Unit
Measurement
The measurement for payment shall be made in kilometer month or part thereof.
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to maintain the existing road which shall comprise of all the works stated below :
i) Patching of potholes
ii) Sealing of surface cracks
iii) Reinstate edge deterioration of back filled trenches
iv) Treatment to stripping of aggregate
v) Treatment for rutting
vi) Treatment to deterioration of concrete pavement
vii) Repair to concrete pavement joints
viii)Repair to paving blocks and slabs
MM11/1
11.1.2 Grass Cutting
Unit
Measurement
The measurement for payment shall be made on monthly basis or part thereof.
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to carry out the grass cutting works at the frequency of once a month at the area
stated below:
a) Road shoulder
b) Slope area
c) Berm drain, interceptor drain and all other types of drain on slopes
d) Median
Unit
Measurement
The measurement for payment shall be on the basis of a number of cycle or part thereof as
stated below :-
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to carry out the maintenance works at the frequency as stated below:
a) The works shall comprise of cleaning works and shall be carried out 4 cycles/year
b) The works shall comprise of repainting works and shall be carried out 2 years/cycle
MM11/2
11.1.4 Bridges and Culverts
Unit
Measurement
The measurement for payment shall on the basis of a number of cycle or part thereof as stated
below :-
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to carried out the maintenance works at the frequency as stated below:
a) The works shall comprise of cleaning works and shall be carried out 4 cycles/year
b) The works shall comprise of repainting works and shall be carried out 1 year/cycle
Unit
Measurement
The measurement for payment shall be the total length of completed road marking.
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to carry out the repainting of roadline marking when faded and to the satisfaction of
the S.O.
MM11/3
11.1.6 Drainage
11.1.6(a) Cleaning
Unit
Measurement
The measurement for payment shall be on the basis of 4 cycle per year or part thereof
Item Coverage
The items shall include all labour, equipments, tools, material, transport, disposal and
whatever necessary to carry out the cleaning works at the frequency as stated below:
The works shall comprise of cleaning and desilting works and shall be carried out 4
cycles/year
Unit
Measurement
Item Coverage
The items shall include all labour, equipments, tools, material, transport, disposal and
whatever necessary to carried out the repair works as stated below:
MM11/4
iii) Repair to misaligned unlined drains
11.1.7 Landscaping
Unit
Measurement
The measurement for payment shall be made in kilometer month or part thereof.
Item Coverage
The items shall include all labour, equipments, tools, material, transport, supply and whatever
necessary to maintain the landscaping works which shall comprise of maintaining all
landscaped area including trees, shrubs/bushes as described below:
c) Weeding, fertilising, insect pest and disease control, pruning and mulching and shall be
carried out once a month.
Unit
Measurement
The measurement for payment shall be made in lump sump or part thereof as and when
required or as per directed by the S.O.
Item Coverage
The items shall include all labour, equipments, tools, material, transport and whatever
necessary to carry out the works and shall comprise of all the works stated below :
a) Litter collection and disposal and shall be carried out as and when required.
b) Removal and disposal of loose material and debris as and when required.
MM11/5
11.2 ROUTINE MAINTENANCE ACTIVITIES DURING DEFECT
LIABILITY/MAINTENANCE PERIOD *
The Contractor shall provide all labour, equipments, tools, material, transport and whatever
necessary to maintain the existing road which shall comprise of all the works stated below:
11.2.5 Drainage
11.2.6 Landscaping