National Highways Authority of India

( Ministry of Road Transport and Highways)

Concessionaire : PNC Bundelkhand Highways Private Limited.

Four laning of Jhansi-Khajuraho section (Pkg-I) from km - 310to km 76.3 (existing km 108.300 of NH - 25 kanpur - Jhansi
Name of Project
Section to km 82.10 ) of NH -75/76 in the state of UP/MP under NHDP Phase -III on Hybrid Annuity Mode.

Independent Engineer

EPC : PNC Bundelkhand Highways Pvt.Ltd.

CALIFORNIA BEARING RATIO (CBR)

(IS 2720 : 1987 , Reaffirmed 1997 , Part- XVI )

Pit / Sample No. 1,2 Date of Sampling


Source Date of Soaking
Location / Layer Date of Testing
Intend use Tested By
Static / Dynamic M.D.D. 2.004 O.M.C 10.19
Plunger Area Proving Ring Factor
Blows Blows Blows

Mould No. Mould No. Mould No.


Penetration in mm

Load kg / cm2 Load kg / cm2 Load kg / cm2


Proving Ring Div Proving Ring Div Proving Ring Div
0.00
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
7.50
10.00
12.50
Mould No. 11 12 13
Mould No.
Description Unsoaked Soaked Unsoaked Soaked Unsoaked Soaked
Mould + Wet Soil 11246 11304 11728 11771 11289 11346 Initial Reading
Wt. of Empty Mould 6282 6282 6741 6741 6347 6347 Final Reading
wt. of Wet Soil 4964 5022 4987 5030 4942 4999 Ht of Sample
Volume of Mould 2250 2250 2250 2250 2250 2250 % of Swell
Wet Density gm/cc 2.206 2.232 2.217 2.236 2.197 2.222 From Graph
Container No. 5 46 6 47 7 48
Mould No.
Wt. of Container 59.2 54.6 55.1 59.1 59 57
Container + Wet Soil 230.57 189.39 227.99 196.38 222.66 194.25 Corrected Load 2.5mm
(kg/cm2)
Container + Dry Soil 214.30 174.98 211.11 181.66 207.35 179.72 5.0mm
Wt. of Dry Soil 155.10 120.38 156.01 122.56 148.35 122.72 2.5mm
CBR Value %
Wt. of Water 16.27 14.41 16.88 14.72 15.31 14.53 5.0mm
Moisture Content % 10.49 11.97 10.82 12.01 10.32 11.84
Dry Density gm/cc 1.997 1.993 2.000 1.996 1.991 1.987 CBR Value………..............at ............... of Compaction.
% Compaction 99.63 99.47 99.81 99.6 99.36 99.13

For EPC/PNC Bhundelkhand PVT. LTD. For Authority/Independent Engineer

Signature:_________________ Signature :__________________

Name :_________________ Name : _________________

Date : _________________ Date : _________________


CALIFORNIA BEARING RATIO TEST ( IS : 2720 Part - 16 )

Sample No :- 1 Date of Casting


Type of Material :- Soil Date of Testing

Proving Ring CF 4.13 MDD OMC


Load Load Load
Proving Ring Proving Ring Proving Ring
PENETRATION (MM)
Reading Reading Reading
(Kgf) (Kgf) (Kgf)
0.0 0 0.00 0 0.00 0 0
0.5 14 2.94 16 3.37 18 3.79
1.0 27 5.68 29 6.10 31 6.52
1.5 40 8.41 42 8.83 44 9.25
2.0 52 10.94 57 11.99 57 11.99
2.5 65 13.67 67 14.09 69 14.51
3.0 77 16.20 79 16.62 80 16.83
4.0 96 20.19 98 20.61 98 20.61
5.0 110 23.14 111 23.35 111 23.35
7.5 138 29.03 134 28.19 136 28.61
10.0 156 32.81 153 32.18 153 32.18
12.5 162 34.07 164 34.50 166 34.92
At 2.5 mm 102.00 14.09 14.51
Corrected Load(kg)
At 5.0 mm 23.14 23.35 23.35
At 2.5 mm 19.714 20.29 20.86
CBR Value(%)
At 5.0 mm 22.10 22.29 22.29

CBR Value at 97% MDD =


CALIFORNIA BEARING RATIO TEST ( IS : 2720 Part - 16 )
B.A No.- 170 (Sample No.- 3506-3507
Mould No. 10 At 56 Blows Mould No. 11 At 56 Blows Mould No. 12 At 56 Blows
Load
Load
36
Load 36 36
PENETRA
TION (MM)
(Kgf)
0.0 0.00 0.00 0
(Kgf) 34 34
34
0.5 2.94 3.37 (Kgf)
3.79
1.0 5.68 6.10 6.52
32 32
32 1.5 8.41 8.83 9.25
2.0 10.94 11.99 11.99
30 30
30 2.5 13.67 14.09 14.51
3.0 16.20 16.62 16.83
28 28
28 4.0 20.19 20.61 20.61
5.0 23.14 23.35 23.35
26 26
26 7.5 29.03 28.19 28.61
10.0 32.81 32.18 32.18
Load in kg/cm2

24 24
24 12.5 34.07 34.50 34.92

Load in kg/cm2
22 22
22

20 20
20

18 18
18

16 16
16

14 14
14

12 12
12

CBR Value at
CBR Value at 10 CBR Value at 10 2.5mm
10
2.5mm 2.5mm Penetration=
Penetration= Penetration= 14.6/70 x 100=
13.80/70 x 100= 14.20/70 x 8 20.86%
8 8 100= 20.29%
19.71%

6 6
6

CBR Value at CBR Value at CBR Value at


5.0mm 4 5.0mm 4 5.0mm
4 Penetration= Penetration
Penetration=
23.20/105 x 23.40/105 x 23.40/105 x
100= 22.10% 100=22.29% 100= 22.29%
2 2
2

0 0
0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0

Penetration in mm Penetration in mm Penetration in mm


CBR Value at 2.5mm Penetration= 19.71 % CBR Value at 2.5mm Penetration= 20.29 % CBR Value at 2.5mm Penetration= 20.86 %
CBR Value at 5.0mm Penetration= 22.10 % CBR Value at 5.0mm Penetration= 22.29 % CBR Value at 5.0mm Penetration= 22.29 %
National Highways Authority of India
( Ministry of Road Transport and Highways)
Concessionaire : PNC Bundelkhand Highways Private Limited.
: Four laning of Jhansi-Khajuraho section (Pkg-I) from km - 0.300 to km 76.3 (existing km 108.300 of NH - 25 kanpur - Jhansi Section to km 82.10 ) of NH -75/76 in the state
Name of Project
of UP/MP under NHDP Phase -III on Hybrid Annuity Mode.
Independent Engineer : Arvee Associates Architects Engineer & Consultants Pvt. Ltd
EPC Contractor : PNC Infratech Limited
BORROW AREA SOIL TEST RESULT ABSTRACT
B.A. No. : 45 Exten-1 Date of Sampling : 21.06.2018
Location : 2+400 L.H.S. 2.00 Km Lead Date of testing : 23.06.2018 to 26.06.2018
Purpose of use : Subgrade Approval Quantity (M3) : 60000

GRADATION PROCTOR TEST ATTERBERG LIMIT


DATE OF DATE OF SAMPLE TO BE USE
SR.NO SAMPLING TESTING NO SILT & FSI % CBR %
FOR
REMARKS
GRAVEL % SAND % MDD gm/cc OMC % LL % PL % PI %
CLAY %
1 21.06.2018 23.06.2018 1 46.34 26.00 27.66 2.015 10.20 11.11 26.85 16.98 9.87 Subgrade
2 21.06.2019 23.06.2018 2 42.64 30.03 27.33 1.992 10.17 13.64 26.30 16.78 9.52 Subgrade
3 21.06.2020 23.06.2018 3 41.78 31.68 26.54 1.993 10.03 10.52 27.30 17.48 9.82 Subgrade
4 21.06.2021 23.06.2018 4 42.13 29.53 28.34 2.011 10.02 13.64 27.15 17.48 9.67 Subgrade
5 21.06.2022 23.06.2018 5 40.56 32.86 26.58 2.013 10.03 12.50 27.40 17.97 9.43 Subgrade
6 21.06.2023 23.06.2018 6 42.38 29.79 27.83 1.995 10.21 12.00 28.00 17.76 10.24 Subgrade
7 21.06.2024 23.06.2018 7 42.12 29.18 28.70 1.998 10.04 9.52 27.70 16.53 11.17 Subgrade
8 21.06.2025 23.06.2018 8 43.46 29.73 26.81 2.017 10.24 10.00 28.20 18.37 9.83 Subgrade
9 21.06.2026 23.06.2018 9 45.62 26.75 27.63 2.011 10.23 10.53 26.60 17.96 8.64 Subgrade
10 21.06.2027 23.06.2018 10 43.60 27.09 29.31 2.006 10.21 11.11 27.00 16.79 10.21 Subgrade
11 21.06.2028 24.06.2018 11 45.42 25.82 28.76 1.996 10.09 13.64 27.60 16.40 11.20 Subgrade
12 21.06.2029 24.06.2018 12 43.54 30.12 26.34 1.988 10.10 11.54 28.20 19.08 9.12 Subgrade
13 21.06.2030 24.06.2018 13 43.58 27.07 29.35 1.989 10.07 13.64 27.60 18.25 9.35 Subgrade
14 21.06.2031 24.06.2018 14 43.32 30.34 26.34 2.008 10.13 11.54 27.20 16.07 11.13 Subgrade
15 21.06.2032 24.06.2018 15 42.16 29.48 28.36 2.004 10.13 12.00 28.15 17.53 10.62 Subgrade
16 21.06.2033 24.06.2018 16 43.77 28.98 27.25 1.086 10.15 13.64 27.60 16.95 10.65 Subgrade
17 21.06.2034 24.06.2018 17 42.12 29.18 28.70 1.999 10.13 10.52 28.00 16.37 11.63 Subgrade
18 21.06.2035 24.06.2018 18 42.64 30.03 27.33 1.994 10.07 12.00 27.40 17.43 9.97 Subgrade
19 21.06.2036 24.06.2018 19 43.32 30.34 26.34 2.000 10.07 10.00 27.50 17.81 9.69 Subgrade
20 21.06.2037 24.06.2018 20 45.62 26.75 27.63 2.012 10.09 15.79 28.30 19.48 8.82 Subgrade
21 21.06.2038 25.06.2018 21 33.00 40.61 26.39 2.009 10.06 14.29 27.80 18.75 9.05 Subgrade
22 21.06.2039 25.06.2018 22 100.00 0.00 Subgrade
23 21.06.2040 25.06.2018 23 100.00 0.00 Subgrade
24 21.06.2041 25.06.2018 24 100.00 0.00 Subgrade
25 21.06.2042 25.06.2018 25 100.00 0.00 Subgrade
26 21.06.2043 25.06.2018 26 100.00 0.00 Subgrade
27 21.06.2044 25.06.2018 27 100.00 0.00 Subgrade
28 21.06.2045 25.06.2018 28 100.00 0.00 Subgrade
29 21.06.2046 25.06.2018 29 100.00 0.00 Subgrade
National Highways Authority of India
( Ministry of Road Transport and Highways)
Concessionaire : PNC Bundelkhand Highways Private Limited.
: Four laning of Jhansi-Khajuraho section (Pkg-I) from km - 0.300 to km 76.3 (existing km 108.300 of NH - 25 kanpur - Jhansi Section to km 82.10 ) of NH -75/76 in the state
Name of Project
of UP/MP under NHDP Phase -III on Hybrid Annuity Mode.
Independent Engineer : Arvee Associates Architects Engineer & Consultants Pvt. Ltd
EPC Contractor : PNC Infratech Limited
BORROW AREA SOIL TEST RESULT ABSTRACT
B.A. No. : 45 Exten-1 Date of Sampling : 21.06.2018
Location : 2+400 L.H.S. 2.00 Km Lead Date of testing : 23.06.2018 to 26.06.2018
Purpose of use : Subgrade Approval Quantity (M3) : 60000
30 21.06.2047 25.06.2018 30 100.00 0.00 Subgrade
31 21.06.2048 26.06.2018 31 100.00 0.00 Subgrade
32 21.06.2049 26.06.2018 32 100.00 0.00 Subgrade
33 21.06.2050 26.06.2018 33 100.00 0.00 Subgrade
34 21.06.2051 26.06.2018 34 100.00 0.00 Subgrade
35 21.06.2052 26.06.2018 35 100.00 0.00 Subgrade
36 21.06.2053 26.06.2018 36 100.00 0.00 Subgrade
37 21.06.2054 26.06.2018 37 100.00 0.00 Subgrade
38 21.06.2055 26.06.2018 38 100.00 0.00 Subgrade
39 21.06.2056 26.06.2018 39 100.00 0.00 Subgrade
40 21.06.2057 26.06.2018 40 100.00 0.00 Subgrade

For Concessionaire/EPC For Authority/Independent Engineer