This document summarizes the monitoring of pile installation for the SOP-Sakinah project from October 19th to 29th. A total of 328 piles were to be installed, with diameters of 80cm. As of the 29th, 26 piles accounting for 7.927% of the total had been completed, with 16 on the northern side and 10 on the southern side. Details such as pile numbers, depths, elevations, and installation dates are provided for each side. One test pile was also installed on October 12th and tested on the 18th, with a measured load capacity exceeding the required capacity.
This document summarizes the monitoring of pile installation for the SOP-Sakinah project from October 19th to 29th. A total of 328 piles were to be installed, with diameters of 80cm. As of the 29th, 26 piles accounting for 7.927% of the total had been completed, with 16 on the northern side and 10 on the southern side. Details such as pile numbers, depths, elevations, and installation dates are provided for each side. One test pile was also installed on October 12th and tested on the 18th, with a measured load capacity exceeding the required capacity.
This document summarizes the monitoring of pile installation for the SOP-Sakinah project from October 19th to 29th. A total of 328 piles were to be installed, with diameters of 80cm. As of the 29th, 26 piles accounting for 7.927% of the total had been completed, with 16 on the northern side and 10 on the southern side. Details such as pile numbers, depths, elevations, and installation dates are provided for each side. One test pile was also installed on October 12th and tested on the 18th, with a measured load capacity exceeding the required capacity.
20+375 ~ 20+652,50) Status s/d hari ini : Terlaksana (titik) Bobot
Diameter CSP : 80 cm 29 Oktober 2023 Utara : 16 4,878% Jumlah Titik Pancang : 328 Waktu terjalani : Selatan : 10 3,049% Start Pemancangan : 19 Oktober 2023 11 hari kalender Total : 26 7,927% SISI UTARA SISI SELATAN Tanggal Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang No. Keterangan No. Keterangan Titik TP (m) Platform (m) Titik TP (m) Platform (m)