You are on page 1of 5

Monitoring Pemancangan SOP-3 (Sta.

20+930 ~ 22+235) Terlaksana (titik) Bobot


Status :
Diameter CSP : 80 cm Utara : 70 4,916%
Jumlah Titik Pancang : 1.424 21 Agustus 2023 Selatan : 207 14,537%
Total : 277 19,452%
SISI UTARA SISI SELATAN
Tanggal
Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang
No. Keterangan No. Keterangan
Titik TP (m) Platform (m) Titik TP (m) Platform (m)

27-Jul-23 1 A1 S1 22,00 8,450 16,50 test pile, GSMS

28-Jul-23 1 PH21 U1 32,00 4,395 24,00 test pile, RPI 1 PH22 S1 32,00 4,941 23,80
2 PH22 S2 32,00 4,941 23,80
29-Jul-23 1 PH21 U2 32,00 4,395 24,00 1 unit pancang 1 PH21 S2 32,00 4,941 23,70 1 unit pancang
2 PH20 U1 32,00 4,394 22,50 2 Welding 2 PH21 S1 32,00 4,941 23,60 3 Welding
3 PH20 S1 32,00 4,942 23,50
4 PH20 S2 32,00 4,942 23,60
30-Jul-23 1 PH20 U2 32,00 4,463 23,50 1 unit pancang 1 PH19 S1 32,00 5,118 23,95 1 unit pancang
2 PH19 U1 32,00 4,463 23,60 2 PH19 S2 32,00 5,117 23,50
3 PH19 U2 32,00 4,490 23,50 3 PH18 S1 32,00 5,102 23,70
4 PH18 S2 32,00 5,102 23,70
31-Jul-23 1 PH18 U1 22,00 4,606 21,50 1 unit pancang 1 PH17 S2 32,00 5,291 23,50 1 unit pancang
2 PH18 U2 22,00 4,657 20,70 2 PH17 S1 32,00 5,178 23,10 EJ-PS3

3 PH17 U1 22,00 4,561 19,50 EJ-PS3 3 PH16 S1 32,00 5,340 23,50


4 PH17 U2 22,00 4,403 19,70 4 PH16 S2 32,00 5,400 23,50
5 PH16 U1 22,00 4,587 19,50 5 PH15 S2 32,00 5,379 23,50
6 PH16 U2 22,00 4,609 18,50 6 PH15 S1 32,00 5,476 23,50
1-Aug-23 1 PH15 U1 22,00 4,462 19,20 1 unit pancang 1 PH19 S3 32,00 5,144 23,70 1 unit pancang
2 PH15 U2 22,00 4,524 18,80 2 PH19 S4 32,00 5,117 23,80
3 PH22 U3 32,00 4,557 23,50 3 PH18 S3 32,00 5,204 23,60
4 PH22 U4 32,00 4,555 23,50 4 PH18 S4 32,00 5,159 23,50
5 PH17 S4 32,00 5,204 23,00
6 PH17 S3 32,00 5,199 23,50
2-Aug-23 1 PH21 U3 32,00 23,50 1 unit pancang 1 PH16 S3 32,00 21,90 1 unit pancang
2 PH21 U4 32,00 23,50 2 PH16 S4 22,00 21,60
3 PH20 U3 32,00 23,40 3 PH15 S3 22,00 21,70
4 PH20 U4 32,00 23,50 4 PH15 S4 22,00 21,60
5 PH19 U4 32,00 23,50 5 PH14 S4 22,00 21,50
6 PH19 U3 32,00 21,50 6 PH14 S3 22,00 21,60
7 PH13 S3 22,00 21,00
8 PH29 S3 32,00 24,00 1 unit pancang
9 PH29 S4 32,00 24,00
10 PH30 S3 32,00 24,30
11 PH30 S4 32,00 25,50
12 PH31 S4 32,00 24,50
3-Aug-23 1 PH18 U4 22,00 20,70 1 PH12 S3 22,00 20,50 1 unit pancang
2 PH18 U3 22,00 20,50 2 PH12 S4 22,00 19,50
3 PH17 U4 22,00 20,00 3 PH11 S3 22,00 19,50
4 PH13 S4 22,00 20,80
5 PH11 S4 22,00 18,70
6 PH10 S3 22,00 18,60
7 PH31 S3 32,00 24,30 1 unit pancang
8 PH32 S4 32,00 24,00
9 PH32 S3 32,00 24,40
Monitoring Pemancangan SOP-3 (Sta. 20+930 ~ 22+235) Terlaksana (titik) Bobot
Status :
Diameter CSP : 80 cm Utara : 70 4,916%
Jumlah Titik Pancang : 1.424 21 Agustus 2023 Selatan : 207 14,537%
Total : 277 19,452%
SISI UTARA SISI SELATAN
Tanggal
Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang
No. Keterangan No. Keterangan
Titik TP (m) Platform (m) Titik TP (m) Platform (m)

4-Aug-23 1 PH17 U3 22,00 20,20 1 PH34 S4 32,00 25,00


2 PH16 U4 22,00 19,50 2 PH34 S3 32,00 25,00
3 PH16 U3 22,00 19,50 3 PH33 S3 32,00 24,00
4 PH33 S4 32,00 24,50
5 PH35 S4 32,00 24,00
6 PH35 S3 32,00 23,00
7 PH36 S4 32,00 23,00
5-Aug-23 1 PH15 U4 22,00 19,00 1 PH36 S3 32,00 25,30
2 PH15 U3 22,00 19,00 2 PH37 S4 32,00 23,00
3 PH14 U4 22,00 18,50
4 PH14 U3 22,00 17,50
5 PH13 U3 22,00 17,50
6 PH13 U4 22,00 18,50
7 PH12 U4 22,00 17,00
6-Aug-23 1 PH12 U3 22,00 16,20 1 PH28 S1 32,00 25,20
2 PH11 U4 22,00 16,30 2 PH28 S2 32,00 24,70 PDA, 18/8

3 PH11 U3 22,00 15,20 3 PH29 S1 32,00 24,90


4 PH10 U3 22,00 15,00 4 PH29 S2 32,00 24,00
5 PH10 U4 22,00 17,50 5 PH30 S1 32,00 24,50
6 PH9 U4 22,00 17,00 6 PH30 S2 32,00 24,00
7 PH9 U3 22,00 17,50 7 PH31 S2 32,00 24,00
8 PH37 S3 32,00 23,50
9 PH38 S3 32,00 22,50
10 PH38 S4 32,00 23,50
11 PH39 S3 32,00 23,00
12 PH39 S4 32,00 23,20
13 PH40 S3 32,00 23,00
14 PH40 S4 32,00 23,50
7-Aug-23 1 PH41 S3 22,00 20,00
2 PH41 S4 22,00 20,50
3 PH42 S4 22,00 18,50
4 PH31 S1 32,00 25,00
5 PH42 S3 22,00 17,80
6 PH43 S4 22,00 18,00
7 PH32 S2 32,00 24,00
8 PH43 S3 22,00 18,20
9 PH32 S1 32,00 25,50
10 PH44 S4 22,00 17,00
11 PH44 S3 22,00 17,50
12 PH33 S2 32,00 24,00
8-Aug-23 1 PH14 U2 22,00 18,20 1 unit pancang 1 PH45 S4 22,00 17,50 2 unit pancang
2 PH14 U1 22,00 18,50 2 PH33 S1 32,00 25,80
3 PH13 U2 22,00 17,50 3 PH34 S2 32,00 25,70
4 PH13 U1 22,00 18,00 4 PH45 S3 22,00 17,50
5 PH46 S3 22,00 17,00
6 PH46 S4 22,00 17,50
7 PH47 S4 22,00 17,00
8 PH34 S1 32,00 26,30
9 PH47 S3 22,00 17,00
10 PH48 S3 22,00 18,00
11 PH48 S4 22,00 17,50
12 PH35 S2 32,00 25,00
13 PH35 S1 32,00 25,00
Monitoring Pemancangan SOP-3 (Sta. 20+930 ~ 22+235) Terlaksana (titik) Bobot
Status :
Diameter CSP : 80 cm Utara : 70 4,916%
Jumlah Titik Pancang : 1.424 21 Agustus 2023 Selatan : 207 14,537%
Total : 277 19,452%
SISI UTARA SISI SELATAN
Tanggal
Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang
No. Keterangan No. Keterangan
Titik TP (m) Platform (m) Titik TP (m) Platform (m)

9-Aug-23 1 PH12 U1 22,00 18,00 1 unit pancang 1 PH50 S4 22,00 18,00 2 unit pancang
2 PH12 U2 22,00 17,50 2 PH36 S2 32,00 25,70
3 PH11 U1 22,00 17,50 3 PH49 S4 22,00 17,50
4 PH11 U2 22,00 16,50 4 PH49 S3 22,00 17,00
5 PH10 U2 22,00 16,50 5 PH36 S1 32,00 24,00
6 PH10 U1 22,00 15,00 6 PH50 S3 22,00 17,00
7 PH9 U1 22,00 15,00 7 PH37 S1 32,00 24,00
8 PH9 U2 22,00 15,00 8 PH51 S4 22,00 17,00
9 PH51 S3 22,00 17,50
10-Aug-23 1 PH38 S1 32,00 24,50 PDA, 18/8

2 PH38 S2 32,00 25,00


3 PH39 S1 32,00 27,50
4 PH39 S2 32,00 25,00
5 PH52 S4 22,00 16,50
6 PH52 S3 22,00 16,00
7 PH53 S3 22,00 17,50
8 PH53 S4 22,00 18,50
9 PH40 S2 32,00 25,50
10 PH54 S4 22,00 17,00
11-Aug-23 1 PH54 S3 22,00 17,50 2 unit pancang
2 PH55 S4 22,00 16,00
3 PH40 S1 32,00 25,00
4 PH41 S2 32,00 23,50
5 PH41 S1 22,00 21,30
6 PH42 S2 32,00 22,60
7 PH55 S3 22,00 14,50
8 PH42 S1 32,00 24,30
9 PH56 S3 22,00 15,00
10 PH56 S4 22,00 16,00
12-Aug-23 1 PH57 S4 22,00 17,50 2 unit pancang
2 PH57 S3 22,00 16,00
3 PH43 S2 32,00 24,60
13-Aug-23 1 PH43 S1 32,00 24,00 1 unit pancang
2 PH44 S1 32,00 24,70 PDA, 18/8

3 PH44 S2 32,00 24,30


4 PH45 S1 32,00 23,60
5 PH45 S2 32,00 22,00
6 PH46 S2 22,00 19,50
14-Aug-23 1 PH46 S1 22,00 19,50 1 unit pancang
2 PH47 S2 22,00 19,50
3 PH47 S1 22,00 18,70
4 PH48 S2 22,00 19,00
5 PH48 S1 22,00 18,00
6 PH49 S2 22,00 19,50
7 PH49 S1 22,00 19,50
8 PH50 S2 22,00 19,40
9 PH50 S1 22,00 18,50
10 PH58 S4 22,00 18,50 1 unit pancang
11 PH58 S3 22,00 18,50
Monitoring Pemancangan SOP-3 (Sta. 20+930 ~ 22+235) Terlaksana (titik) Bobot
Status :
Diameter CSP : 80 cm Utara : 70 4,916%
Jumlah Titik Pancang : 1.424 21 Agustus 2023 Selatan : 207 14,537%
Total : 277 19,452%
SISI UTARA SISI SELATAN
Tanggal
Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang
No. Keterangan No. Keterangan
Titik TP (m) Platform (m) Titik TP (m) Platform (m)

15-Aug-23 1 PH51 S1 22,00 18,50 2 unit pancang


2 PH51 S2 22,00 18,80 PDA, 18/8

3 PH59 S3 22,00 16,50


4 PH52 S2 22,00 17,80
5 PH59 S4 22,00 17,50
6 PH55 S2 22,00 16,00
7 PH54 S1 22,00 17,50
8 PH54 S2 22,00 16,50
9 PH52 S1 22,00 18,00
10 PH53 S2 22,00 19,00
11 PH53 S1 22,00 17,00
12 PH60 S4 22,00 17,00
13 PH60 S3 22,00 15,50
14 PH61 S4 22,00 15,50
15 PH61 S3 22,00 15,50
16 PH62 S4 22,00 17,00
17 PH62 S3 22,00 17,00
18 PH63 S3 22,00 15,50
19 PH63 S4 22,00 17,00
20 PH55 S1 22,00 17,00
16-Aug-23 1 PH26 U1 32,00 23,00 1 unit pancang 1 PH64 S4 22,00 14,00 2 unit pancang
2 PH26 U2 32,00 23,00 2 PH64 S3 22,00 16,00
3 PH65 S4 22,00 15,00
4 PH65 S3 22,00 16,00
5 PH56 S2 22,00 17,50
6 PH56 S1 22,00 17,50
7 PH57 S2 22,00 17,00
8 PH57 S1 22,00 18,70
9 PH66 S4 22,00 18,50
10 PH58 S2 22,00 16,70
11 PH58 S1 22,00 16,30
12 PH66 S3 22,00 16,20
13 PH67 S4 22,00 16,50
14 PH67 S3 22,00 17,00
15 PH59 S2 22,00 16,80
16 PH59 S1 22,00 16,80
17 PH68 S4 22,00 16,00
18-Aug-23 1 PH27 U3 32,00 23,50 1 unit pancang 1 PH61 S1 22,00 17,00 2 unit pancang
2 PH28 U2 32,00 24,50 2 PH61 S2 22,00 16,50
3 PH28 U1 32,00 24,00 3 PH60 S1 22,00 17,50
4 PH27 U1 32,00 23,00 4 PH60 S2 22,00 16,20
5 PH27 U2 32,00 23,50 5 PH70 S3 22,00 16,00
6 PH70 S4 22,00 16,50
7 PH69 S3 22,00 17,50
8 PH69 S4 22,00 17,00
9 PH68 S3 22,00 16,00
20-Aug-23 1 PH71 S4 22,00 17,00 1 unit pancang
2 PH71 S3 22,00 16,50
3 PH72 S4 22,00 13,50
4 PH72 S3 22,00 15,50
5 PH73 S4 22,00 14,00
6 PH73 S3 22,00 14,00
7 PH74 S4 22,00 15,50
Monitoring Pemancangan SOP-3 (Sta. 20+930 ~ 22+235) Terlaksana (titik) Bobot
Status :
Diameter CSP : 80 cm Utara : 70 4,916%
Jumlah Titik Pancang : 1.424 21 Agustus 2023 Selatan : 207 14,537%
Total : 277 19,452%
SISI UTARA SISI SELATAN
Tanggal
Pemancangan No. Panjang Elevasi Terpancang No. Panjang Elevasi Terpancang
No. Keterangan No. Keterangan
Titik TP (m) Platform (m) Titik TP (m) Platform (m)

21-Aug-23 1 PH29 U1 32,00 24,00 2 unit pancang 1 PH74 S3 22,00 14,00 2 unit pancang
2 PH27 U4 32,00 24,00 2 PH75 S4 22,00 14,50
3 PH28 U3 32,00 24,50 3 PH75 S3 22,00 15,50
4 PH28 U4 32,00 24,00 4 PH76 S4 22,00 15,50
5 PH29 U3 32,00 24,00 5 PH76 S3 22,00 14,20
6 PH30 U1 32,00 24,00 6 PH62 S2 22,00 17,30
7 PH29 U2 32,00 25,00 7 PH62 S1 22,00 17,00
8 PH30 U2 32,00 25,00 8 PH63 S2 22,00 17,00
9 PH29 U4 32,00 23,50 9 PH63 S1 22,00 17,00
10 PH64 S2 22,00 17,50
11 PH64 S1 22,00 17,00
12 PH65 S2 22,00 17,00
13 PH65 S1 22,00 17,50

24 70 1.840,00 1.432,20 Jumlah 207 5.364,00 4.142,65 Jumlah