.60 20.65
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.0000 25.40 228.60
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
362.98
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0500 35.00 1.75
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.4000 30.00 12.00
13.75

Partida 02.02.03.02 ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 72.59

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0001 0.6667 16.40 10.93
0101010005 PEON hh 1.0001 0.6667 11.89 7.93
18.86
Materiales
0201040001 PETROLEO D-2 gal 0.0500 16.00 0.80
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 1.5000 5.10 7.65
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1200 5.10 0.61
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.1000 5.10 0.51
0231010001 MADERA TORNILLO p2 0.5964 5.50 3.28
0231220002 PANEL 1.20X1.80XM PARA MURO m2 0.0800 403.84 32.31
45.16
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 18.86 0.57
03010300040004 PUNTALES S-2 día 15.9996 1.3333 6.00 8.00
8.57

Partida 02.02.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 02.02.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 441.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2667 16.40 4.37
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 8.0000 2.1333 11.89 25.36
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.2667 16.40 4.37
37.62
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.5000 82.60 41.30
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 25.40 246.38
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
401.30
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0333 35.00 1.17
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.1000 0.0267 30.00 0.80
0301340001 ANDAMIO METALICO día 1.0000 0.0333 18.00 0.60
2.57

Partida 02.02.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNAS

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 72.59

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010005 PEON hh 1.0000 0.6667 11.89 7.93
18.86
Materiales
0201040001 PETROLEO D-2 gal 0.0500 16.00 0.80
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 1.5000 5.10 7.65
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1200 5.10 0.61
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.1000 5.10 0.51
0231010001 MADERA TORNILLO p2 0.5964 5.50 3.28
0231220002 PANEL 1.20X1.80XM PARA MURO m2 0.0800 403.84 32.31
45.16
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 18.86 0.57
03010300040004 PUNTALES S-2 día 16.0000 1.3333 6.00 8.00
8.57

Partida 02.02.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 02.02.05.01 CONCRETO EN VIGAS DE AMARRE f'c=210 kg/cm2

Rendimiento m3/DIA MO. 25.0000 EQ. 25.0000 Costo unitario directo por : m3 449.54

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.3200 16.40 5.25
0101010004 OFICIAL hh 1.0000 0.3200 13.18 4.22
0101010005 PEON hh 8.0000 2.5600 11.89 30.44
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.3200 16.40 5.25
45.16
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.5000 82.60 41.30
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 25.40 246.38
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
401.30
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0400 35.00 1.40
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.1000 0.0320 30.00 0.96
0301340001 ANDAMIO METALICO día 1.0000 0.0400 18.00 0.72
3.08

Partida 02.02.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 21.12

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
19.72
Materiales
0231010001 MADERA TORNILLO p2 0.0750 5.50 0.41
0.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 19.72 0.99
0.99

Partida 02.02.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 02.03.01.01 SOLAQUEO DE COLUMNAS

Rendimiento m2/DIA MO. 69.0000 EQ. 69.0000 Costo unitario directo por : m2 17.91

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 4.0000 0.4638 16.40 7.61
0101010005 PEON hh 4.0000 0.4638 11.89 5.51
13.12
Materiales
0207020001 ARENA m3 0.0120 100.00 1.20
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0200 25.40 0.51
0213020002 CAL HIDRATADA kg 0.0065 15.00 0.10
0231010001 MADERA TORNILLO p2 0.0500 5.50 0.28
2.09
Equipos
0301340001 ANDAMIO METALICO día 10.3500 0.1500 18.00 2.70
2.70
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
Partida 02.03.01.02 SOLAQUEO DE VIGAS COLLARIN

Rendimiento m2/DIA MO. 60.0000 EQ. 60.0000 Costo unitario directo por : m2 20.29

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 4.0000 0.5333 16.40 8.75
0101010005 PEON hh 4.0000 0.5333 11.89 6.34
15.09
Materiales
0207020001 ARENA m3 0.0120 100.00 1.20
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0200 25.40 0.51
0213020002 CAL HIDRATADA kg 0.0065 15.00 0.10
0231010001 MADERA TORNILLO p2 0.0500 5.50 0.28
2.09
Equipos
0301340001 ANDAMIO METALICO día 10.3500 0.1725 18.00 3.11
3.11

Partida 02.03.01.03 TARRAJEO EN GRADERIA MORTERO 1:5

Rendimiento m2/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : m2 30.14

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 16.40 13.12
0101010005 PEON hh 0.7500 0.6000 11.89 7.13
20.25
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0054 12.00 0.06
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1780 25.40 4.52
0231010001 MADERA TORNILLO p2 0.4340 5.50 2.39
9.77
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0.12

Partida 02.03.02.01 PUERTA METALICA INC. EPOXICO Y PINTURA SEGUN DISEÑO

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 380.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
04110100010001 SC PUERTA METALICA P-1 und 1.0000 380.00 380.00
380.00

Partida 02.03.02.02 MALLA GALVANIZADA C/N MARCO(COLUMNA A COLUMNA) INC. EPOXICO Y PINTURA SEGUN DISEÑO

Rendimiento und/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : und 1,705.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 2.0000 1.6000 16.40 26.24
0101010005 PEON hh 2.0000 1.6000 11.89 19.02
45.26
Materiales
02040200060003 ANGULO DE 2"X2"X1/8" X 6 m und 8.0000 80.00 640.00
02040200060008 TUBO CUADRADO 4" X 4" X 1/8" X 6 m m 6.5000 38.00 247.00
0204150003 MALLA GALVANIZA DE 2"X2" #10 m2 27.0000 19.00 513.00
0255080015 SOLDADURA CELLOCORD 1/8" kg 12.0000 18.20 218.40
1,618.40
Equipos
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 45.26 1.36
03010300030002 SOLDADURA ELECTRICA MONOFASICA ALTERNA 295A hm 1.0000 0.8000 50.00 40.00
41.36

Partida 02.03.02.03 BARANDA GALVANIZADA C/N MARCO INC. EPOXICO Y PINTURA SEGUN DISEÑO

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 680.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
04120200010002 SC VARANDAS GALVANIZADA C/N MARCO INCL. EPOXICO Y und 1.0000 680.00 680.00
PINTURA
680.00

Partida 02.03.02.04 REJILLA DE CANAL FLUVIAL INC. EPOXICO Y PINTURA SEGUN DISEÑO

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 1,500.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
04110300020005 SC REJILLA METALICA SEGUN DISEÑO INCL.PINTURA und 1.0000 1,500.00 1,500.00
1,500.00

Partida 02.04.01 PINTURA EN COLUMNAS C/ESMALTE

Rendimiento m2/DIA MO. 45.0000 EQ. 45.0000 Costo unitario directo por : m2 16.07

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 0.1778 11.89 2.11
2.11
Materiales
0240020017 PINTURA ESMALTE AL AGUA ( NO REQUIERE THINNER) gal 0.1000 100.00 10.00
10.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.11 0.06
03011900010003 RODILLO DE PINTOR pza 0.1000 12.00 1.20
0301340001 ANDAMIO METALICO día 5.0000 0.1111 18.00 2.00
0301480002 BROCHA PARA PINTOR und 0.1000 7.00 0.70
3.96

Partida 02.04.02 PINTURA EN VIGAS DE COLLARIN C/ESMALTE

Rendimiento m2/DIA MO. 45.0000 EQ. 45.0000 Costo unitario directo por : m2 16.07

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 0.1778 11.89 2.11
2.11
Materiales
0240020017 PINTURA ESMALTE AL AGUA ( NO REQUIERE THINNER) gal 0.1000 100.00 10.00
10.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.11 0.06
03011900010003 RODILLO DE PINTOR pza 0.1000 12.00 1.20
0301340001 ANDAMIO METALICO día 5.0000 0.1111 18.00 2.00
0301480002 BROCHA PARA PINTOR und 0.1000 7.00 0.70
3.96

Partida 02.04.03 PINTURA EN SOBRECIMIENTO C/ESMALTE

Rendimiento m2/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m2 14.33
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 002 ESTRUCTURAS Fecha presupuesto 30/09/2023
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010004 OFICIAL hh 0.5000 0.0800 13.18 1.05
2.36
Materiales
0240020017 PINTURA ESMALTE AL AGUA ( NO REQUIERE THINNER) gal 0.1000 100.00 10.00
10.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.36 0.07
03011900010003 RODILLO DE PINTOR pza 0.1000 12.00 1.20
0301480002 BROCHA PARA PINTOR und 0.1000 7.00 0.70
1.97

Partida 02.04.04 PINTURA DE GRASS

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 1,500.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0406020014 SC PINTADO DE LINEAS DEPORTIVAS DE GRASS INCL. glb 1.0000 1,500.00 1,500.00
MATERIALES
1,500.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 003 COBERTURA METALICA Fecha presupuesto 30/09/2023
Partida 03.01 COBERTURA TIPO CALAMINON TR-4 DE 4MM

Rendimiento m2/DIA MO. 40.0000 EQ. 40.0000 Costo unitario directo por : m2 61.92

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2000 16.40 3.28
0101010004 OFICIAL hh 1.0000 0.2000 13.18 2.64
0101010005 PEON hh 0.5000 0.1000 11.89 1.19
7.11
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 7.11 0.36
0301330008 CALAMINON TR4 DE 4MM m2 1.0500 43.00 45.15
0301330009 ACCESORIOS PARA CUBIERA METALICA TR4 und 1.0000 3.90 3.90
0301330010 ACCESORIOS DE FIJACION Y SELLADO DE CUBIERTA und 1.0000 4.50 4.50
METALICA TR4
0301340001 ANDAMIO METALICO día 2.0000 0.0500 18.00 0.90
54.81

Partida 03.02 VIGA METALICA DE 0.30X0.40M

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 8,512.03

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0083 0.0667 16.40 1.09
0101010004 OFICIAL hh 0.0083 0.0667 13.18 0.88
0101010005 PEON hh 0.0416 0.3330 11.89 3.96
5.93
Materiales
02040200060006 TUBO CUADRADO 4" X2" X 1/8" X 6 m m 116.2000 32.00 3,718.40
02040200060007 TUBO CUADRADO 2" X2" X 1/8" X 6 m m 170.0000 21.00 3,570.00
0210010002 FIERRO LISO DE D=5/8" m 6.7800 18.90 128.14
02340600010005 ATIEZADOR 6MM und 12.0000 8.00 96.00
0255080015 SOLDADURA CELLOCORD 1/8" kg 0.8000 18.20 14.56
0271050140 PERNO ROSCADO DE 5/8" und 16.0000 14.00 224.00
0272070039 PLANCHA SUPERIOR DE 400MMX 500MM X 1/2" und 4.0000 80.00 320.00
0272070040 PLATINA ESQUINERA 20cmx40cmx1/2" und 4.0000 60.00 240.00
0272070041 PLATINA INCLINADA 150mm x 600mm x1/2" und 2.0000 95.00 190.00
8,501.10
Equipos
03010300030002 SOLDADURA ELECTRICA MONOFASICA ALTERNA 295A hm 0.0125 0.1000 50.00 5.00
5.00

Partida 03.03 PERFIL Z 8" X 3" X 2.5MM

Rendimiento m/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : m 72.23

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0083 0.0664 16.40 1.09
0101010004 OFICIAL hh 0.0083 0.0664 13.18 0.88
0101010005 PEON hh 0.0042 0.0336 11.89 0.40
2.37
Materiales
02340600010005 ATIEZADOR 6MM und 2.0000 8.00 16.00
02340600010006 PERFIL Z 8" X 3" X 2.5MM m 1.0000 27.00 27.00
0240020003 PINTURA ESMALTE SINTETICO TEKNO gal 0.1490 42.50 6.33
0240050007 PINTURA EPOXICA JET MASTIC 800 - CPPQ gal 0.1250 46.20 5.78
0255080015 SOLDADURA CELLOCORD 1/8" kg 0.2000 18.20 3.64
0271050141 PERNO DE ANCLAJE DE 5/8" DE COBERTURA und 4.0000 2.00 8.00
66.75
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 003 COBERTURA METALICA Fecha presupuesto 30/09/2023
Equipos
03010300030002 SOLDADURA ELECTRICA MONOFASICA ALTERNA 295A hm 0.0063 0.0504 50.00 2.52
0301340001 ANDAMIO METALICO día 0.0330 0.0330 18.00 0.59
3.11

Partida 03.04 ARRIOSTRE DIAGONAL DE ø5/8"

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 32.90

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.9998 0.1600 16.40 2.62
0101010004 OFICIAL hh 0.9998 0.1600 13.18 2.11
0101010005 PEON hh 0.9998 0.1600 11.89 1.90
6.63
Materiales
02040600010017 ACERO LISO EN VARILLAS DE 1/2" X 6 m m 1.0000 8.00 8.00
02380100020003 LIJA DE FIERRO #80 plg 0.1000 2.00 0.20
0255080015 SOLDADURA CELLOCORD 1/8" kg 0.1000 18.20 1.82
02631000010002 TEMPLADOR DE 1/2" und 0.1000 3.20 0.32
10.34
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 6.63 0.33
03010300030002 SOLDADURA ELECTRICA MONOFASICA ALTERNA 295A hm 0.7500 0.1200 50.00 6.00
0301110002 CORTADORA DE ACERO día 6.0000 0.1200 80.00 9.60
15.93

Partida 03.05 ARRIOSTRE LONGITUDINAL DE ø1"

Rendimiento m/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m 10.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0166 0.0044 16.40 0.07
0101010004 OFICIAL hh 0.0166 0.0044 13.18 0.06
0101010005 PEON hh 0.0166 0.0044 11.89 0.05
0.18
Materiales
02040600010017 ACERO LISO EN VARILLAS DE 1/2" X 6 m m 1.0000 8.00 8.00
02380100020003 LIJA DE FIERRO #80 plg 0.1000 2.00 0.20
0255080015 SOLDADURA CELLOCORD 1/8" kg 0.1000 18.20 1.82
02631000010002 TEMPLADOR DE 1/2" und 0.1000 3.20 0.32
10.34
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 0.18 0.01
03010300030002 SOLDADURA ELECTRICA MONOFASICA ALTERNA 295A hm 0.0125 0.0033 50.00 0.17
0301110002 CORTADORA DE ACERO día 0.1000 0.0033 80.00 0.26
0.44

Partida 03.06 IZAMIENTO ESTRUCTURAL

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 7,500.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0411100019 SC IZAJE DE ESTRUCTURA CON CAMION PLUMA glb 1.0000 7,500.00 7,500.00
7,500.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 004 INSTALACIONES SANITARIAS Y PLUVIALES Fecha presupuesto 30/09/2023
Partida 04.01.01.01 TUBERIA PARA AGUAS FLUVIALES PVC-SAP DE 4"

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 4.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010005 PEON hh 0.5000 0.0800 11.89 0.95
2.26
Materiales
02050700020024 TUBERIA PVC SAP PRESION C-10 EC 4" X 5 M m 0.2000 9.40 1.88
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
2.63
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.26 0.07
0.07

Partida 04.01.01.02 CODO PVC SAP 4"X90°

Rendimiento und/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : und 9.08

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.2000 0.1600 16.40 2.62
2.62
Materiales
02051000020007 CODO PVC SAP PARA AGUA CON ROSCA DE 4"X90" und 1.0000 6.00 6.00
0222080012 PEGAMENTO PARA PVC gal 0.0050 75.00 0.38
6.38
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.62 0.08
0.08

Partida 04.01.01.03 ABRAZADERA DE FIJACION P/TUBERIA PLUVIAL

Rendimiento und/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : und 14.35

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.1000 0.0800 16.40 1.31
1.31
Materiales
0204240010 ABRAZADERA DE FIERRO GALVANIZADO 4" und 1.0000 9.00 9.00
02460700010003 PERNOS DE ANCLAJE DE FIERRO GALVANIZADO CON und 2.0000 2.00 4.00
CAPUCHON PLASTICO
13.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.31 0.04
0.04

Partida 04.01.02.01 TUBERIA DE SALIDA DE CAJAS PARA AGUAS PLUVIALES PVC-SAP DE 6"

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 107.77

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 6.2500 1.0000 16.40 16.40
0101010005 PEON hh 3.1250 0.5000 11.89 5.95
22.35
Materiales
02191300010016 TUBERIA C.S.N. UF DN. 250 m (6") m 1.0000 84.00 84.00
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
84.75
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 004 INSTALACIONES SANITARIAS Y PLUVIALES Fecha presupuesto 30/09/2023
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 22.35 0.67
0.67
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 005 INSTALACIONES ELECTRICAS Fecha presupuesto 30/09/2023
Partida 05.01.01 TUBO PVC-SAP (ELECTRICAS) ø35MM

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 8.58

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010005 PEON hh 0.5000 0.0800 11.89 0.95
2.26
Materiales
02050700010005 TUBERIA PVC-SAP C-10 C/R DE 1" X 5 m und 1.0000 5.50 5.50
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
6.25
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.26 0.07
0.07

Partida 05.01.02 TUBO PVC-SAP (ELECTRICAS) ø20MM

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 10.10

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010005 PEON hh 0.5000 0.0800 11.89 0.95
2.26
Materiales
02050200010002 CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 0.4690 1.00 0.47
02050300010002 UNIONES PVC-SAP 3/4" ELECTRICAS (20 mm) und 0.3367 1.00 0.34
02050700020025 TUBERIA PVC SAP ELECTRICA DE 3/4"X3M (20MM) m 1.3800 4.50 6.21
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
7.77
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.26 0.07
0.07

Partida 05.02.01 CAJA OCTOGONAL DE 100x100X55MM

Rendimiento und/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : und 2.50

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02680400010001 CAJA DE PASE OCTOGONAL SAP 100 X 40 mm und 1.0000 2.50 2.50
2.50

Partida 05.03.01 TABLERO DE DISTRIBUCION 20/220v/50Hz/18 POLOS

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 324.91

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0100 0.0800 16.40 1.31
0101010005 PEON hh 0.0200 0.1600 11.89 1.90
3.21
Materiales
02620400010010 INTERRUPTOR TERMOMAGNETICO 2 X32 A X 220 V und 2.0000 52.30 104.60
02620400010012 INTERRUPTOR TERMOMAGNETICO 2 X20 A X 240 V und 2.0000 48.50 97.00
0274010003 TABLERO DE DISTRIBUCION 30/220V/50Hz/18 POLOS und 1.0000 120.00 120.00
321.60
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.21 0.10
0.10
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 005 INSTALACIONES ELECTRICAS Fecha presupuesto 30/09/2023
Partida 05.04.01 INTERRUPTOR TERMOMAGNETICO 2X60AMP DE PROGRAMACION Y CONTROL

Rendimiento und/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : und 86.24

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
3.21
Materiales
02620400010009 INTERRUPTOR TERMOMAGNETICO 3 X60 A. und 1.0000 82.93 82.93
82.93
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.21 0.10
0.10

Partida 05.04.02 INTERRUPTOR TERMOMAGNETICO 2X20 AMP

Rendimiento und/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : und 51.81

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0800 16.40 1.31
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
3.21
Materiales
02620400010012 INTERRUPTOR TERMOMAGNETICO 2 X20 A X 240 V und 1.0000 48.50 48.50
48.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.21 0.10
0.10

Partida 05.04.03 INTERRUPTOR DIFERENCIAL 25AMP X 30MM AMP

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 138.31

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0100 0.0800 16.40 1.31
0101010005 PEON hh 0.0200 0.1600 11.89 1.90
3.21
Materiales
02620500040019 INTERRUPTOR DIFERENCIAL 25AMPX30MM AMP und 1.0000 135.00 135.00
135.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.21 0.10
0.10

Partida 05.05.01 CONDUCTOR 10MM2 N2XOH

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 6.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1600 16.40 2.62
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
4.52
Materiales
0270010292 CONDUCTOR 10MM2 N2XOH m 1.0000 2.30 2.30
2.30
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.52 0.14
0.14
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 005 INSTALACIONES ELECTRICAS Fecha presupuesto 30/09/2023

Partida 05.05.02 CONDUCTOR 2.5MM2 LSOH

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 6.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1600 16.40 2.62
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
4.52
Materiales
0270010293 CONDUCTOR 2.5MM2 LSOHX100M m 1.0000 2.30 2.30
2.30
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.52 0.14
0.14

Partida 05.05.03 CONDUCTOR CU DESNUDO 10MM2

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 12.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1600 16.40 2.62
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
4.52
Materiales
02710700010003 CONDUCTOR DESNUDO DE ALEACION DE ALUMINIO 10 mm2 m 1.0000 8.00 8.00
8.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.52 0.14
0.14

Partida 05.06.01 POZO A TIERRA

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 1,800.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0416010002 SC POZO A TIERRA und 1.0000 1,800.00 1,800.00
1,800.00

Partida 05.07.01 REFLECTORES DE 400W-HALOGENO

Rendimiento und/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : und 482.22

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 16.40 13.12
0101010005 PEON hh 2.0000 1.6000 11.89 19.02
32.14
Materiales
02600400010004 CONDENSADOR VM 400 W und 1.0000 84.00 84.00
0270010294 CABLE TW # 10 AWG-4 MM2 m 8.0000 1.89 15.12
0270110324 REFLECTOR DE 400W und 1.0000 350.00 350.00
449.12
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 32.14 0.96
0.96
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 006 GRASS SINTETICO Fecha presupuesto 30/09/2023
Partida 06.02 EXT. RIEGO Y COMP. DE BASE C/MATERIAL SELECCIONADO E=0.10 C/MAQUINARIA

Rendimiento m2/DIA MO. 800.0000 EQ. 800.0000 Costo unitario directo por : m2 13.85

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0100 16.40 0.16
0101010005 PEON hh 1.0000 0.0100 11.89 0.12
0.28
Materiales
0207040001 MATERIAL GRANULAR m3 0.1300 60.00 7.80
7.80
Equipos
03010400030002 MOTOBOMBA 3" (7 HP) día 1.0000 0.0013 80.00 0.10
03011900020002 RODILLO VIBRATORIO DYNAPAC LISO CA-25 hm 1.0000 0.0100 172.00 1.72
03012000010002 MOTONIVELADORA FIAT FG-85A hm 1.0000 0.0100 214.57 2.15
03012200050002 CAMION CISTERNA (3,500 GLNS.) hm 1.0000 0.0100 180.00 1.80
5.77

Partida 06.03.01 PROVISION Y COLOCACION DE GRASS SINTETICO E=0.05 M

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 61,918.81

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0625 0.5000 16.40 8.20
0101010005 PEON hh 0.1250 1.0000 11.89 11.89
20.09
Materiales
02070200010001 ARENA FINA m3 0.1000 106.20 10.62
02070200010002 ARENA GRUESA m3 0.1000 75.00 7.50
0216020011 PROVISION Y COLOCACION DE GRASS SINTETICO m2 910.0000 68.00 61,880.00
61,898.12
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.09 0.60
0.60
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 007 MOBILIARIO Fecha presupuesto 30/09/2023
Partida 07.01 ARCOS CON ESTRUCTURA METALICA INCL. INSTALACION

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 3,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02900200020024 ARCOS DE FUTBOL INC. PINTURA E INSTALACION und 2.0000 1,500.00 3,000.00
3,000.00

Partida 07.02 RED DE VOLEY INCLUYE PARANTES, CUERDAS E INSTALACION

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 800.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
0271010063 RED DE VOLEY CON PARANTES INC. INSTALACION und 1.0000 800.00 800.00
800.00

Partida 07.03 RED PERIMETRAL DE GRASS INCL. OREJERAS METALICAS

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 780.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02671100080003 PROTECCION DE COLUMNAS ANTIGOLPES und 2.0000 215.00 430.00
0271010064 RED PERIMETRAL GRASS INCL. OREJERAS METALICAS und 1.0000 350.00 350.00
780.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
Partida 08.01.01 TRAZO Y REPLANTEO EN EL PROCESO

Rendimiento m2/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : m2 4.45

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 3.0000 0.1200 11.89 1.43
01010300000005 OPERARIO TOPOGRAFO hh 1.0000 0.0400 16.40 0.66
2.09
Materiales
0207030001 HORMIGON m3 0.0062 82.60 0.51
0207070001 AGUA PUESTA EN OBRA m3 0.0006 12.00 0.01
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.0180 25.40 0.46
02130400010001 TIZA BOLSA DE 40 kg und 0.0200 15.00 0.30
02130600010001 OCRE ROJO kg 0.0100 6.00 0.06
0240020001 PINTURA ESMALTE gal 0.0050 25.00 0.13
1.47
Equipos
0301000002 NIVEL TOPOGRAFICO día 1.0000 0.0050 50.00 0.25
0301000009 ESTACION TOTAL día 1.0000 0.0050 120.00 0.60
03014900010001 CORDEL rll 0.0015 25.00 0.04
0.89

Partida 08.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS

Rendimiento m3/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : m3 24.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.0000 11.89 23.78
23.78
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 23.78 0.71
0.71

Partida 08.02.02 EXCAVACION PARA ZAPATAS

Rendimiento m3/DIA MO. 3.0000 EQ. 3.0000 Costo unitario directo por : m3 32.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 2.6667 11.89 31.71
31.71
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 31.71 0.95
0.95

Partida 08.02.03 EXCAVACION PARA VEREDAS INCL. UÑAS

Rendimiento m3/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : m3 28.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 0.2857 2.2857 11.89 27.18
27.18
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 27.18 0.82
0.82

Partida 08.02.04 REFINE, NIVELACION Y COMPACTACION

Rendimiento m2/DIA MO. 15.0000 EQ. 15.0000 Costo unitario directo por : m2 6.34
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010005 PEON hh 1.0000 0.5333 11.89 6.34
6.34

Partida 08.02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO

Rendimiento m3/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m3 55.29

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.4444 13.18 5.86
0101010005 PEON hh 8.0000 3.5556 11.89 42.28
48.14
Materiales
0201030001 GASOLINA gal 0.1500 19.00 2.85
0207070001 AGUA PUESTA EN OBRA m3 0.0800 12.00 0.96
3.81
Equipos
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0556 60.00 3.34
3.34

Partida 08.02.06 AFIRMADO E=4" EN PISOS INTERIORES

Rendimiento m3/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m3 55.29

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.4444 13.18 5.86
0101010005 PEON hh 8.0000 3.5556 11.89 42.28
48.14
Materiales
0201030001 GASOLINA gal 0.1500 19.00 2.85
0207070001 AGUA PUESTA EN OBRA m3 0.0800 12.00 0.96
3.81
Equipos
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0556 60.00 3.34
3.34

Partida 08.02.07 AFIRMADO E=4" EN PISOS EXTERIORES

Rendimiento m3/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m3 55.29

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.4444 13.18 5.86
0101010005 PEON hh 8.0000 3.5556 11.89 42.28
48.14
Materiales
0201030001 GASOLINA gal 0.1500 19.00 2.85
0207070001 AGUA PUESTA EN OBRA m3 0.0800 12.00 0.96
3.81
Equipos
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0556 60.00 3.34
3.34

Partida 08.03.01 SOLADO PARA ZAPATAS E=4"

Rendimiento m2/DIA MO. 100.0000 EQ. 100.0000 Costo unitario directo por : m2 37.82

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0800 16.40 1.31
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0101010004 OFICIAL hh 1.5000 0.1200 13.18 1.58
0101010005 PEON hh 7.0000 0.5600 11.89 6.66
9.55
Materiales
0201030001 GASOLINA gal 0.0600 19.00 1.14
0207030001 HORMIGON m3 0.0890 82.60 7.35
0207070001 AGUA PUESTA EN OBRA m3 0.0100 12.00 0.12
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3960 25.40 10.06
18.67
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.0800 120.00 9.60
9.60

Partida 08.03.02 CONCRETO CIMIENTOS CORRIDOS 1:10+30%P.G.

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 259.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 2.0000 0.5333 16.40 8.75
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 11.0000 2.9333 11.89 34.88
47.15
Materiales
0201040001 PETROLEO D-2 gal 0.2286 16.00 3.66
0207010006 PIEDRA GRANDE DE 8" m3 0.4800 70.80 33.98
0207030001 HORMIGON m3 0.8300 82.60 68.56
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 2.9000 25.40 73.66
179.86
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.2667 120.00 32.00
32.00

Partida 08.03.03 CONCRETO SOBRECIMIENTOS 1:8 + 25% P.M.

Rendimiento m3/DIA MO. 20.0000 EQ. 20.0000 Costo unitario directo por : m3 287.84

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4000 16.40 6.56
0101010004 OFICIAL hh 1.5000 0.6000 13.18 7.91
0101010005 PEON hh 9.5000 3.8000 11.89 45.18
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.4000 16.40 6.56
66.21
Materiales
0201040001 PETROLEO D-2 gal 0.2285 16.00 3.66
0207010005 PIEDRA MEDIANA m3 0.4000 80.00 32.00
0207030001 HORMIGON m3 0.8500 82.60 70.21
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 4.0000 25.40 101.60
209.63
Equipos
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.4000 30.00 12.00
12.00

Partida 08.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 21.12

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
19.72
Materiales
0231010001 MADERA TORNILLO p2 0.0750 5.50 0.41
0.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 19.72 0.99
0.99

Partida 08.03.05 FALSO PISO, E=4" MEZCLA 1:10 C:H

Rendimiento m2/DIA MO. 100.0000 EQ. 100.0000 Costo unitario directo por : m2 32.79

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 4.0000 0.3200 16.40 5.25
0101010004 OFICIAL hh 1.0000 0.0800 13.18 1.05
0101010005 PEON hh 6.0000 0.4800 11.89 5.71
12.01
Materiales
0201030001 GASOLINA gal 0.0200 19.00 0.38
02070200010002 ARENA GRUESA m3 0.0420 75.00 3.15
0207070001 AGUA PUESTA EN OBRA m3 0.0110 12.00 0.13
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2960 25.40 7.52
11.18
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.0800 120.00 9.60
9.60

Partida 08.04.01.01 CONCRETO ZAPATAS f'c=210 kg/cm2

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 429.61

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2667 16.40 4.37
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 6.0000 1.6000 11.89 19.02
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 2.0000 0.5333 16.40 8.75
35.66
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 90.00 76.50
02070200010002 ARENA GRUESA m3 0.4200 75.00 31.50
0207030001 HORMIGON m3 0.2500 82.60 20.65
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 25.40 247.40
378.21
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 35.66 1.07
03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 1.0000 0.2667 25.00 6.67
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.2667 30.00 8.00
15.74

Partida 08.04.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/06/2023
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 08.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2

Rendimiento m3/DIA MO. 30.0000 EQ. 30.0000 Costo unitario directo por : m3 441.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2667 16.40 4.37
0101010004 OFICIAL hh 1.0000 0.2667 13.18 3.52
0101010005 PEON hh 8.0000 2.1333 11.89 25.36
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.2667 16.40 4.37
37.62
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.5000 82.60 41.30
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 25.40 246.38
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
401.30
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0333 35.00 1.17
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.1000 0.0267 30.00 0.80
0301340001 ANDAMIO METALICO día 1.0000 0.0333 18.00 0.60
2.57

Partida 08.04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN COLUMNAS

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 72.59

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010005 PEON hh 1.0000 0.6667 11.89 7.93
18.86
Materiales
0201040001 PETROLEO D-2 gal 0.0500 16.00 0.80
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 1.5000 5.10 7.65
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1200 5.10 0.61
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.1000 5.10 0.51
0231010001 MADERA TORNILLO p2 0.5964 5.50 3.28
0231220002 PANEL 1.20X1.80XM PARA MURO m2 0.0800 403.84 32.31
45.16
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 18.86 0.57
03010300040004 PUNTALES S-2 día 16.0000 1.3333 6.00 8.00
8.57

Partida 08.04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 08.04.03.01 CONCRETO VIGAS COLLARIN F'C=210 KG/CM2

Rendimiento m3/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m3 468.30

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4444 16.40 7.29
0101010004 OFICIAL hh 1.0000 0.4444 13.18 5.86
0101010005 PEON hh 8.0000 3.5556 11.89 42.28
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000 0.4444 16.40 7.29
62.72
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.5000 82.60 41.30
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 25.40 246.38
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
401.30
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0556 35.00 1.95
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.1000 0.0444 30.00 1.33
0301340001 ANDAMIO METALICO día 1.0000 0.0556 18.00 1.00
4.28

Partida 08.04.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 21.12

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
19.72
Materiales
0231010001 MADERA TORNILLO p2 0.0750 5.50 0.41
0.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 19.72 0.99
0.99

Partida 08.04.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 08.04.04.01 CONCRETO EN LOSA MACIZA F'C=210 KG/CM2

Rendimiento m3/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m3 523.87

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
0101010005 PEON hh 8.0000 5.3333 11.89 63.41
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 3.0000 2.0000 16.40 32.80
115.93
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 90.00 81.00
02070200010002 ARENA GRUESA m3 0.4000 75.00 30.00
0207030001 HORMIGON m3 0.5000 82.60 41.30
0207070001 AGUA PUESTA EN OBRA m3 0.1800 12.00 2.16
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.0000 25.40 228.60
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
383.52
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0833 35.00 2.92
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 1.0000 0.6667 30.00 20.00
0301340001 ANDAMIO METALICO día 1.0000 0.0833 18.00 1.50
24.42

Partida 08.04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA DOS CARAS EN PLACAS

Rendimiento m2/DIA MO. 12.9600 EQ. 12.9600 Costo unitario directo por : m2 75.72

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6173 16.40 10.12
0101010005 PEON hh 1.0000 0.6173 11.89 7.34
17.46
Materiales
0201040001 PETROLEO D-2 gal 0.0500 16.00 0.80
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 1.5000 5.10 7.65
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 0.0660 5.10 0.34
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.1000 5.10 0.51
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.2000 5.10 1.02
0231010001 MADERA TORNILLO p2 0.5964 5.50 3.28
0231220002 PANEL 1.20X1.80XM PARA MURO m2 0.0800 403.84 32.31
45.91
Equipos
03010300040004 PUNTALES S-2 día 16.0000 1.2346 6.00 7.41
03010800030002 SIERRA CIRCULAR hm 1.0000 0.6173 8.00 4.94
12.35

Partida 08.04.04.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 08.04.05.01 CONCRETO MONTANTE, F'C=175 KG/CM2

Rendimiento m3/DIA MO. 22.0000 EQ. 22.0000 Costo unitario directo por : m3 345.54

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.3636 16.40 5.96
0101010004 OFICIAL hh 1.0000 0.3636 13.18 4.79
0101010005 PEON hh 9.0000 3.2727 11.89 38.91
49.66
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.5500 90.00 49.50
02070200010002 ARENA GRUESA m3 0.5400 75.00 40.50
0207070001 AGUA PUESTA EN OBRA m3 0.1850 12.00 2.22
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.0000 25.40 203.20
0231010001 MADERA TORNILLO p2 0.0833 5.50 0.46
295.88

Partida 08.04.05.02 ENCOFRADO Y DESENCOFRADO EN MONTANTE

Rendimiento m2/DIA MO. 12.0000 EQ. 12.0000 Costo unitario directo por : m2 21.12

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 16.40 10.93
0101010004 OFICIAL hh 1.0000 0.6667 13.18 8.79
19.72
Materiales
0231010001 MADERA TORNILLO p2 0.0750 5.50 0.41
0.41
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 19.72 0.99
0.99

Partida 08.04.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Rendimiento kg/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : kg 7.02

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0400 16.40 0.66
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
1.19
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0250 5.10 0.13
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0400 5.10 5.30
5.43
Equipos
0301110002 CORTADORA DE ACERO día 1.0000 0.0050 80.00 0.40
0.40

Partida 08.05.01.01.01 MURO DE SOGA CARAVISTA CON LADRILLO KING KONG DE ARCILLA MORTERO 1:5 JUNTA 1.5CM
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
Rendimiento m2/DIA MO. 4.9000 EQ. 4.9000 Costo unitario directo por : m2 98.19

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.6327 16.40 26.78
0101010005 PEON hh 1.0000 1.6327 11.89 19.41
46.19
Materiales
02040600010016 ACERO LISO EN VARILLAS DE 1/4" kg 1.5000 6.00 9.00
02070200010002 ARENA GRUESA m3 0.0222 75.00 1.67
0207070001 AGUA PUESTA EN OBRA m3 0.0071 12.00 0.09
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1434 25.40 3.64
02160100010001 LADRILLO KK 18 HUECOS 9X13X24 cm mll 0.0380 950.00 36.10
0231010001 MADERA TORNILLO p2 0.2721 5.50 1.50
52.00

Partida 08.05.01.02.01 TARRAJEO EN CIELORASO

Rendimiento m2/DIA MO. 7.5000 EQ. 7.5000 Costo unitario directo por : m2 43.32

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.0667 16.40 17.49
0101010005 PEON hh 0.7500 0.8000 11.89 9.51
27.00
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0068 12.00 0.08
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1780 25.40 4.52
0231010001 MADERA TORNILLO p2 0.7280 5.50 4.00
11.40
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0301340001 ANDAMIO METALICO día 2.0000 0.2667 18.00 4.80
4.92

Partida 08.05.01.02.02 TARRAJEO EN VIGAS

Rendimiento m2/DIA MO. 6.0000 EQ. 6.0000 Costo unitario directo por : m2 40.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.3333 16.40 21.87
0101010005 PEON hh 0.5000 0.6667 11.89 7.93
29.80
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0060 12.00 0.07
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1750 25.40 4.45
0231010001 MADERA TORNILLO p2 0.1300 5.50 0.72
8.04
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0301340001 ANDAMIO METALICO día 1.0000 0.1667 18.00 3.00
3.12

Partida 08.05.01.02.03 TARRAJEO EN COLUMNAS

Rendimiento m2/DIA MO. 6.0000 EQ. 6.0000 Costo unitario directo por : m2 40.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0101010003 OPERARIO hh 1.0000 1.3333 16.40 21.87
0101010005 PEON hh 0.5000 0.6667 11.89 7.93
29.80
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0060 12.00 0.07
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1750 25.40 4.45
0231010001 MADERA TORNILLO p2 0.1300 5.50 0.72
8.04
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0301340001 ANDAMIO METALICO día 1.0000 0.1667 18.00 3.00
3.12

Partida 08.05.01.02.04 VESTIDURAS DE DERRAMES

Rendimiento m/DIA MO. 6.0000 EQ. 6.0000 Costo unitario directo por : m 40.96

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.3333 16.40 21.87
0101010005 PEON hh 0.5000 0.6667 11.89 7.93
29.80
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0060 12.00 0.07
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1750 25.40 4.45
0231010001 MADERA TORNILLO p2 0.1300 5.50 0.72
8.04
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0301340001 ANDAMIO METALICO día 1.0000 0.1667 18.00 3.00
3.12

Partida 08.05.01.02.05 TARRAJEO EN ZOCALOS H=0.20M

Rendimiento m2/DIA MO. 8.0000 EQ. 8.0000 Costo unitario directo por : m2 29.56

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.0000 16.40 16.40
0101010005 PEON hh 0.5000 0.5000 11.89 5.95
22.35
Materiales
0207020001 ARENA m3 0.0236 100.00 2.36
0207070001 AGUA PUESTA EN OBRA m3 0.0068 12.00 0.08
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1850 25.40 4.70
0231010001 MADERA TORNILLO p2 0.0120 5.50 0.07
7.21

Partida 08.05.01.02.06 BRUÑAS DE 1 X 1 cm

Rendimiento m/DIA MO. 60.0000 EQ. 60.0000 Costo unitario directo por : m 5.43

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1333 16.40 2.19
0101010005 PEON hh 0.5000 0.0667 11.89 0.79
2.98
Materiales
0207070001 AGUA PUESTA EN OBRA m3 0.0030 12.00 0.04
02220900010005 MORTERO 1:4 (CEMENTO - ARENA) m3 0.0066 342.08 2.26
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0231010001 MADERA TORNILLO p2 0.0166 5.50 0.09
2.39
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0010 60.00 0.06
0.06

Partida 08.05.02.01 FALSO PISO, E=4" MEZCLA 1:10 C:H

Rendimiento m2/DIA MO. 100.0000 EQ. 100.0000 Costo unitario directo por : m2 32.79

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 4.0000 0.3200 16.40 5.25
0101010004 OFICIAL hh 1.0000 0.0800 13.18 1.05
0101010005 PEON hh 6.0000 0.4800 11.89 5.71
12.01
Materiales
0201030001 GASOLINA gal 0.0200 19.00 0.38
02070200010002 ARENA GRUESA m3 0.0420 75.00 3.15
0207070001 AGUA PUESTA EN OBRA m3 0.0110 12.00 0.13
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2960 25.40 7.52
11.18
Equipos
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.0800 120.00 9.60
9.60

Partida 08.05.02.02 PISO CERAMICO 30 X 30 PEGADO Y FRAGUADO CON CEMENTO GRIS

Rendimiento m2/DIA MO. 5.0000 EQ. 5.0000 Costo unitario directo por : m2 112.87

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.6000 16.40 26.24
0101010005 PEON hh 0.2500 0.4000 11.89 4.76
31.00
Materiales
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2500 25.40 6.35
0213070002 FRAGUA CON CEMENTO GRIS m2 1.0000 4.96 4.96
0225020121 CERAMICA CELIMA 0.30X0.30 cm m2 1.0500 67.00 70.35
81.66
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0035 60.00 0.21
0.21

Partida 08.05.02.03 VEREDA DE CONCRETO E=4" SARDINEL + PASTA

Rendimiento m2/DIA MO. 200.0000 EQ. 200.0000 Costo unitario directo por : m2 35.51

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 8.0000 0.3200 16.40 5.25
0101010004 OFICIAL hh 1.0000 0.0400 13.18 0.53
0101010005 PEON hh 6.0000 0.2400 11.89 2.85
8.63
Materiales
0201040001 PETROLEO D-2 gal 0.0200 16.00 0.32
0207030001 HORMIGON m3 0.0800 82.60 6.61
0207070001 AGUA PUESTA EN OBRA m3 0.0860 12.00 1.03
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.7000 25.40 17.78
25.74
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0050 35.00 0.18
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
03012900030001 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 0.8000 0.0320 30.00 0.96
1.14

Partida 08.05.02.04 ENCOFRADO EN VEREDAS H=0.10 M

Rendimiento m2/DIA MO. 24.0000 EQ. 24.0000 Costo unitario directo por : m2 11.22

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.3333 16.40 5.47
0101010005 PEON hh 1.0000 0.3333 11.89 3.96
9.43
Materiales
0201040001 PETROLEO D-2 gal 0.0050 16.00 0.08
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.0600 5.10 0.31
0231010001 MADERA TORNILLO p2 0.2553 5.50 1.40
1.79

Partida 08.05.02.05 BRUÑAS DE 1 X 1 cm

Rendimiento m/DIA MO. 60.0000 EQ. 60.0000 Costo unitario directo por : m 5.43

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1333 16.40 2.19
0101010005 PEON hh 0.5000 0.0667 11.89 0.79
2.98
Materiales
0207070001 AGUA PUESTA EN OBRA m3 0.0030 12.00 0.04
02220900010005 MORTERO 1:4 (CEMENTO - ARENA) m3 0.0066 342.08 2.26
0231010001 MADERA TORNILLO p2 0.0166 5.50 0.09
2.39
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0010 60.00 0.06
0.06

Partida 08.05.02.06 JUNTAS ASFALTICAS E=1"

Rendimiento m/DIA MO. 70.0000 EQ. 70.0000 Costo unitario directo por : m 9.61

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.1143 13.18 1.51
0101010005 PEON hh 2.0000 0.2286 11.89 2.72
4.23
Materiales
02010500010004 ASFALTO LIQUIDO RC-250 gal 0.0100 120.00 1.20
02070200010002 ARENA GRUESA m3 0.0200 75.00 1.50
02311900010002 MADERA PINO EN LISTONES und 0.0500 15.00 0.75
3.45
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.23 0.13
03013900080001 COCINA DE ASFALTO 160 gl hm 0.0875 0.0100 180.00 1.80
1.93

Partida 08.05.03.01 ZOCALO DE CEMENTO EXTERIOR H=0.20M

Rendimiento m/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : m 30.14

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 16.40 13.12
0101010005 PEON hh 0.7500 0.6000 11.89 7.13
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
20.25
Materiales
0207020001 ARENA m3 0.0280 100.00 2.80
0207070001 AGUA PUESTA EN OBRA m3 0.0054 12.00 0.06
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1780 25.40 4.52
0231010001 MADERA TORNILLO p2 0.4340 5.50 2.39
9.77
Equipos
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.0020 60.00 0.12
0.12

Partida 08.05.03.02 ZOCALO DE MAYOLICA DE 20X30CM H=1.80 (SS.HH)

Rendimiento m2/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m2 76.84

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.3750 0.0600 16.40 0.98
0101010005 PEON hh 0.1875 0.0300 11.89 0.36
1.34
Materiales
0222080001 PEGAMENTO CELIMA EN POLVO kg 0.1000 25.00 2.50
0225020050 CERAMICA CELIMA SERIE GRANILLA LISTELO DE 0.075X0.20 m 1.0000 8.00 8.00
0225020123 CERAMICA CELIMA SERIE GRANILLA BLANCA PISO/PARED DE m2 1.0000 65.00 65.00
0.30X0.30
75.50

Partida 08.05.04.01 COBERTURA CON TEJA ANDINA

Rendimiento m2/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m2 66.49

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1600 16.40 2.62
0101010005 PEON hh 1.0000 0.1600 11.89 1.90
4.52
Materiales
0228180002 TEJA ANDINA (1.16x0.70 m.) pln 1.3000 45.00 58.50
0231010001 MADERA TORNILLO p2 0.5000 5.50 2.75
61.25
Equipos
0301340001 ANDAMIO METALICO día 2.0000 0.0400 18.00 0.72
0.72

Partida 08.05.05.01 PUERTA APANELADA P-01

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 420.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02621500010006 PUERTA APANELADA SEGUN PLANOS P-1 und 1.0000 420.00 420.00
420.00

Partida 08.05.05.02 VENTANA V-01

Rendimiento und/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : und 350.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0410020001 SC VENTANA DE MADERA A TODO COSTO m2 1.0000 350.00 350.00
350.00

Partida 08.05.05.03 PUERTAS Y DIVISION EN MELAMINA


S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023

Rendimiento glb/DIA MO. 2.0000 EQ. 2.0000 Costo unitario directo por : glb 3,600.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0409130008 SC CARPINTERIA EN MELAMINE (PUERTAS Y DIVISIONES DE glb 2.0000 1,800.00 3,600.00
SS.HH)
3,600.00

Partida 08.05.06.01 VIDRIO TRIPLE (6MM)

Rendimiento p2/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : p2 11.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0412010005 SC PUERTAS Y VENTANAS DE CRISTAL CRUDO (3 mm.) p2 2.0000 5.50 11.00
11.00

Partida 08.05.07.01 PINTURA LATEX EN CIELORRASOS 2 MANOS

Rendimiento m2/DIA MO. 15.0000 EQ. 15.0000 Costo unitario directo por : m2 19.62

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.5333 16.40 8.75
0101010005 PEON hh 0.5000 0.2667 11.89 3.17
11.92
Materiales
0231010001 MADERA TORNILLO p2 0.0250 5.50 0.14
0238010004 LIJA PARA PARED plg 0.2500 1.20 0.30
0240010001 PINTURA LATEX gal 0.1000 45.00 4.50
4.94
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 11.92 0.36
0301340001 ANDAMIO METALICO día 2.0000 0.1333 18.00 2.40
2.76

Partida 08.05.07.02 PINTURA LATEX EN VIGAS 2 MANOS

Rendimiento m2/DIA MO. 18.0000 EQ. 18.0000 Costo unitario directo por : m2 18.53

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.1110 0.4938 16.40 8.10
0101010005 PEON hh 0.5555 0.2469 11.89 2.94
11.04
Materiales
0231010001 MADERA TORNILLO p2 0.0250 5.50 0.14
0238010004 LIJA PARA PARED plg 0.2500 1.20 0.30
0240010001 PINTURA LATEX gal 0.1000 45.00 4.50
4.94
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 11.04 0.33
0301340001 ANDAMIO METALICO día 2.2220 0.1234 18.00 2.22
2.55

Partida 08.05.07.03 PINTURA LATEX EN COLUMNAS 2 MANOS

Rendimiento m2/DIA MO. 25.0000 EQ. 25.0000 Costo unitario directo por : m2 17.17

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.3888 0.4444 16.40 7.29
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0101010005 PEON hh 0.6944 0.2222 11.89 2.64
9.93
Materiales
0231010001 MADERA TORNILLO p2 0.0250 5.50 0.14
0238010004 LIJA PARA PARED plg 0.2500 1.20 0.30
0240010001 PINTURA LATEX gal 0.1000 45.00 4.50
4.94
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 9.93 0.30
0301340001 ANDAMIO METALICO día 2.7775 0.1111 18.00 2.00
2.30

Partida 08.05.07.04 PINTURA LATEX EN ZOCALO H=20CM

Rendimiento m/DIA MO. 50.0000 EQ. 50.0000 Costo unitario directo por : m 5.05

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.2500 0.2000 16.40 3.28
0101010005 PEON hh 0.6250 0.1000 11.89 1.19
4.47
Materiales
0240010001 PINTURA LATEX gal 0.0100 45.00 0.45
0.45
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.47 0.13
0.13

Partida 08.06.01.01 SALIDA PARA CENTRO DE LUZ

Rendimiento pto/DIA MO. 5.0000 EQ. 5.0000 Costo unitario directo por : pto 68.27

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.6000 16.40 26.24
0101010005 PEON hh 1.0000 1.6000 11.89 19.02
45.26
Materiales
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
02680400010001 CAJA DE PASE OCTOGONAL SAP 100 X 40 mm und 8.0000 2.50 20.00
20.75
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 45.26 2.26
2.26

Partida 08.06.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE + LINEA A TIERRA (MAGIG) (OBRAS EXTERIORES)

Rendimiento pto/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : pto 201.51

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 8.0000 16.40 131.20
0101010005 PEON hh 0.5000 4.0000 11.89 47.56
178.76
Materiales
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
02621300010002 TOMACORRIENTE BIPOLAR DOBLE MODUS + L.T. und 2.0000 8.50 17.00
02680700010001 CAJA RECTANGULAR SAP DE 100 x 55 x 50 mm und 2.0000 2.50 5.00
22.75

Partida 08.06.01.03 SALIDA PARA INTERRUPTOR BIPOLAR


S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 74.66

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.2500 2.0000 16.40 32.80
0101010005 PEON hh 0.2500 2.0000 11.89 23.78
56.58
Materiales
0222080012 PEGAMENTO PARA PVC gal 0.0100 75.00 0.75
02620500020005 INTERRUPTOR BIPOLAR MODUS 642A pza 4.0000 3.00 12.00
02680700010001 CAJA RECTANGULAR SAP DE 100 x 55 x 50 mm und 1.0000 2.50 2.50
15.25
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 56.58 2.83
2.83

Partida 08.06.01.04 CURVA PVC-SAP ELECTRICA DE 20 mm

Rendimiento und/DIA MO. 80.0000 EQ. 80.0000 Costo unitario directo por : und 10.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050200010002 CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 10.0000 1.00 10.00
10.00

Partida 08.06.01.05 UNIONES PVC-SAP ELECTRICA DE 20MM

Rendimiento und/DIA MO. 80.0000 EQ. 80.0000 Costo unitario directo por : und 10.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02051800010017 UNIONES PVC SAP 3/4" ELECTRICAS (20MM) UND und 4.0000 2.50 10.00
10.00

Partida 08.06.01.06 TUBERIA PVC-SAP 3/4" ELECTRICAS (20MM)

Rendimiento m/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : m 4.50

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050700020025 TUBERIA PVC SAP ELECTRICA DE 3/4"X3M (20MM) m 1.0000 4.50 4.50
4.50

Partida 08.06.01.07 CONDUCTOR 2.5MM2 TW

Rendimiento m/DIA MO. 480.0000 EQ. 480.0000 Costo unitario directo por : m 10.80

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
0270010014 ALAMBRE TW 2.5 mm2 m 36.0000 0.30 10.80
10.80

Partida 08.06.01.08 CONDUCTOR 4MM2 TW

Rendimiento m/DIA MO. 600.0000 EQ. 600.0000 Costo unitario directo por : m 18.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
0270010015 ALAMBRE TW 4 mm2 m 36.0000 0.50 18.00
18.00

Partida 08.06.02.01 TABLERO DE DISTRIBUCION 30/220v/50Hz/18 POLOS

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 324.91
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.0100 0.0800 16.40 1.31
0101010005 PEON hh 0.0200 0.1600 11.89 1.90
3.21
Materiales
02620400010010 INTERRUPTOR TERMOMAGNETICO 2 X32 A X 220 V und 2.0000 52.30 104.60
02620400010012 INTERRUPTOR TERMOMAGNETICO 2 X20 A X 240 V und 2.0000 48.50 97.00
0274010003 TABLERO DE DISTRIBUCION 30/220V/50Hz/18 POLOS und 1.0000 120.00 120.00
321.60
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.21 0.10
0.10

Partida 08.06.03.01 LUMINARIA LED PLAFON CIRCULAR 24W 100-240V 6500K ADOSABLE

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 88.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
0270110325 LUMINARIA LED PLAFON CIRCULAR 24W 100-240V 6500K und 1.0000 88.00 88.00
88.00

Partida 08.07.01.01 SALIDA DE AGUA FRIA

Rendimiento pto/DIA MO. 4.0000 EQ. 4.0000 Costo unitario directo por : pto 17.79

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 1.0000 16.40 16.40
0101010005 PEON hh 0.0200 0.0400 11.89 0.48
16.88
Materiales
0241030001 CINTA TEFLON und 0.2000 2.00 0.40
0.40
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 16.88 0.51
0.51

Partida 08.07.01.02 CODO PVC SAP 1/2"

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 2.80

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02051000020008 CODO PVC SAP C/R 1/2" X 90° und 1.0000 2.80 2.80
2.80

Partida 08.07.01.03 TEE PVC SAP 1/2"

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 2.60

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02051100010016 TEE PVC SAP S/P 1/2" und 1.0000 2.60 2.60
2.60

Partida 08.07.01.04 TUBERIA PVC CLASE 10 1/2"

Rendimiento m/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : m 1.20

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
02050700020002 TUBERIA PVC-SAP C-10 S/P DE 1/2" X 5 m m 1.0000 1.20 1.20
1.20

Partida 08.07.01.05 VALVULA COMPUERTA DE BRONCE 1/2"

Rendimiento und/DIA MO. 8.0000 EQ. 8.0000 Costo unitario directo por : und 115.14

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.0000 16.40 16.40
0101010005 PEON hh 1.0000 1.0000 11.89 11.89
28.29
Materiales
02051900020005 ADAPTADOR PVC-SAP S/P 1 1/2" und 2.0000 2.00 4.00
02490600010001 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" und 2.0000 2.00 4.00
0253180001 VALVULA COMPUERTA DE 1/2" und 1.0000 78.00 78.00
86.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 28.29 0.85
0.85

Partida 08.07.01.06 SALIDA DE PVC SAL PARA DESAGUE DE 2"

Rendimiento pto/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : pto 24.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 16.40 13.12
0101010005 PEON hh 1.0000 0.8000 11.89 9.51
22.63
Materiales
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0200 35.00 0.70
0.70
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 22.63 0.68
0.68

Partida 08.07.01.07 SALIDA DESAGUE DE PVC-SAL 4"

Rendimiento pto/DIA MO. 8.0000 EQ. 8.0000 Costo unitario directo por : pto 29.84

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 1.0000 16.40 16.40
0101010005 PEON hh 1.0000 1.0000 11.89 11.89
28.29
Materiales
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0200 35.00 0.70
0.70
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 28.29 0.85
0.85

Partida 08.07.01.08 SALIDA DE PVC SAL PARA VENTILACION DE 2"

Rendimiento pto/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : pto 24.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 16.40 13.12
0101010005 PEON hh 1.0000 0.8000 11.89 9.51
22.63
Materiales
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0200 35.00 0.70
0.70
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 22.63 0.68
0.68

Partida 08.07.01.09 YEE REDUCCION DE 4"-2"

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 8.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02061100010013 YEE DOBLE PVC-SAL DE 4" A 2" und 1.0000 8.00 8.00
8.00

Partida 08.07.01.10 YEE DE 4"

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 6.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02061100010003 YEE DOBLE PVC-SAL DE 4" und 1.0000 6.00 6.00
6.00

Partida 08.07.01.11 CODO 4"X45°

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 4.70

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050900010009 CODO PVC-SAP S/P 4" X 90° und 1.0000 4.70 4.70
4.70

Partida 08.07.01.12 TUBERIA DE DESAGUE PVC SAL 2"

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 7.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050700020026 TUBERIA PVC SAP PRESION C-10 EC 2" X 5 M m 1.0000 7.00 7.00
7.00

Partida 08.07.01.13 TUBERIA DE DESAGUE PVC SAL 4"

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 9.40

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050700020024 TUBERIA PVC SAP PRESION C-10 EC 4" X 5 M m 1.0000 9.40 9.40
9.40

Partida 08.07.01.14 REGISTRO DE BRONCE 2"

Rendimiento und/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : und 28.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02461200030001 REGISTRO DE BRONCE DE 2" und 1.0000 28.00 28.00
28.00

Partida 08.07.01.15 REGISTRO DE BRONCE 4"

Rendimiento und/DIA MO. 10.0000 EQ. 10.0000 Costo unitario directo por : und 42.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 008 SS.HH Fecha presupuesto 30/09/2023
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02461200030003 REGISTRO DE BRONCE DE 4" und 1.0000 42.00 42.00
42.00

Partida 08.07.01.16 CAJA DE REGISTRO DE 12"X24" TAPA DE CONCRETO

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 60.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02682700010001 CAJA DE REGISTRO CONCRETO PREFABRICADO 12" x 24" und 1.0000 60.00 60.00
FONDO C/M
60.00

Partida 08.07.02.01 INODORO DE TANQUE BAJO

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 285.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02470200010015 INODORO DAKOTA ONE PIECE CALIFORNIA BONE und 1.0000 285.00 285.00
285.00

Partida 08.07.02.02 LAVADERO DE LOSA BLANCA

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 112.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02470700010007 LAVADERO DE LOSA AMAZONAS TREBOL COLOR BLANCO und 1.0000 112.00 112.00
112.00

Partida 08.07.02.03 URINARIO DE LOSA BLANCA

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 140.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02471100010001 URINARIO BAMBY (TREBOL) und 1.0000 140.00 140.00
140.00

Partida 08.07.03.01 TUBERIA PVC DE 3"

Rendimiento m/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : m 9.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
02050700020027 TUBERIA PVC SAP PRESION C-10 EC 3" X 5 M m 1.0000 9.00 9.00
9.00

Partida 08.07.03.02 ABRAZADERA PARA TUBO 3"

Rendimiento und/DIA MO. EQ. Costo unitario directo por : und 6.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Materiales
0204240009 ABRAZADERA DE FIERRO GALVANIZADO 3" und 1.0000 6.00 6.00
6.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 009 CAPACITACION Fecha presupuesto 30/09/2023
Partida 09.01 TALLERES DE SENSIBILIZACION DE BUENA PRACTICA DEPORTIVA

Rendimiento glb/DIA MO. EQ. Costo unitario directo por : glb 5,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0409130009 SC TALLER DE SENSIBILIZACION glb 1.0000 5,000.00 5,000.00
5,000.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 010 MITIGACION AMBIENTAL Fecha presupuesto 30/06/2023
Partida 10.01 EXCAVACION Y PREPARACION DE TIERRA PARA EL SEMBRIO DE PLANTAS ORNAMENTALES Y GRASS

Rendimiento glb/DIA MO. 1.0000 EQ. 1.0000 Costo unitario directo por : glb 6,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0420010005 SC JARDINERIA INC. MATERIALES glb 1.0000 6,000.00 6,000.00
6,000.00
S10 Página : 1

Análisis de precios unitarios


Presupuesto 0103002 PROYECTO: CREACION DEL SERVICIO DE PRACTICA DEPORTIVA Y/O RECREATIVA A TRAVES DE UN CAMPO DEPORTIVO CON
GRASS SINTETICO EN LA INSTITUCION EDUCATIVA MARIO VARGAS LLOSA DEL CENTRO POBLADO LOS ANGELES DEL EDEN
DEL DISTRITO DE PANGOA DE LA PROVINCIA DE
Subpresupuesto 011 FLETE Fecha presupuesto 30/06/2023
Partida 11.01 FLETE DE TRANSPORTE DE MATERIALES

Rendimiento glb/DIA MO. EQ. Costo unitario directo por : glb 20,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Subcontratos
0409130010 SC FLETE TERRESTRE glb 1.0000 20,000.00 20,000.00
20,000.00

You might also like