Owner MS. KAREN DELOS SANTOS Subject PROJECT CONSTRUCTION COST ( Labor and Materials ) QTY UNIT LABOR LABOR MATERIAL MATERIAL COST OF LABOR Item SCOPE OF WORKS UNIT COST COST UNIT COST COST & MATERIAL A General Requirements Mobilization/Demobilization Permits (Const. Permit), Disposal of construction debris / material hauling SUBTOTAL A - - B Earthworks Excavation Works Column footings Footing tie beams Wall footings Slab on grade + backfill Septic vault SUBTOTAL B - - C Formworks form plywood 12mm thk (ordinary) coco lumber 50mm x 50mm x 3m coco lumber 50mm x 75mm x 3m coco lumber 50mm x 100mm x 3m common wire nail 25mm common wire nail 50mm common wire nail 75mm common wire nail 100mm Column Suspended slab Beams SUBTOTAL C - - - D Rebarworks
10mm dia. deformed bars
12mm dia. deformed bars 16mm dia. deformed bars Column Footings Footing tie beams Wall Footings Slab on Grade Column Beams + Roof Beams + Stair Suspended Slab SUBTOTAL D - - - E Concreting Works 3/4" crushed gravel G1 gravel S1 sand portland cement thoro seal/sealoproof/sahara waterproofing Footing Tie Beams Column Footings Wall Footings Slab on grade Columns Beams + Roof Beams Suspended Slabs SUBTOTAL E - - - F Structural Steel (glass canopy) Structural Steel columns Structural Steel beams Welding rods Epoxy paint primer SUBTOTAL F - - - G Steel Framings (trusses) 50 X 50mm X 3.2mm thk angle bar C-purlins 100mm x 50mm x 1.2mm thk 20mm dia. X 6000mm plain bar Welding rods Epoxy paint primer WATERPROOFING, & MOISTURE PROTECTION elastomeric paint thoro seal/sealoproof/sahara waterproofing 6mm thk aluminum insulation Roofing sheets + accessories + decking long span pre painted roof guage 24 end wall flashingsguage 24 plain g.i. sheets pre painted guage 24 silicon sealant - clear stainless gutter guage 24 rivets SUBTOTAL G - - - H Finishes FLOOR FINISHES Granite tiles-plain 400mm x 400mm 55 pcs Ceramic Tile 600mm x 600mm 125 pcs Paving Stones Pebbles black (assorted size) Cement Mortars Washed/white sand Stone Panel Flooring (Thermal) Bedroom 01 Bedroom 02 Living area Kitchen Dining Area Service Area Stairs Family Area T&B 01 T&B 02 T&B 03 Storage Hallway Parking SUBTOTAL H - - - I Wall Finishes Portland Cement Masonry Mortar Cement Board washed/white sand CHB 100mm thk CHB 150mm thk 10mm dia. deformed bars Interior walls + Exterior walls -Plain cement + block Laying SUBTOTAL I - - - J Ceiling Finishes Ground Floor / Second Floor Suspended Gypsum Plasterboard Portland Cement Plaster Soffits skim coat applied finish/gypsum boards/pvc SUBTOTAL j #REF! #REF! #REF! K Doors & jambs wood panel door for bedrooms PVC louvered flush door for T&B metal framed and full glass for service area Panel Doors for main door /bedroom mdf SUBTOTAL K - - - L Windows fiberglass framed window top-hung window for toilet and bath POWDER COATED frame with tempered glass SUBTOTAL L - M Finishing Hardwares Locksets Door Hinges SUBTOTAL OF M - - - N Carpentry Works Storage open shelves Closets Counters SUBTOTAL M - - - O Metal Works Stairs (railings…) SUBTOTAL O - - - P Miscellaneous Hardwares Drawer guides Pvc edging for shelves/screws/bolts Cabinet handles SUBTOTAL P - - - Q Painting Works Interior walls + Exterior walls (concrete) Semi-Gloss Latex c.Ceiling -flat latex finish/acretex d.Painting of carpentry works (closets. Cabinets, shelves…) SUBTOTAL Q - - - R Plumbing Works Plumbing Fixtures Watercloset Septic Tank Kitchen Sink Lavatory Other plumbing system/accessories SUBTOTAL R - - - S ROUGHING -IN(cold water system)-pipes ROUGHING -IN(sewer system)-pipes ROUGHING -IN(vent system)-pipes ROUGHING -IN(storm drain system)-pipes Installation of Plumbing Fixtures SUBTOTAL S - - - T Electrical Works Main Feeder Line Panelboards/feederlines Roughing-in works power system +Lighting Wiring works Lighting fixtures+switches Convenience outlets SUBTOTAL T - - - PROJECT COST (Labor & Materials) #REF! GATE /FENCE Grand Total Project Cost #REF! Prepared by: Karen T. Delos Santos