Module Duration Actual Location


identify hangar and work shop
1 40 Polibatam
safety precaution
Demonstration using electric
2 24 Polibatam
measurement devices
Lead Acid Battery and Nicad
3 40 Polibatam
Battery
4 DC Generator maintenance Polibatam
40
5 Measuring thermocouple Polibatam
AC measurements and
6 16 Polibatam
operational of oscilloscope

Identify and check various type


7 40 Polibatam
of resistor,capacitor and inductor

8 Electrical power gen.practice 40 Polibatam


9 Swaging cable 16 Polibatam
10 control cable system 24 Polibatam
Removal and installation aircraft
11 24 Polibatam
instruments
Identify aircraft fastener and
12 16 Polibatam
material
Fabrication and repair of
13 40 Polibatam
composite material
14 Corrosion Inspection 24 Polibatam
15 heat treatment 24 Polibatam
16 Use of common tools
17 Measuring by vernier caliper
40 Polibatam
18 Measuring by micrometer
19 Measuring by torque meter
attachment safety wire and cotter
20 24 Polibatam
pin
21 cutting, flaring and bending tube 24 Polibatam
22 aircraft jacking Polibatam
Removal/Installation Nose and
23
Wheel assy 80 Polibatam
24 Lubrication on Cessna 172
25 Aircraft weighing Polibatam
26 Bench working 80 Polibatam
27 Welding 40 Polibatam
28 sheet metal work 80 Polibatam
NDT penetrant, magnetic
29 32 Polibatam
particle and ultrasonic testing
30 Job/Task documentation 40 Polibatam
31 wind tunnel 40 Polibatam
Inspection and servicing
32 40 Polibatam
pneumatic system
33 landing Gear Inspection
Flushing hydraulic system, Polibatam
34 Cleaning filter and Recharging 80
accumulator
35 landing Gear system Polibatam
Partially 50 hours airframe
36 40 Polibatam
inspection
Removal and Inspection of
37 40 Polibatam
cockpit window
38 Aircraft fuel system 40
Inspection of wheel and brake
39 40 Polibatam
assy
40 Aircraft Wiring Practice 40 Polibatam
41 aileron maintenance
42 Rudder Maintenance 80 Polibatam
43 Elevator maintenance
Cabin Atmosphere control and
44 40 Polibatam
Pressurization system
45 Air conditioning system 40
46 Ice and Rain Protection 40 Polibatam
47 thrust reverser system 16 Polibatam
48 Fire control system 40 Polibatam
49 Engine construction
50 Engine fuel system
Engine ignition & starting
51
system
52 Engine indication system
53 Engine cooling system
54 Engine fuel metering system 248 Polibatam
Engine monitoring and ground
55
operation
56 Engine induction system
57 Engine lubrication system
58 Engine Exhaust system
59 Powerplant preservation
Fix/controllable pitch propeller
60
maintenance 80 Polibatam
80 Polibatam
61 propeller governor
62 Engine construction
63 Engine Instrument Systems
64 Engine Lubrication Systems
65 Ignition and Starting Systems
66 Engine Fuel Systems
Engine Induction and Engine
67 248 Polibatam
Airflow Systems
68 Engine Cooling Systems
Engine Exhaust and Reverser
69
Systems
Engine motoring and ground
70
operation
2040
4A
22-26 Maret 2021

21 Juni - 2 July 2021

3-7 January 2022

27-31 Desember 2021

24-Jan-22

21 Juni - 2 July 2021

5-9 July 2021


26-30/7
2 - 6 Agustus 2021
8-10 November 2021

5-7 April 2021

11-16 November 2021


2 - 6 Agustus 2021
17-19 November 2021

29 Maret-1 April 2021

8-9 April 2021


26 -30 July 2021

17-21 january 2022

10-14 January 2022


12-29 April 2022
20-24 Desember 2021
6-17 Desember 2021
22-26 November 2021
8 -12 Agustus 2022
15-19 Maret 2022
25-28 January 2022

14-18 Maret 2022

29 Nov-3 Des 2021


21-25 February 2022

1-4 Maret 2022


14 -18 November 2022
7-11 Maret 2022
18-22 April 2022

4 - 14 April 2022

21-25 Maret 2022


7 -11 November 2022
28 Maret-1 April 2022
12-14 Oktober 2022
21 -25 nov 22

22 Juni - 5 Agustus 2022

24 Oktober-4 November 2022


24 Oktober-4 November 2022

15 Agustus - 11 Oktober 2022