No Module Duration Actual

1 Wind Tunnel 40
2 identify hangar and work shop safety precaution 40
3 Use of common tools
4 Measuring by vernier caliper
40
5 Measuring by micrometer
6 Measuring by torque meter
7 Identify aircraft fastener and material 16
8 attachment safety wire and cotter pin 24
9 Bench working 80
10 Demonstration using electric measurement devices 24
11 Identify and check various type of resistor,capacitor and inductor 40
12 Electrical power gen.practice 40
13 cutting, flaring and bending tube 24
14 Swaging cable 16
15 control cable system 24
16 Corrosion Inspection 24
17 Removal and installation aircraft instruments 24
18 Fabrication and repair of composite material 40
19 heat treatment 24
20 NDT penetrant, magnetic particle and ultrasonic testing 32
21 landing Gear system 24
22 sheet metal work 80
23 Welding 40
24 DC Generator maintenance
40
25 Measuring thermocouple
26 Lead Acid Battery and Nicad Battery 40
27 aircraft jacking
28 Aircraft weighing
80
29 Removal/Installation Nose and Wheel assy
30 Lubrication on Cessna 172
31 AC measurements and operational of oscilloscope 16
32 Inspection and servicing pneumatic system 40
33 Partially 50 hours airframe inspection 40
34 Removal and Inspection of cockpit window 40
35 Inspection of wheel and brake assy 40
36 landing Gear Inspection
37 Flushing hydraulic system, Cleaning filter and Recharging accumulator
38 Cabin Atmosphere control and Pressurization system 40
39 Ice and Rain Protection 40
40 aileron maintenance
80
41 Rudder Maintenance 80
42 Elevator maintenance
43 Aircraft Wiring Practice 40
44 Engine construction
45 Engine fuel system
46 Engine ignition & starting system
47 Engine indication system
48 Engine cooling system
49 Engine fuel metering system 248
50 Engine monitoring and ground operation
51 Engine induction system
52 Engine lubrication system
53 Engine Exhaust system
54 Powerplant preservation
55 Job/Task documentation 40
56 Engine construction
57 Engine Instrument Systems
58 Engine Lubrication Systems
59 Ignition and Starting Systems
60 Engine Fuel Systems 248
61 Engine Induction and Engine Airflow Systems
62 Engine Cooling Systems
63 Engine Exhaust and Reverser Systems
64 Engine motoring and ground operation
65 thrust reverser system 16
66 Fix/controllable pitch propeller maintenance
80
67 propeller governor
68 Air conditioning system 40
69 Aircraft fuel system 40
70 Fire control system 40
Location 4A Duration on Taskcard
Polibatam 15-19 Maret 2021 40
Polibatam 22-26 Maret 2021 24
16
16
Polibatam 29 Maret-1 April 2021
16
16
Polibatam 5-7 April 2021 16
Polibatam 8-9 April 2021 24
Polibatam 12-29 April 2022 68
Polibatam 24
21 Juni - 2 July 2021
Polibatam 40
Polibatam 5-9 July 2021 24
Polibatam 24
26 -30 July 2021
Polibatam 16
Polibatam 24
2 - 6 Agustus 2021
Polibatam 24
Polibatam 8-10 November 2021 16
Polibatam 11-16 November 2021 32
Polibatam 17-19 November 2021 24
Polibatam 22-26 November 2021 32
Polibatam 29 Nov-3 Des 2021 24
Polibatam 6-17 Desember 2021 96
Polibatam 20-24 Desember 2021 32
Polibatam 24
27-31 Desember 2021
Polibatam 24
Polibatam 3-7 January 2022 32
Polibatam 24
10-14 January 2022
Polibatam 16
Polibatam 32
17-21 january 2022
Polibatam 24
Polibatam Monday, January 24, 2022 16
Polibatam 25-28 January 2022
Polibatam 21-25 February 2022 40
Polibatam 1-4 Maret 2022 40
Polibatam 7-11 Maret 2022 40
Polibatam 32
14-18 Maret 2022
Polibatam
Polibatam 21-25 Maret 2022 40
Polibatam 28 Maret-1 April 2022 40
Polibatam 24
4 - 14 April 2022
Polibatam 4 - 14 April 2022 24
Polibatam 32
Polibatam 18-22 April 2022 40
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam 22 Juni - 5 Agustus 2022 248
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam 8 -12 Agustus 2022 40
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam 15 Agustus - 11 Oktober 2022 246
Polibatam
Polibatam
Polibatam
Polibatam
Polibatam 12-14 Oktober 2022 16
Polibatam 40
24 Oktober-4 November 2022
Polibatam 40
Polibatam 7 -11 November 2022 40
Polibatam 14 -18 November 2022 40
Polibatam 21-25 November 2022 40