Appendix C: Assessment Tool for -Chapter 2 Literature Review

Minimum expectations Max \ Score


score award
ed Justification for the score
C1: Introduction- purpose of chapter stated and its
structure stated  Stated how the body is organised a well as the breakdown structure
5 5  The purpose of chapter is also stated
C2: Body - review develops a theoretical framework that  Gathered information about theoretical framework with relation to the
covers: all aspects related to the research problem and research problem
objectives; arguments and counter arguments from a wide  The theoretical framework covers various theories and arguments to why
variety of quality sources which are current, authoritative, project scope management is important
relevant, accurate and balanced; a critical analysis and  The author used other project management tools to validate the point and
synthesis other than a regurgitation; well-structured and need for his case
logical flow of discussion  Relevant and quality sources of topic
 On page 18 of the Research Project, Time Management is introduced
10 8 without flow into it.
C3: Conceptual framework –provides an indication how
measurements are to be made to achieve stated objectives  Does not clearly show how measurements will be made to achieve the
through identifying critical constructs and variables; the objectives.
review is logically structured. 5 3  The review is not properly structured
C4: Chapter summary - exists and key issues are well  Chapter summary exists
summarised with a linkage to chapter 3.  Key issues with relation to scope management addressed and its
importance shown
5 4  Chapter 3 linkage not properly shown
C:Total

25 20
Weighted

15% 3